Loading...
BPM1999Blair Building Permit Detail Permit #: M1999 Issued: 6/25/2010 Completed: 6/28/2010 Location: 2113 Washington St Owner: Bob Pearson Address: 2113 Washington St Blair, NE 68008 Phone: 533 -2062 Section: Township: Subdivision: 45,000 BTU Furnace and 1.5 ton AC Contractors Getzschman Heating, LLC Range: Lot: 2 General Contractor Remarks Type: Mechanical Miscellaneous Valuation: Permit Fee: 30 Issue Fee: 25 Deposit Amt.: Receipt #: Block: 100 Permit # Issued Inspections Date By 6/28/2010 HOW Mechanical Final Pass 6/28/2010 HOW Final Inspection of Project Pass CITY OF BLAIR BUILDING INSPECTION REPORT LOCATION OF INSPECTION: NAME OF ❑ WASHINGTON COUNTY 1 4, INSPECTOK - DATE OF INSPECTION MADE: f C' TIME f U FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY DATE INSPECTION REQUESTED PERMIT NO w TIME INSPECTION R TYPE OF INSPE CTION REQUESTED: EICONFERENCE E:l STATUS CHECK BUILDING: F FOOTING [:1 DECK FOOTING [:1 FRAMING [:1 DRYWALL M, FINAL [:] PARTIAL PASSED FAILFD COMMENTS: UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE [-] WATER SERVICE PASSED FAILED F] PARTIAL El F COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED F PARTIAL COMMENTS: MECHANICAL: [EF:l ROUGH IN' A J��[ /C_ ❑ RADIANT HEAT ❑ FINAL El PARTIAL PASSED FAILED COMMENTS: PLUMBING: F ✓ GROUNDWORK ❑ ROUGH-IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED El PRESSURE TEST El F COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED INSPECTOK - DATE OF INSPECTION MADE: f C' TIME f U FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY MECHANICAL PERMIT APPLICATI Jurisdiction of City of Blair, Nebraska 218 South 16 Street Blair, Nebraska 68008 Fax (402) 426 -4195 M 1999 // (402) 426 -4191 - Application Date: Cl� ' �� Permit Fee: $ Job Address !� / (J ' Owner Mail Address 6 1 Zip Phone 1. L�e tiff Contract r Mail Address r Zip Phone 2. 1 Z&6 7 Z t f � 3. Class of Work: O COMMERCIAL O RESIDENTIAL O New O Addition O Alteration O Repair O Replacement Describe Work: 0 MECHANICAL PERMIT FEES Heat Pump Tons Central A/C Tons Furnace/Heat Pump /Air Conditioner (Per Unit) Furnace BTU /H Up to and including 100,000 BTU / 3Ton ... .........................$15.00 # of Units A/C Fumace/Heat Pump /Air Conditioner (Per Unit) Furnace Over 100,000 BTU / 3 Ton .................... .........................$25.00 Completion Date: Refrigeration Units /Coolers/Lines /Compressor — Commercial (New or Replacement) (Per Unit) Boiler Chart BTUFee ...................... ............................... .........................$15.00 Up to 100, 000 ....... .........................$15.00 100,000- 500, 000 .............................. $30.00 500,000 -1, 000 ,000 ........................... $40.00 1,000,000 -1, 750,000 ........................ $60.00 Over 1, 750, 000 ...... ........................$100.00 Boiler (use BTU Chart to left) .................... Appliance Vent/Fans ........................$10.00 Notice Duct System ......... .........................$15.00 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of Gas /Air Outlets .................First 5 x $6.00 work will be complied with whether specified herein or not. The granting of a permit does not presume to give .........Additional x $1.00 authority to violate or cancel the provisions of any other state or local law regulating construction or the Radiant Heat Systems /Gas /Water performance of construction. Piping System ....... .........................$50.00 ' 6-� - Modular Home ............................... $50.00 Signature of Contractor or Authorizedent Permit Issuance Fee . .........................$25.00 per, ®� Total t Current License on File >CrYes O No C] N/A Date Comment: Id WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS 1 YO UR PERMIT Approved By: Rev. 2008 - 10 N BUILDING INSPECTION REPORT ❑ ,_ CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHE LOCATION OF INSPECTION NAME OF OWNER . . =,'. "✓ ! .. r< `oua CONTRACTO DATE INSPECTION REQUESTED ( 2 " TIME INSPECTION REQUESTED:- " ' -` "� Q PERMIT NO TYPE OF INSPEC REQ ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL FINAL ❑ PARTIAL P SSED FAILED COM MENTS: UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: - - - - - -- --- - — - - - _ ELECTRICAL: F ROUGH IN F1 FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: MECHANICAL:❑ ROUGH IN A/C , .FURNACE ❑ RADIANTHEAT ❑� FINAL ❑ PARTIAL PASSED FAILED COMMENTS: PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST ❑ ❑ COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED � INSPECTO 72 DATE OF INSPECTION MADE: - f C T1MF� `� P& FAXED OPPDIBURT REA TO CONNECT SERVICE: G- ]BUILDING INSPECTION REPORT PASSED [],_J CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHE PARTIAL ❑ ❑ COMMENTS: LOCATION OF INSPECTIO MECHANICAL:❑ ROUGH IN ❑ A/C El ..- FURNACE ❑ RADIANT HEAT n FINAL ❑ PARTIAL - PASSED NAME OF OWNER , .- .r,.° / "' , �.� , � CONTRACTO - -> DATE INSPECTION REQUESTED � r TIME INSPECTION REQUESTED`. '`'_" ° PERMIT NO j S TYPE OF INSPECTIO REQ UESTED: ❑ C ❑ S TATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL rQ, FINAL ❑ PARTIAL PASSED FAILED GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED El COMME NTS: PRESSURE TEST ❑ UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED r' ❑ PARTIAL ❑ ❑ COM MENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: MECHANICAL:❑ ROUGH IN ❑ A/C El ..- FURNACE ❑ RADIANT HEAT n FINAL ❑ PARTIAL - PASSED FAILED ❑ COMMENTS: _ __ _ _ __ _ PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST ❑ ❑ COMMEN ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED INSPECTO DATE OF INSPECTION MADE: G T c FAXED OPPD\BURT REA TO CONNECT SERVICE: ON B