Loading...
BP13243 SJ#tf 0 61)' (J W' ~ 1 ' O~lalft!uird1i\gpermit Detail ISSU~: 6/18/2009 Type: Miscellaneous building permits Completed: 7/6/2009 Valuation: 1500 Location: 659 N 12th St E t li) JUL 0 7 Permit #: 13243 Owner: Blair Housing Authority (Holding a 50.00 Address: 758 S 16th St Permit Fee: Issue Fee: Deposit Amt.: Receipt #: Blair, NE 68008 Phone: Section: Subdivision: Township: Range: Lot: 11 Block: Egress for basement. Holding a 50.00 deposit Contractors Mel Johnson Construction General Contractor Permit # Remarks 6/22/2009 BMP Holding a 50.00 deposit until 9-22-2009. Must final all 4 permits. Inspections Date 7/6/2009 By KAR Final Inspection of Project Pass 40 25 50 24822 Issued (-JtGro,'Sd , . ,,,&~~ ffiU4?T.y ;',,11/--# all L/dcr-;..;J I BUILDING PERMIT Permit # Date: {y - ( f3 "Ocl Approximate Completion Date: 17,30.' LY1me Plan Attached: Estimated Valuation of Project: /50 () . 0 () . " 4 " /-/ tJ-fcti17 P :# 15tJ .. C,O '//~ vca)- */~6 &1 CITY OF BLAIR Application for: Permit Fee $40 + Issuance Fee $25 + $50 Deposit Fee: $115.00 V Egress Window (floor plan drawing required) {..:::. Fences (plot plan required) Gazebos (plot plan required) Patios/Driveways/Sidewalks (new or replacement) Roofing/Siding/Soffit and/or Eave Repair/Gutters Swimming Pools with Fence (plot plan required) Window/Door Replacement (size change only) Miscellaneous Building Permits (items not covered by one of the above) Description: Utility Excavation and Curb Grinding Curb Grind Length Utility Excavation Length Type: Water Fee: $75 plus bond Un. Ft.; Width ; Sewer Un. Ft ; Other Amount of Bond Posted: Bond Check # (Curb grind - $9.00 per Un. Ft.; Utility Excavation - $6.00 per Sq. Ft.) Additional Description of project if necessary: t Q/LVw 0#1 hcvwf//tP'V! /:; f (j PROJECT INFORMATION: (;t59!J / ;J (?t.:JiIt J.f. Legal Description (if applicable) ."JS {' 'I~i4 ,,4.ttJ 8...t1f/7 IS';;(C;f II //.5' PC it) r-? // IA" ~tI) owneJ;aiA/ ;iocw~~~ 4v /r~ttress: Contractor:1?1 vt/ ( /0 JtflkY 0"1'1 {1J 7 s'f /w ~tJ ~ 89oo"S'd?c'7CJ(p Job Address: Phone#: Phone #: Address: Cell #: 98/-& /_'5l~ PERMIT RENEWAL FEE: This fee is based on the amount of the original permit fee and is charged when work is not completed within two years and the permit expires. Renewals will onlv be allowed with the stipulation that all exterior site work and outside finish work is completed and interior Iife- safety issues have been properly address. Permit renewals are for one (1) year, with a maximum of two (2) renewals for a maximum permit span of four (4) years. Original valuation of $0-$50,000 $150.00 $ Original valuation of $50,000 - $100,000 $200.00 $ Original valuation of $100,000 - $500,000 $300.00 $ Original valuation of $500,000 or more $400.00 $ Issuance Fee: $ 25.00 Deposit: $ 50.00 Total Renewal Remit Fee = Permit Fee + Deposit + Issuance Fee $ Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within two (2) years of date of issue. & -/ fl ---'0 9 Date For Office Use Only WHEN PROPERLY VALIDATED (BELOW) THIS IS YOUR PERMIT D~Ot;-p~~;;'itP~i;71:7'r:'~Cj'coCR;~;l;tO#)~Zl~)~7-A~~;;;~;docb;;' ;?T.-I?;~7lJ;;;i,;"~'-R.a:~"- Jjun d~~ 1 Jjo I ,"'-, &71 NO IA " Lv CITY OF BLAIR Application for Building Permit PLOT PLAN Address B Q,,;"~ A(H,"~J-l Legal Description: Lot O/Leri) Date r n be . C '"J .~, t g -0 f Block Addition Please show all measurements of existing and contemplated structures, also show distances between structures, etc., and property lines. Is this a corner lot? '');;La- I ID ~ OJ p., o -L k ~ Line in 7 ) j "it T\" "V.'15"Jrr1 J~-_~ t~~xl~~'" .1 . l'~ _ , t''''' , tP' ,N 0> f Q1'> ~ \ \.. /f_ f..J ('"\ it-" jI N i/ 'Xc OJ i=i 'r-! ;....:j Indieat e- .North - ,:'". ..,j,e;: "'..J. t:.! 5> ib;J;lWVJ.. . J p,] A1('. 10' '1} v'-e /.-"-" '! I .( -.'. - --" --.-. '~~r" Jlf'-71 ~ I -t~ J) At - l. , ~Ar~' ;~---J :J I ._-'~!. y; I..,;;; i? __ <~ ttll '~~)" '-~-= Ii'\. I ~ '1<1 .J , , is ,dl ''b J/ Center Line of ) Applicant MQi~~ 4. 1;1 .411 ~ "i ... r"~ . .....'*' ~./: 'K_ '..,.."... . "," ':,_. -. (.: ~.~:h:.M' . . j""'!'7-"', I r'~j~""<+"1t ---..' , ... ,,'.~ ,~~~""~~~~ ...~. ' iY f r - . .. ----.J:2.!~.ilit~ - .. .. ;.. .c4/iii""" ;l;,;............. . .(" 'l.' " R . , , ~ .. . , -:-\ rl",k}' l"!>) . ""~ -- ~~ I . .., r' , _ul CITY OF BLAIR ----- ress Date APplication for Building Perm~ L ( 'T'"~ . ,~7'" ~ I rl.... b .- 18 ~.~~ l' \<A ~ po NO Addition ----- 1 Description: Lot __ Block - ..------ PleaseH show all measurements of existing an.d contemplated struotures 'show distances between structures, etc., and property lines. ' 's this a corner lot? ~ ..----- ~ " ;\ \.. ,/J 0 (Q'I') '"\J{!10~ ~ 7 f'7 }!J(') I on1~ ,r€ Indiea'te'North ~./. 70/3 ""'I pe} /,-1' i9\,1"<" :J~ ..,j9 \J1.J. 1:./ THAI\~ N,_______ f~ ql (/. .,' .""-'~""-"'''''''\'' ~~l~~~ I~ wr- --~~- , I) t \ a>~~~' ;).IJ.~.J4T~H.~-\ 11Ii1l ,. {, ".,,~ ~"-r 1<1 J /{l Pounds?t L . ." '1 _ _c~nte~ kille_of _ _ _ ~-"[tc.e,,-t_ - ~{\\ Applicant _.:Jy,9A.~~ t BUILDING INSPECTION REPORT CITY OF BLAIR 0 l" ..... .(~c;i'-'" ...,./.: .f!.",-,l "'.:"~'.~ 1h "._=,~J (-,-.Y /;'_1' /if J' .. ~.,o. . {:~1':';!~~ ""'l... - I"~ _/7 it "!""",,-'-' _'<',. LOCATION OF NAME OF DATE INSPECTION PERMIT NO' I 3;;< Lf 3 TYPE OF INSPECTION REQUESTED: D..CONFERENCE BUILDING: 0 FOOTING 0 DECK FOOTING 0 FRAMING 0 DRYWALL INAL 0 PARTIAL ":">,""~=,,",.,,,-=,,,-".I o STATUS CHECK .EAILED o COMMENTS: UTILITIES: 0 SEWER TAP 0 SEWER 0 SEPTIC 0 WATER TAP 0 REMOTE 0 WATER SERVICE o PARTIAL PASSED FAILED o 0 COMMENTS: ELECTRICAL: 0 ROUGH IN 0 FINAL 0 PERMANENT SERVICE 0 TEMPORARY SERVICE 0 PRECONNECT o PARTIAL PASSED FAILED o 0 COMMENTS: MECHANICAL:D ROUGH-IN 0 AlC 0 FURNACE 0 RADIANT HEAT 0 FINAL 0 PARTIAL PASSED FAILED o 0 COMMENTS: PLUMBING: 0 GROUNDWORK 0 ROUGH-IN 0 FINAL 0 WATERMETERINSTALLED 0 PARTIAL o PRESSURE TEST PASSED FAILED o 0 COMMENTS: o OCCUPANCY GRANTED 0 CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS' DATE OF INSPECTION FAXED OPPDmURT REA TO CONNECT SERVICE: ON BY