Loading...
14600-2_0001.tifft DELMAR CENGAGE Learning - Visit us at www.informationDestination.com For more learning solutions, visit www.cengage.com For all your building needs visit www.iccsafe.com Aquila I HEREBY ATTEST THAT THE FOLLOWING TEST REQUIREMENT ON THE 2 PSIG GAS PIPING SYSTEM AT STREET T'-J CITY STATE �6�!021110=11 2`10, 9116''I'm 1 11 i�� FUEL LINE OR APPLIANCE REGULATORS, CAP AND SEAL THE PIPING SYSTEM(S), AND TEST WITH AIR AT A PRES- SURE OF 10 PSIG FOR AT LEAST 30 MINUTES. AFTER COMPLETION OF THE AIR TEST, INSTALL THE NECESSARY IM REGULATORS AND SOAP TEST ALL CON- Ic- NECTIONS FOR LEAKAGE." f ng Z ei CONTRACTOR- U U INSTALLER DATE ISBN-13: 978-1-4354-0122-8 ISBN-10: 1-4354-0122-0 0000 9 781435 4101 1 281� 111111111 2