Loading...
BPM1872 Permit #: M1872 Issued: Completed: Location: 2143 Washington St Owner: Terry Bellamy Address: 2143 Washington St Blair, NE 68008 Phone: Section: Subdivision: 2 Ton Airconditioner. Township: . ~ ~. . ,,~, f", ; mIlE IE 08 Blair Building Permit Detail 6/1/2009 6/1/2009 Type: Mechanical Miscellaneous Valuation: Permit Fee: 15 Issue Fee: 25 Deposit Amt.: Receipt #: Range: Lot: 4 Block: 100 Contractors Washington County Heating & AlC Inc. General Contractor Remarks 6/2/2009 BMP Inspections Date 6/1/2009 6/1/2009 By KAR KAR Permit # Issued Kris had a few things that he needed Ron to do: Hook up round duct to main plunem better and tape the seams. Spoke to Ron this am and he said he went back and fixed the things Kris wanted him to fix. Mechanical Final Final Inspection of Project Pass Pass W 'L21c,CITY OF BLAIR BUILDING INSPECTION REPORT LOCATION OF INSPECTION' D WASHINGTON COUNTY D OTHER /':3" ti'/~; {~/~"\"i"S:"/':' ~;';;'/ NAME OF ., f ....) -1 "~'" (/ . DATE INSPECTION TIME INSPECTION REQUESTED' TYPE OF INSPECTION REQUESTED: D CONFERENCE BUILDING: D FOOTING D DECK FOOTING D FRAMING D DRYWALL D FINAL D PARTIAL D STATUS CHECK COMMENTS: UTILITIES: D SEWER TAP D SEWER D SEPTIC D WATER TAP D REMOTE D WATER SERVICE D PARTIAL PASSED FAILED D D COMMENTS: ELECTRICAL: D ROUGH IN D FINAL D PERMANENT SERVICE D TEMPORARY SERVICE D PRECONNECT D PARTIAL PASSED FAILED D D COMMENTS: MECHANICAL: D ROUGH-IN PASSED FAILED D D AlC D FURNACE D RADIANTHEAT'~'FINAL D PARTIAL P~ F~ED COMMENTS: PLUMBING: D GROUNDWORK D ROUGH-IN D FINAL D WATER METER INSTALLED D PARTIAL D PRESSURE TEST PASSED FAILED D D COMMENTS: D OCCUPANCY GRANTED D NOTESIREMARKS' ::Jr...fl I ~ f: fCf',{J e ~ CONDITIONAL OCCUPANCY GRANTED ~L U~ RCztnd.ou t'.f TI1 ~' '1 e ~ P,-S.. )t1O;;1 f/d/1~#~ /?e ~~ t q~' INSPECTO ' DATE OF INSPECTION TIMF.~~ IS FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY MECHANICAL PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 Fax (402) 426-4195 (402) 426-4191 8900 Lf778;;l. 'k.-Ioo I Pt!6 cQl Lf3 ~ APl?Q.lication Date: iff {J tv LIt! ; . Job Address M 1872 fi/i, 00 Permit Fee: $ '-("CI Owne 1. Contractor 2. 3. Class of Work: Describe Work: 4. Heat Pump Central AlC & Tons Tons Furnace BTU/H AlC # of Units Furnace Completion Date: Boiler Chart BTU Fee Up to 100,000..,........................... ..$15.00 100,000-500,000.., ,...,. ,., ,.. .. ........... ..$30.00 500,000-1,000,000... .., .., ... ... .. .......... $40.00 1,000,000-1,750,000.".,......"......... ..$60,00 Over 1,750,000.....,.............. ....... ...$100.00 Notice I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction, Phone . r~ o Addition Zip Phone o Alteration o Repair o Replacement MECHANICAL PERMIT FEES Furnace/Heat Pump/Air Conditioner (Per Unit) /5.pC; Up to and including 100,000 BTU / 3Ton............................$15,OO Furnace/Heat Pump/Air Conditioner (Per Unit) Over 100,000 BTU / 3 Ton......................................... ....$25,00 Refrigeration Units/Coolers/Lines/Compressor - Commercial (New or Replacement) (Per Unit) .. . .. . .. , . , . .. . . , . . .. . , . , , , , , . , . , .. . . .. .. , .. . . , , . . , .. .. .. , . . , .. . , .. . .. . . . .. , ..$15,00 Boiler (use BTU Chart to left)....., .....,.. ,..,.. Appliance Vent/Fans,.,.,..,..."..",.. ....$10.00 Duct System.....,........................... ,$15,00 Gas/Air Outlets.................First 5 x $6,00 .,.... ...Additional x $1.00 Radiant Heat Systems/Gas/Water Piping System...,., .....,.,.",.."..., ......$50.00 Modular Home..............,................ $50.00 Permit Issuance Fee... ...... ... .............. $25.00 Total J(!J. ~O tJ. OQ Current License on File ~ Yes 0 No 0 N/ A Comment: :f/fl4P' MJ~ (;" I "' () 5 WHEN PROPERL Y VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT I Approved By: 3. .f?f I~ Rev, 2008-10 ~ 'EZl.....CITY OF BLAIR BUILDING INSPECTION REPORT LOCATION OF D NAME OF . DATE INSPECTION TYPE OF INSPECTION REQUESTED: D CONFERENCE BUILDING: D FOOTING D DECK FOOTING D FRAMING D DRYWALL D FINAL D PARTIAL D STATUS CHECK PASSED FAILED D D COMMENTS: UTILITIES: D SEWER TAP D SEWER D SEPTIC D WATERTAP D REMOTE D WATER SERVICE D PARTIAL PASSED FAILED D D COMMENTS: ELECTRICAL: D ROUGH IN D FINAL D PERMANENT SERVICE D TEMPORARY SERVICE D PRECONNECT D PARTIAL PASSED FAILED D D COMMENTS: MECHANICAL: D ROUGH-IN NC D FURNACE D RADIANT HEAT D PARTIAL P~ F~ED COMMENTS: PLUMBING: D GROUNDWORK D ROUGH-IN D FINAL D WATER METER INSTALLED D PARTIAL D PRESSURE TEST PASSED FAILED D D COMMENTS: D OCCUPANCY GRANTED D -- . I NOTES/REMARKS' ",:1'-<.$ "1l I .--::- ?' rq'tJe (J CONDITIONAL OCCUPANCY GRANTED )/cetU':> R~d Put'1 /if /J ' f71e~~ // J:Pj \(r ( . () 6"(\ (C ,1110);1 f/cl//le#'T. /1e ~.V- ,~' r: INSPECTOR' CJ....~\l,( !()("':;{ { " /t7:!\,,,,,,,,,?"h. f ".1\ I (~~{)'}()?/J:;!..( l(;;}:;/"~ DATE OF INSPECTION TIMR~~ IS FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY