14600-2_0001.tifft
DELMAR
CENGAGE Learning -
Visit us at www.informationDestination.com
For more learning solutions, visit www.cengage.com
For all your building needs visit www.iccsafe.com
Aquila
I HEREBY ATTEST THAT THE FOLLOWING
TEST REQUIREMENT ON THE 2 PSIG GAS
PIPING SYSTEM AT
STREET
T'-J
CITY STATE
�6�!021110=11 2`10, 9116''I'm 1 11 i��
FUEL LINE OR APPLIANCE REGULATORS,
CAP AND SEAL THE PIPING SYSTEM(S),
AND TEST WITH AIR AT A PRES-
SURE OF 10 PSIG FOR AT LEAST 30
MINUTES. AFTER COMPLETION OF THE
AIR TEST, INSTALL THE NECESSARY
IM REGULATORS AND SOAP TEST ALL CON-
Ic- NECTIONS FOR LEAKAGE."
f
ng Z
ei CONTRACTOR-
U U
INSTALLER
DATE
ISBN-13: 978-1-4354-0122-8
ISBN-10: 1-4354-0122-0
0000
9 781435 4101 1 281� 111111111
2