2261 Inspection Reports.tif❑ CITY OF BLAIR
BUILDING INSPECTION{
❑ WASHINGTON COUNTY ❑ OTHER
LOCATION OF INSPECTION-
NSPECTION
FOOTING ❑ DECKFOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL
PASSED
FAILED
COMMENTS I 5
�...F..1,4,. ._
UTILITIES: ❑
SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE
PASSED
NAME
NAME OF OWNER
CONTRACTOR
PARTIAL
1 K
❑
❑
ELECTRICAL: ❑
A T_.,
f i
PASSED
1
DATE INSPECTION REQUESTED
TIME INSPECTION REQUESTED-
l
L6
PERMIT NO-y ,
TYPE�
OF INSPECTION REQUESTED
❑
❑ CONFERENCE
❑ STATUS CHECK
w i (�
MECHANICAL: ❑ROUGH
-IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑a PARTIAL
BUILDING:
FOOTING ❑ DECKFOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL
PASSED
FAILED
COMMENTS I 5
�...F..1,4,. ._
UTILITIES: ❑
SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE
PASSED
FAILED
❑
COMMENTS
PARTIAL
1 K
❑
❑
ELECTRICAL: ❑
ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT v
PASSED
FAILED
❑
PARTIAL
❑
❑
COMMENTS:
MECHANICAL: ❑ROUGH
-IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑a PARTIAL
PASSED
FAILED
❑
❑
COMMENTS:
PLUMBING: ❑
GROUNDWORKa ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIALwN 1=PASSED
FAILED
❑
PRESSURE TEST
❑
❑
COMMENTS:
❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED���
NITER/REMARKS•
INSPECTOR• DATE OF INSPECTION MADE: T
FAXED OPPD\BURT REA TO CONNECT SERVICE: ON
"WILDING INSPECTION REPORT
❑ CITY OF BLAIR E:l WASHINGTON COUNTY 0 OTHER
f
LOCATION OF INSPECTION
NAME OFOWNER . CONTRACTOR -
DATE INSPECTION REQUESTED_-�' TIME INSPECTION REQUESTED. PERMIT NOi!i2-
TYPE OF INSPECTION REQUESTED: E:l CONFERENCE E:l STATUS CHECK
BUILDING: T, -FOOTING E:l DECK FOOTING El FRAMING E:l DRYWALL [:1 FINALPARTIA�ZTIA
La -L
PAS
FAILED
COMMENTS:
❑
UTILITIES: Fj SEWER TAP D SEWER E-1 SEPTIC [:1 WATER TAP El REMOTE F1 WATER SERVICE
PASSED
FAILED
[:1 PARTIAL
❑
F -I
COMMENTS:
ELECTRICAL: F1 ROUGH INE] FINAL D PERMANENT SERVICE F1 TEMPORARY SERVICE 0 PRECONNECT
PASSED
FAILED
F1 PARTIAL
El
❑
COMMENTS:
MECHANICAL: F] ROUGH -IN F] A/C [I FURNACE El RADIANT HEAT 0 FINAL 0 PARTIAL
PASSED
FAILED
1-1
1-1
COMMENTS:
PLUMBING: F] GROUNDWORK E] ROUGH -IN 0 FINALE] WATER METER INSTALLED 0 PARTIAL
PASSED
FAILED
F-1 PRESSURE TEST
F -I
F]
COMMENTS:
F-1 OCCUPANCY GRANTED®❑ COI�TIONAL OCCUPANCY GRANTED
DATE OF INSPECTION M 12, - TIME:
FAXED OPPD\BURT REA TO CONNECT SERVICE:
BUILDING INSPECTION REPORT
❑ CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER
LOCATION OF INSPECTION t
NAME OF OWNER- s CONTRACTOR-
DATE
ONTRACTOR DATE INSPECTION REQUESTED' TIME INSPECTION REQUESTED-- PERMIT NU I`
TYPE OF INSPECTION REQUESTED:
❑ CONFERENCE ❑STATUS CHECK
--
BUILDING: ❑
---------------------
FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑' ' PARTIAL
— --.—� � --
PASS FAILED
COMMENTS:
UTILITIES: ❑
SEWER TAP ❑ SEWER ❑ SEPTICS ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE
PASSED
FAILED
❑
PARTIAL
❑
❑
COMMENTS:
ELECTRICAL: ❑
ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT
PASSED
FAILED
❑
PARTIAL
❑
❑
COMMENTS:
MECHANICAL: ❑
ROUGH—IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL
PASSED
FAILED
❑
❑
COMMENTS:
PLUMBING: ❑
GROUNDWORK ❑ ROUGH—IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIALPASSED
FAILED
❑
PRESSURE TEST
❑
❑
COMMENTS:
❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED���
DATE OF INSPECTION MADE:
FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY
43051.fd6 I — PROFESSIONAL FORMS, INC. 1-800-537-0245
-Tosp e c -J. i ej L o
BUILDING INSPECTION REPORT
CITY OF BLAIR El WASHINGTON COUNTY ❑ OTHER
-\j
LOCATION OF INSPECTION d
NAME OF OWNER- CONTRACTOR
DATEINSPECTION REQUESTED TIME INSPECTION REQUESTED -
TYPE OF INSPECTION REQUESTED -
N I-
"41 b
PERMIT NO--
E:l CONFERENCE ❑ STATUS CHECK
BUILDING: "Ef FOOTING F-1 DECK FOOTING ❑FRAMING El DRYWALL [:1 FINAL 'B"PAR.
COMMENTS -
UTILITIES:
❑ SEWER TAP ❑ SEWER ❑ SEPTIC Fl WATER TAP F-1 REMOTE F-1 WATER SERVICE
F -I PARTIAL
PASSED FAILED
PASSED FAILED
1:1 1:1
rct-
"e,
z
"'I'v -- TIME.
INSPECT R- DATE OF INSPECTION MADE: 4� ) I I ""
FAXED OPPD\BURT REA TO CONNECT SERVICE: