Loading...
BPM1906 Permit #: M1906 Issued: Completed: Location: 1600 State St Owner: Corner Retreat Address: 1600 State St Blair, NE 68008 Phone: Section: Subdivision: Replacing 4 ton heat pump. Township: Contractors Beebe Refrigeration, Htg. & NC, Inc. Remarks 8/26/2009 Inspections Date 8/26/2009 8/26/2009 HOW By HOW HOW Blair Building Permit Detail S tJ~ (:) ;; 8/19/2009 8/26/2009 Type: Mechanical Miscellaneous Valuation: Range: Lot: 28,29,30 General Contractor 1. heat pump-final-ok-hw. Mechanical Final Final Inspection of Project Permit Fee: 25 Issue Fee: 25 Deposit Amt.: Receipt #: Block: 15 Permit # Issued Pass Pass ~t.{. []cCITY OF BLAIR BUILDING INSPECTION REPORT o WASHINGTON COUNTY o OTHER , . ~r/., ),/,' /-I'i ~'. ,/ " ,"./ c.,." L~"""- ,,{ f LOCATION OF INSPECTION' TIME INSPECTION REQUESTED' NAME OF DATE INSPECTION REQUESTED' I,';' TYPE OF INSPECTION REQUESTED: 0 CONFERENCE BUILDING: 0 FOOTING 0 DECK FOOTING 0 FRAMING 0 DRYWALL DPINAL 0 PARTIAL COMMENTS: 'S" t:. : UTILITIES: 0 SEWER TAP 0 SEWER 0 o PARTIAL o STATUS CHECK ~,IED FAILED ~. 0 REMOTE 0 WATER SERVICE PASSED FAILED o 0 COMMENTS: ELECTRICAL: 0 ROUGH INO FINAL 0 PERMANENT SERVICE 0 TEMPORARY SERVICE 0 PRECONNECT o PARTIAL PASSED FAILED o 0 COMMENTS: MECHANICAL: 0 ROUGH-IN 0 AlC 0 FURNACE 0 RADIANT HEAT o PARTIAL FAILED o COMMENTS: PLUMBING: 0 GROUNDWORK 0 ROUGH-IN 0 FINAL 0 WATER METER INSTALLED 0 PARTIAL o PRESSURE TEST PASSED FAILED o 0 COMMENTS: o OCCUPANCY GRANTED 0 CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS' INSPECTOR' ~PM+ DATE OF INSPECTION MADE: ~. 'J-b~b9 TlMP' 10.: ~ FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY oj MECHANICAL PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 Fax (402) 426-4195 (402) 426-4191 Application Date: cJ'... / 9- tJ 1 Job Address Heat Pump t.f Tons Central AlC Tons Furnace BTU/H # of Units AlC Furnace Completion Date: 8- ;;? t/- t) 'l Boiler Chart BTU Fee Up to 100,000........................ ..... ...$15.00 100,000-500,000.................. ......... ...$30.00 500,000-1;000,000............ ..... .......... $40.00 1,000,000-1,750,000... ................. .. ..$60.00 Over 1,750,000.................... ....... ...$100.00 Notice I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions oflaws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date - .,....-- - c ,_ _.". ___ ;t\'I190(i Zip Zip Phone o Repair 0 Replacement t:f~ t- :ANICAL PERMIT FEES Furnace/Heat Pump/Air Conditioner (Per Unit) Up to and including 100,000 BTU / 3 Ton.. ......... .............. ...$15.00 Furnace/Heat Pump/Air Conditioner (Per Unit) d 6' .06 Over 100,000 BTU /3 Ton.......................................... ...$25.00 Refrigeration Units/Coolers/Lines/Compressor - Commercial (New or Replacement) (Per Unit) ................................................... ....................... ....$15.00 Boiler (use BTU Chart to left)... ...... ... ........ Appliance Vent/Fans... ...... .., ......... ...$10.00 Duct System................................ ..$15.00 Gas/Air Outlets.................First 5 x $6.00 .. . ... ...Additional x $1.00 Radiant Heat Systems/Gas/Water Piping System............ ... ......... ...... ..$50.00 Modular Home...... ... ......... ... ... ... .... $50.00 Permit Issuance Fee... ......... '" ... ........$25.00 Total d5~6 Ot) Current License on File ~ Yes 0 No 0 Nj A commen:r~ dJi"" fI--t I -' 09 WHEN PROPERL Y V ALIDA TED (IN THIS SPACE) THIS IS YOUR PERMIT I Approved By: 3- fJJ:I ~t--..I I Rev. 2008-10 ~~, BUILDING INSPECTION REPORT 1:3' CITY OF BLAIR LOCATION OF INSPECTION' J'/;;':~; ,<:;) t:::::> D W ASHlNGTON COUNTY NAME OF OWNER' I,', ,.", /(,.../ ; i,>:r>'" DATE INSPECTION REQUESTED' " TIME INSPECTION REQUESTED' /' Iff!' /1 TYPE OF INSPECTION REQUESTED: D CONFERENCE BUILDING: D FOOTING D DECK FOOTING D FRAMING D DRYWALL LJPrNAL D PARTIAL D STATUS CHECK COMMENTS: UTILITIES: D SEWER TAP D PARTIAL ~ED FAILED /tt' D D WATER SERVICE PASSED FAILED D D COMMENTS: ELECTRICAL: D ROUGH IN D FINAL D PERMANENT SERVICE D TEMPORARY SERVICE D PRECONNECT D PARTIAL PASSED FAILED D D COMMENTS: COMMENTS: PLUMBING: D GROUNDWORK D ROUGH-IN D FINAL D WATERMETERINSTALLED D PARTIAL D PRESSURE TEST FAILED D MECHANICAL:D ROUGH-IN D A/C D FURNACE D RADIANT HEAT :~FiNAL D PARTIAL PASSED FAILED D D COMMENTS: D OCCUPANCY GRANTED D CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS' INSPECTOR' ~~+ DATE OF INSPECTION MADE: ~. 'J-b~b9 TIMF.' 'O.~ ~ FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY ENro SEP () 4: 2009 MECHANICAL PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 Fax (402) 426-4195 M 1906 (402) 426-4191 Qj Application Date: Cl~ / 9 - 0 1 Job Address 5) IJ Permit Fee: $ Q2;, <Z.V''L IS;; pC! I 89tfo L/-;:I/# 5/ Zip Phone 00 f... Mail Address . (.If! af Mail Address c~h-> CIAL 0 RESIDENTIAL . Ion Heat Pump l/ Tons Central AlC Tons Furnace BTU/H # of Units AlC Furnace Completion Date: g- #? tl- 0 9 Boiler Chart BTU Fee Up to 100,000.............................. ..$15.00 100,000-590,000............ ... ... .......... ..$30.00 500,000-1,000,000.................. ........ .$40.00 1,000,000-1,750,000...... ...... ........ .. ..$60.00 Over 1,750,000.................... ...... ....$100.00 Notice I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Zip Phone o New o Addition o Alteration 0 Repair 0 Replacement Furnace/Heat Pump/Air Conditioner (Per Unit) Up to and including 100,000 BTU / 3Ton............................$15.00 Furnace/Heat Pump/Air Conditioner (Per Unit) ;;? 6' .t)o Over 100,000 BTU / 3 Ton.......................................... ...$25.00 Refrigeration Units/Coolers/Lines/Compressor - Commercial (New or Replacement) (Per Unit) ............................................................................ ..$15.00 Boiler (use BTU Chart to left).............. ... ... Appliance Vent/Fans...... ... ... ...... ......$10.00 Duct System. . . .. . .. . .. . .. . .. . . . . . .. . .. .. . .. .. $15.00 Gas/Air Outlets.................First 5 x $6.00 . . . . . . .. .Additional x $1.00 Radiant Heat Systems/Gas/Water Piping System.......................... ... ...$50.00 Modular Home............................... $50.00 Permit Issuance Fee... ...... ... ..............$25.00 c::?5 00 Total L-). O() Current License on File I~ Yes 0 No 0 NjA Comment: . . ....... ~~ dJ-t 8.'"[; i "' 09 WHEN PRO PERL Y VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT I Approved By:. 'J)..iJ I CD < Li" d/~~ ?/2~1-.c)Ll Date I Rev. 2008-10 ~ MECHANICAL EW~&ft:l~PLICA TION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 Fax (402) 426-4195 (402) 426-4191 Application Date: 1/-- ;lit; -() 9 Job Address Permit Fee: $ M 1887 LftJ / Of) /3#t J* 'f. Z~.e Zip o New 0 Addition 0 Alteration 0 Repair 0 Replacement /~ 6' Itlh 4 C?: MECHANICAL PERMIT FEES Current License on File fYes 0 No 0 NjA Comment: Af Jr.,Y.':,.,...:> a auJ (;;r;>> C JJ tJ-00 ~~ ~&"' z,q /() I WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT I Approved By: <8, ?J/~ , Heat Pump Tons Central AlC /. <5 Tons Furnace BTU/H # of Units AlC Furnace Completion Date: Boiler Chart BTU Fee Up to 100,000........................ ..... ...$15.00 100,000-500,000................. ........... ..$30.00 500,000-1,000,000... ............... ......... $40.00 1,000,000-1,750,000......... ........... ... .$60.00 Over 1,750,000.................... ....... ...$100.00 Notice I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Date Furnace/Heat Pump/Air Conditioner (Per Unit) / 5, (/0 Up to and including 100,000 BTU / 3Ton......................... ...$15.00 Furnace/Heat Pump/Air Conditioner (Per Unit) Over 100,000 BTU / 3 Ton.......................................... ...$25.00 Refrigeration Units/Coolers/Lines/Compressor - Commercial (New or Replacement) (Per Unit) . .. .. . .. . . . . .. . . .. . .. .. . .. . . . . . . . .. . . .. .. . .. . . .. .. . . .. .. . . . .. . . . . . . . .. .. . . .. .. $15.00 Boiler (use BTU Chart to left)...... ... .... ....... Appliance Vent/Fans.................... ....$10.00 Duct System... ... ... ......... ... ......... ....$15.00 Gas/Air Outlets.................First 5 x $6.00 ...... ...Additional x $1.00 Radiant Heat Systems/Gas/Water Piping System... ...... ................. ... ...$50.00 Modular Home...... ......... ... ......... .... $50.00 Permit Issuance Fee... ... ... ... ... ... ........ $25.00 Total :2 5' 0'00 .00 I Rev. 2008-10