Loading...
BPM1962Blair Building Permit Detail Permit #: M1962 Issued: 3/9/2010 Completed: 3/30/2010 Location: 2043 Arbor Cir Owner: Linda Harkey Address: 2043 Arbor Cir Type: Mechanical Miscellaneous Valuation: Blair, NE 68008 Phone: 402 426 1971 Section: Township: Range; Subdivision: Lot: 80,000 BTU furnace and 3 ton heat pump replacement Contractors Beebe Refrigeration, Htg. & A/C, Inc. Remarks General Contractor Permit Fee: 30 Issue Fee: 25 Deposit Amt.: Receipt #: Block: Permit # Issued Inspections Date By 3/30/2010 HOW Final Inspection of Project Pass RIA BUILDING INSPECTION REPORT 9 It 9 7 '15 ❑"CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHE A LOCATION OF INSPECTION -1 4' CONTRACTOR NAME OF I;L DATE INSPECTION REQUESTED �_ TIME INSPECTION REQUESTED c PERMIT NO TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL AL PARTIAL PASSED FAILED COMMENTS: D UTILITIES: F SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED COMMENTS: F PARTIAL El n ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICED PRECONNECT PASSED FAILED COMMENTS: F] PARTIAL MECRANICAL:F] ROUGH-IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT, I D-fiNAL ❑ PARTIAL PASSED FAILED COMMENTS: PLUMBING: F GROUNDWORK ❑ ROUGH-IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST F ❑ COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS- — � TIM INSPECTOR*--------- DATE OF INSPECTION MADE: FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY MECHANICAL PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16 Street Blair, Nebraska 68008 Fax (402) 426-4195 (402) 426-4191 Application Date: -�� K, I 10 Zk" , Job Address Ow er Mail Address Zip Phone Contrn 2. Mail Address zip Phone 3. Class of Work: 0 (*IMMF CIAL RESIDENTIAL ❑ New"" 0 Addition 13 Alteration C] Repair Replacement Describe Work: 4. MECHANICAL PERMIT FEES Heat Pump Q Tons Central A/C Tons Fumace/Heat Pump/Air Conditioner (Per Unit) Furnace BTU/H Up to and including 100,000 BTU / 3Ton ... ......................... # of Units A/C Furnace/fleat Pump/Air Conditioner (Per Unit) Furnace Over 100,000 BTU / 3 Ton ............................................. $25m Completion Date: lb f C) VN ry 1 Refrigeration Units/Coolers/Lines/Compressor — Commercial (New or Replacement) (Per Unit) Boiler Chart BTU Fee .............................................................. ............... $15.00 Up to 100,000 ....... ......................... 100,000-500,000 .............................. $30.00 500,000-1,000,000 ........................... $40.00 1,000,000-1,750,000 ........................$60.00 Over 1,750,000 ...... ........................$100.00 Boiler (use BTU Chart to left) .................... Appliance Vent/Fans ........................$10.00 Notice 1 hereby certify that I have read and examined this Duct System ......... ......................... application and know the same to be true and correct. All provisions of laws and ordinances governing this type o f Gas/Air Outlets ................. 5 x $6.00 work will be complied with whether specified herein or not. The granting of a permit does not presume to give ......... Additional x $ 1.00 authority to violate or cancel the provisions of any other state or local law regulating construction or the Radiant Heat Systems/Gas/Water performance of construction. Piping System ................................ $50.00 Modular Home ............................... $50.00 Signature,of Contractor or Authorized Agent Permit Issuance Fee .......................... $25.00 Total C,� e) /z) Current License on File -511des 13 No C] N/A Date Comment: WHEN FRUPEKLY VALIDA'IED (IN THIS SPACE) THIS IS YOUR PERMIT Approved By: ca M 1962 Permit Fee: $ Rev. 2008-10 ,-- fNSPECTORL-- .;k�" DATE OF INSPECTION MADE: a U T r v FAXED OPPD\BURT REA TO CONNECT SERVICE: ON B BUILDING INSPECTION REPO 6 RT 3 �a6- 9 (f9 7 ,❑, OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION 4 NAME OFOWNEk CONTRACTOR DATE INSPECTION REQUESTED I SPECTION REQUESTED PERMIT NO- TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE F STATUS CHECK BUILDING: ❑ FOOTING [:] DECK FOOTING E:l FRAMING E:l DRYWALL ❑ PARTIAL PASSED FAILED ❑ COMMENTS: UTILITIES: F SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED F PARTIAL COMMENTS: ELECTRICAL: F ROUGH IN F FINAL F PERMANENT SERVICE ❑ TEMPORARY SERVICE F PRECONNECT PASSED FAILED ❑ PARTIAL ❑ F COMMENTS: MECHANICAL:F ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT - ❑ PARTIAL PASSED FAILED El COMMENTS: PLUMBING: F GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST ❑ F COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS7 ,-- fNSPECTORL-- .;k�" DATE OF INSPECTION MADE: a U T r v FAXED OPPD\BURT REA TO CONNECT SERVICE: ON B