Loading...
BP13115 Section: 28 Subdivision: Tearing off 2 layers and replacing with metal. Permit #: 13115 Issued: Completed: Location: 8953 John Deere Ln Owner: David Nielsen Address: 8953 John Deere Ln Blair, NE 68008 Phone: 426 3684 Township: 18 Contractors SELF Remarks 2/27/2009 BMP 8/17/2009 HOW Inspections Date 8/17/2009 By HOW Blair Building Permit Detail 11/3/2008 8/14/2009 Type: Roofing permits - All types Valuation: 3500 Permit Fee: Issue Fee: Deposit Amt.: Receipt #: Range: 11 Lot: 11 Block: General Contractor Permit # Dale changed estimated completion date. I changed it back. 1. ROOF FINAL-OK-HW. Final Inspection of Project Pass 40 25 50 23380 Issued CITY OF BLAIR - MISCELLANEOUS BJ(e~~d ~MIT '_ Permit' 131 J~ Date: j J - ~ <-J Y" Approximate Completion Date: 1) l-u [( Site Plan Attached: Estimated Valuation of Project: 3,;-00 ~ Application for: Permit Fee $40 + Issuance Fee $25 + $50 Deposit Fee: $115.00 Egress Window (floor plan drawing required) Fences (plot plan required) Gazebos (plot plan required) Patios/Driveways/Sidewalks (new or replacement) Roofing/Siding/Soffit and/or Eave Repair/Gutters Swimming Pools with Fence (plot plan required) Window/Door Replacement (size change only) Miscellaneous Building Permits (items not covered by one of the above) Description: .---- 116 .00 Utility Excavation and Curb Grinding Curb Grind Length Utility Excavation Length Type: Water Fee: $75 plus bond Un. Ft.; Width ; Sewer Un. Ft ; Other Amount of Bond Posted: Bond Check # (Curb grind - $9.00 per Un. Ft.; Utility Excavation - $6.00 per Sq. Ft.) Additional Description of project if necessary:'~ 1-+ (~ ~ ~ ^Vj~() "J / ~ . PROJECT INFORMATION: Job Address: ?S s-3 Legal Description (if applicable) ., /- II Owner: I) (iN..:.J. N .uJLVV)".... Contractor: ~ Ad dress: "q OD a/I) J.8 lLO K.:pc. I J JD .1 ~ Ac... Phone#: l/,)6 ,- 3~PV Phone #: Address: Cell #: ., PERMIT RENEWAL FEE: This fee is based on the amount of the original permit fee and is charged when work is not completed within two years and the permit expires. Renewals will onlv be allowed with the stipulation that all exterior site work and outside finish work is completed and interior life- safety issues have been properly address. Permit renewals are for one (1) year, with a maximum of two (2) renewals for a maximum permit span offour (4) years. Original permit fee of $0-$50,000 $100.00 $ Original permit fee of $50,000 - $100,000 $150.00 $ Original permit fee of $100,000 - $500,000 $250.00 $ Original permit fee of $500,000 or more $400.00 $ Issuance Fee: $ 25.00 Deposit: $ 50.00 Total Renewal Remit Fee = Permit Fee + Deposit + Issuance Fee $ _ . Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within two (2) years of date of issue. D~PI1~ Signature of Owner/Contractor J/ 1J/~t5 Date Date Permit Paid: 11-3-.J? WHEN PROPERLY VALIDATED (BELOW) THIS IS YOUR PERMIT Receipt # 133 Y'O Approved by: For Office Use Only ?1tJ CITY OF BLAIR BUILDING INSPECTION REPORT o WASHINGTON COUNTY o OTHER LOCATION OF INSPECTION: -- -.,,;../!..... ,-.-. /T i~ NAME OF OWNER'. ./ )./i i'," ~", ~,. ,}._ "" >' CONTRACTOR' \{ _ 'j ;.'J Ji),__- - "-,,,,,,.,<..- Y.,' DATE INSPECTION REQUESTED". {..? / TIME INSPECTION REQUESTED' /} ,I ,/ PERMIT NO' ./' ~,.~ J j//" " TYPE OF INSPECTION REQUESTED: BUILDING: 0 FOOTING 0 DECK FOOTING 0 FRAMING 0 DRYWALL o CONFERENCE FINAL 0 PARTIAL o STATUS CHECK COMMENTS: UTILITIES: 0 SEWER TAP 0 SEWER 0 SEPTIC 0 WATER TAP 0 REMOTE 0 WATER SERVICE o PARTIAL PASSED FAILED ~ 0 COMMENTS: ELECTRICAL: 0 ROUGH IN 0 FINAL 0 PERMANENT SERVICE 0 TEMPORARY SERVICE 0 PRECONNECT o PARTIAL PASSED FAILED o 0 COMMENTS: MECHANICAL:D ROUGH-IN 0 NC 0 FURNACE 0 RADIANT HEAT 0 FINAL 0 PARTIAL PASSED FAILED o 0 COMMENTS: PLUMBING: 0 GROUNDWORK 0 ROUGH-IN 0 FINAL 0 WATER METER INSTALLED 0 PARTIAL o PRESSURE TEST PASSED FAILED o 0 COMMENTS: o OCCUPANCY GRANTED 0 CONDITIONAL OCCUPANCY GRANTED PASSED FAILED o 0 NOTES/REMARKS' DATE OF INSPECTION MADE: ~ ....( f.F-.;Q 9 FAXED OPPD\BURT REA