05-1982Building Application Type of Estimated Permit
Permit No. Date Construction Location Owner Contractor Cost Fee
3379 4/30/82 Add room 1349 Nebr St. David Schneider T. Pedersen 6,000.00 30.00
3380 5/5/82 Build an Add. 1364 Washinon Nebr - Iowa(C & J)J. Jorgensen 3,900.00 15.00
3381 5/5/82 Body Shop River Road Don Leehy /John Rahlfs J. Jorgensen 10,500.00 40.00
3382 5/5/82 Replace Garage 1630 Grant M. Stanley Jensen J. Jorgensen 2,900.00 15.00
3383 5/7/82 Add room 732 No 11 John Abbott J B Long 4,999.00 15.00
3384 5/10/82 Fence 724 No 10 Ave. Steve Ray Steve Ray 350.00 5.00
3385 5/17/82 Craft Shop R. R. # 2 John Henton John Henton 4,000.00 15.00
3386 5/18/82 Remodel House 423 No 22 Le Roy Larsen LeRoy Larsen 5,000.00 30.00
3387 5/19/82 Foundation /porch 1917 Lincoln James Warden Jerry Jorgensen 850.00 5.00
3388 5/27/82 Replace Sign 137 So 16 Blair Liquor Park B1 Liq Pk 898.00 5.00
BUILDING ACTIVITY REPORT
MONTH OF MAY, 1982