Loading...
BP13083 Ii" a I .:- ^ .... v t, Blair Building Permit Detail Permit #: 13083 Issued: 9/16/2008 Completed: 11/24/2008 Location: 700 Washington St Owner: Fairway Investments Address: 1715 Front St Type: Miscellaneous building permits Valuation: 10000 Blair, NE 68008 Permit Fee: 20 Issue Fee: 20 Deposit Amt.: Receipt #: Phone: Section: Subdivision: Township: Range: Lot: Block: Required by EPA for containment purposes for fuel tanks. Frost footings 20x20 area. Contractors Bart Moore Subcontracting, Inc. General Contractor Permit # Issued Remarks Inspections Date 11/24/2008 By DEM Final Inspection of Project Pass >ftUAWtJuf ~/}1rJ.Mf/j1411 f _ Yl1~ e., CITY OF BLAIR - MISCELLANEOUS BUILDiNG PERMIT . . /3MJJ~ Permit # )3083 ~f:'; Approximate Completion Date: h[31ID'b Site Plan Attached: ~ Estimated Valuation of Project: 1(\ / '00, n(\ C\ Date: I Application for: Permit Fee $20/lssuance Fee $20 Sign Erecting, Awnings (Per Sign) Roofing/Siding/Soffit and/or Eave Repair/Gutters Window/Door Replacement (Size Change Only) Egress Window (floor plan drawing required) Swimming Pools with Fence (plot plan required) Fences (plot plan required) Decks/Handicap Ramps (plot plan required) Satellite Dishes/Radio Antenna/Cell Towers (plot plan required) Gazebos (plot plan required) Miscellaneou~ Building Permits (items not covered by one of the above) Other '3 r (L.AltJ1'd (" on 1-eU l\)/y\\U'(:;,/ IJ;ja {/ Patios/Driveway Permits/Utility Excavation and Curb Grinding Fee $35 Curb Grind Length Utility Excavation Length Un. Ft.; Width Type: Water ; Sewer ; Other Fee: $40.00 Un. Ft Amount of Bond Posted: Bond Check # (Curb grind - $9.00 per Un. Ft.; Utility Excavation - $6.00 per Sq. Ft.) PERMIT RENEWAL FEE: This fee is based on the amount of the original permit fee and is charged when work is not completed within two years and the permit expires. Renewals will onlv be allowed with the stipulation that all exterior site work and outside finish work is completed and interior life- safety issues have been properly address. Permit renewals are for one (1) year, with a maximum of two (2) renewals for a maximum permit span offour (4) years. Original permit fee of $0-$50,000 $100.00 $ Original permit fee of $50,000 - $100,000 $150.00 $ Original permit fee of $100,000 - $500,000 $250.00 $ Original permit fee of $500,000 or more $400.00 $ Issuance Fee: Total Renewal Remit Fee = Permit Fee/Issuance Fee $ $ 20.00 PROJECT INFORMATION: 'TL 2\Y s~oo 3qq tv '3 IIZ~ ZILt {2-~(~~/1 100 W0~\f\I,1eY\ '+0 I ( V0~ \/ -~AA \Jf<~I'(\({'v+' jf\( Address: \ 1 b- ~F{df\+- Sf p;one#: Job Address: Legal Description (if applicable) Owner: Contractor: <.bCA(-t Aoo {e SLtl:)C()l,\~1 0 d-(f\v) Address: 1JLf J N, 2J-{+t\ A ~ ~ (~) l ell ( t0G (() ftoo Y Phone #: Lf2Lo'-C(Llf(o Cell #: Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within two (2) years of date of issue. ~C1fZfL Signature of Owner/Contractor 9-/0-06 Date For Office Use Only WHEN PROPERLY VALIDATED (BELOW) THIS IS YOUR PERMIT APprove~~C1~ Date Permit paid/9- ~(() - O~eiPt # , - '~~-",~-:~, ~ -, ,--~, . "': f' ~' _:i . 'le,' ~"""L~~"':":"~:;;";'j','~&~":' :".:a"'hl"""~,.2i!' _,J;;,,;;:::,:,~~.:...:;,~;;' ::;"" ~ .... 3/18/2008 SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN SAPP BROS BLAIR BULK OIL FACILITY PAGE 46 APPENDIX B: Secondary Containment Modifications 8.1 Site Improvements Specifications N ~,:. w~ \,......E \y" S Figure 3 - Site Improvements Sketch Legend . Ught Ex. Dike Top . . . . . . . NOT USED ~ Ex. Drainage -------- Ex. Edge of Travelway I CJ CJ I NOT USED ------, New Pond Bottom · · C b . I Top of New Pond . . . . . . . New Drainage Divide c::::> New Drainage ffi Drums II NOT USED [ff] NOT USED I!!I NOT USED ~ NOT USED o Valve Construction in variance with this Appendix, may require an amendment to the SPCC Plan, and another field inspection by the I Engineer. Contact HODGENS ENGINEERING I SERVICE to discuss alternate modifications. LOADING DDCIC VARaf:IJSE ~80'-' NOT TO SCALE Required improvements consist of the following: 1. Replumb all piping above ground with supports as defined in Plan, where feasible. New buried steel piping shall be double walled or annually tested, provided with corrosion protection and a protective coating. All aboveground transfer piping (new & old) shall be located within secondary containment. 2. Install site fencing, gate and lock around tanks, or arrange patrols. Owner to determine fence configuration. 3. Modify drainage to direct runoff from piping and transfer areas to new LINED hOlding pond. Entire area requires liner. Direct all drainage from non-transfer areas away from the new ponding area. Regrade in immediate vicinity of tanks to drain to swales between tanks that drain to new pond. Slope swales at min. SOlo slope to lined ponding area. 4. Construct secondary containment improvements per the Details and Specifications in this Appendix. Existing on-site soil may be suitable. 5" Provide lined tank and transfer area secondary containment pond with side slopes of 2:1. (See details in this Appendix. Depth: 3.0 feet Ponding area top dimensions: 18' x 72' Swales at minimum 5% slope between tanks shall free drain to top of pono 6. Remove Tanks 1 and 7, and cap/remove their plumbing. If left on site, label with sign indicating date of removal from service. .7. Provide permanent monuments to confirm continued adequacy of pond depth (e.g. post) 8. Provide traffic barriers, as desired, to protect pipes and ponding area from traffic. 9. Vehicles at loading rack must be located within the high point of drainage during transfers. Placement of a sign to indicate where the tractor stops is recommended. / 10. Slope ponding area to low point for pumping sump. If desired, provide gradual steps into pond to proVide access to pump out water. 11. Do not stockpile snow in ponding or secondary containment areas. 12. Locate all buried utilities and contact Diggers Hotline of Nebraska (800-331-5666) before digging. I 30 --Vi ~- ". ~ y~ e Hodgens Engineering Service HES Proiect No 4Sflfl:<" "Treating others the way we like to be treated>> r:-:- ~ ~':~'-~"""="""""_"~';~'~"::;"'l':'_",_,;..+,."j"';'''''~'',,"'"'""-="~~"""""":;"';'-"__-""C'''''"_'_''__''<'-'~=_'-'',.,~~~",_""",.'""",J"~.~,~,~,~<:,:",~"".,_",--,""""'~,~"""'_i"'_'~.'~,,,~,~~,~,,~-,-,~~ BUILDING INSPECTION REPORT /' )Zl CITY OF BLAIR 0 WASHINGTON COUNTY , 0 OTHER /)'/7/ I, J""--,, J} /_ --: / LOCATION OF INSPECTION' /UC.) /'0'/1" ///;'j;/(f;;;I//:Y<../ < ~A ""#) / ) ,'~ ' ....7:- / )r-..- ~----; !~. ,.J-r;,-:::' NAME OF OWNER' "':/j/LtUJlt/ J~l/(/k::\.J~'-;'l;AI15 CONTRACTOR' I I / DATE INSPECTION REQUESTED' / ~/~1 ~/4J::/ TIME JNSPECTION REQUESTED' /17---- PERMIT NO' /~ ;:J!jt;? .:~ TYPE OF INSPECTION REQUESTED: ~ ")-...""""". ~~_.-:t'~-~- BUILDING: O. FOOTING 0 DECK FOOTING '0 FRAMING I / /11") \I ... ,.. (~'f,./ (' ( ) COMMENTS: o CONFERENCE - --- o DRYWALL 0' FINAL 0 PARTIAL /,//..~ -7- ,,-,,<) 6/ /'/9 / ' /' .AQ - o STATUS CHECK ~~-..tre::= PASS.,I,D FAILED czjP '0 UTILITIES: 0 SEWER TAP 0 SEWER 0 SEPTIC 0 WATER TAP 0 REMOTE" 0 WATER SERVICE " o PARTIAL COMMENTS: ELECTRICAL: D ROUGH IN 0 FINAL 0 PERMANENT SERVICE 0 TEMPORARY SERVICE 0 PRECONNECT o PARTIAL PASSED FAILED o 0 COMMENTS: . PASSED FAILED o D ~~.!l!l!"" "~"""'~~-~~'1..""'ir;::tt;~ " MECHANICAL:O ROUGH-JN 0 AlC 0 FURNACE 0 RADIANTHEAT 0 FINAL 0 PARTIAL PASSED FAILED 0/ [] D GROUNDWORK 0 ROUGH-IN 0 FINAL 0 WATERMETERJNSTALLED 0 PARTIAL D PRESSURE TEST ,~C~~~~~.::j.' S-~&~. ,,~~', 0'o6cW~9r9RANTED tJ CONlJITIONAL OCCuPANCY GRANTED PASSED FAILED o 0 ~~""'~~~~~ Nc)'rEsiRE~f ' . "'1,,-'0 - . . ... ., ~--" ~ " ~ " . - - ( .. .- ".:t-". . -