Loading...
2016-02-23 Total Coliform Monitoring Sample SiteeCITY Of BtAIQ-- . . . ..... --- v �/Se 01 a TOTAL COLIFORM MONITORING SAMPLE SITE SELECTION PROCEEDURE The City of Blair water system will use the following procedure when selecting sites to be used for Total Coliform Repeat Monitoring. 1. Blair water system will take repeat samples from the first sampling station up and/or down from the sampling station that tested positive for Coliform. 2. All repeat sites selected will be evaluated to ensure that they meet the system's criteria for a representative site. That is, the site must meet the same physical/environmental conditions of the routine sample sites of the system. Mayor Water Operator in Charge 217_311(, Date Date 1.1 218 South 16th Street • Blair, Nebraska 68008 • 402-426-4191 ° Fax 402-426-4195 • E-mail cltyofblalr@ci.blalr.ne,us aPo