Loading...
PremierEx Master Signature.tif t Jun 13 2014 8 :30AM Premier Exteriors 4025029490 page 2 Jun. '2. 2014 2: 52 M CITY OF BLAIR (402.426.4191) No. 3737 P. 3/3 ' W C Ut 15LAlQ E , r• r r kr„ - o, lS+B Cat ROOF PERMIT SUPPORTING DOCUMENTS This supportin document includes infofmotion dealing , with particular code requirements an /or roofing permit requirements, it in no way Includies ALL particular code items. Al. o, it is your responsibility to know the 2004 International Building Code requireme is that apply,to your project. Please understand this document is only e ign6d and d stributed to aid you In your roofing permit process. A copy of the International Bui ing Cade is available for your use at the 81air Public Llbrary. I have read the above disclosure and accept this building permit documentation on my own behalf assn ing full responsibility as the owner /contractor for this project. ..• OwnerlOccupan ntract - ` City of Blair e r r 218 600h 161h fte r! - Mak NebjoAa 68408 •402- A26.4141 + Fox 402.426.4195 + E-mail c1"(btdr *0Wa1r,ne.u3 i I Jun 13 2014 8:30AM Premier Exteriors 4025029490 page 3 Jun, 12. 2014 2: 511 M CITY OF GLAIR (402, 426. 4191) No. 3737 P. 2/3 Dromi5 BUILDING PERMIT DEPOSIT AGREEMENT A, $500.0 1 refundable deposit is being collected for any new commercial, new residentla , and any additions, remodels and accessory bullding valued $10,000 or greater at the time of your building permit application. A $200 refundable deposit is being collected for any residential 'remodel, addition accessory building valued under $10,000. A $50.00 efundable deposit is being collected for all misc. permits, The City reservas the right to not refund this deposit if any of the following condifloni occur during the construction period. 1) heft of water service by the plumber, owner or general contractor. 2} II permits have not been obtained. 3) ll required insp$ctions have not been obtained. 4} ccupancy occurs prior to a final inspection. 5} rhe project is completed without a final inspection being done. 6} torrn water Management Plan inspection not obtained. (if Required) If any or all of these situations occur during construction, you may forfeit your deposit. ' I reby agree to the above conditions, and understand that should any or all of the ibove situations occur, the building permit deposit AHALL be forfeited or discouht 'upon the discretion of the City of Blair, wilding and Inspections Departmf nt. Jae Contract r /Owner ontr tar/ City of Blair i