2330ORDINANCE NO 2330
COUNCIL MEMBER WOLFF INTRODUCED THE FOLLOWING ORDINANCE:
AN ORDINANCE CREATING WATER EXTENSION DISTRICT NUMBER 52 OF THE CITY
OF BLAIR, NEBRASKA; ESTABLISHING THE OUTER BOUNDRIES OF SAID DISTRICT;
DESIGNING THE SIZE, LOCATION AND TERMINAL POINTS OF THE WATER LINES
FOR SAID DISTRICT; AND REFERING TO PLANS AND SPECIFIACTIONS AND
ESTIMATE OF THE ENGINEER IN CONNECTION THEREWITH ON FILE WITH THE
CITY CLERK; REPEALING ALL ORDINANCES OR PARTS OF ORDINANCES IN
CONFLICT HEREWITH, PROVIDING WHEN THIS ORDINANCE SHALL BE IN FULL
FORCE AND EFFECT AND PROVIDING FOR PUBLICATION OF THIS ORDINANCE IN
PAMPHLET FORM.
BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF BLAIR,
NEBRASKA.
SECTION 1. The Mayor and City Council of the City of Blair, Nebraska, hereby find and
determine it is necessary and advisable to extend the municipal water system beyond the existing
system by the construction of a water main pursuant to the authority granted by Section 19-2402
R.R.S. Neb. 1943. That said water main extension shall commence at the existing water mains as
described in Section 3 hereof; that none of the properties located within the Water Extension
District hereby created are presently served by the City's existing system of water service; and that
all property within said District is either within the corporate limits of the City of Blair or within
one mile beyond such corporate limits.
SECTION 2. There is hereby created Water District Number 52, the outer boundaries of
which are included in the following described real estate, to -wit:
Lots 4 - 12 of Arbor Park Subdivision in the City of Blair, Washington
County, Nebraska.
SECTION 3. The size, location and terminal points of the proposed improvements for
Water Extension District Number 52 are described as follows:
Size and Type of Material: Six inch (6") C-900 DR -18, P.V.C. or pressure
class 300 ductile iron water main with fire hydrants and valves.
Location and Terminal Points: The location and terminal points of the
proposed improvements are extending along North 18th Avenue from
approx. 130 feet north of Highway 75 then northerly running on the east
side of North 18th Avenue to a point that is approx. 130 feet north of Arbor
Circle, City of Blair, Washington County, Nebraska.
SECTION 4. A more detailed description of the proposed improvements is shown on the
plans and specifications on file at the office of the City Clerk, City Hall, City of Blair, 218 South
16th Street, Blair, Nebraska 68008. In addition, the contract documents may be examined at the
office of JEO Engineers, 11717 Burt Street, Suite 120, Omaha, Nebraska 68154. Said plans and
specifications are hereby incorporated by reference as set forth herein. Reference should be made
to said plans and specifications for the specific sizing of pipes and mains shown above.
SECTION 5. The engineers' estimate of total construction cost for the proposed water
main improvements, as set heretofore filed with the City Clerk for Water Extension District
Number 52 is $41,000.00.
SECTION 6. All ordinances or parts of ordnances in conflict herewith are hereby
repealed.
SECTION 7. This ordinance shall be in force and effect from and after its passage,
approval and publication as provided by law.
PASSED AND APPROVED this 14th day of February, 2017.
CITY OF BLAIR, NEBRASKA
J S REALPH, MAYOR
ATTEST:
BRENDA WHEELER, CITY CLERK
(SEAL)
STATE OF NEBRASKA
WASHINGTON COUNTY
BRENDA WHEELER, hereby certifies that she is the duly appointed, qualified and acting City
Clerk of the City of Blair, Nebraska, and that the above and forgoing Ordnance was passed at a
regular meeting of the Mayor and City Council of said City held on 14th day of February, 2017.
&m.'O"A Z�JA-,t, �,-
BRENDA WHEELER, CITY CLERK