BP12977 . ' It t AI J ~.. . It: , ,,:,~, V. ~I~ '\ " ,; ENf1 Blair Building Permit Detail Permit #: 12977 Issued: Completed: Location: 250 S Industrial Park Dr Owner: Terra Nitrogen Address: 250 S Industrial Park Dr 5/7/2008 2/27/2009 Type: Patios/Driveways/Excavation & Curb Grind Valuation: 100000 Blair, NE 68008 Phone: 402 426 4164 Permit Fee: 35 Issue Fee: Deposit Amt.: Receipt #: Section: Subdivision: Township: Range: Lot: Block: 2 Concrete pads to be bases for 2 coolers and 2 compressors Contractors Terra Nitrogen Fremont Electric, Inc. Remarks General Contractor Electrical Subcontractor Permit # E2901 Issued 6/9/2008 8/1/2008 OEM 2:00 p.m. pressure at #342 2:24 p.m. bleed line down to #330 3:19 p.m. bleed line down to #335 10/22/2008 OEM Failed not complete. Equipment on site yet. 2/5/2009 OEM Not Complete. 30 days per Herb. Changed completion date to 3-5-2009 Inspections Date By 5/20/2008 OEM Footings Pass 5/22/2008 OEM Footings Fail 5/23/2008 OEM Footings Pass 6/13/2008 OEM Electrical Rough-ins Pass 7/2/2008 OEM Electrical Permanent Service Pass 8/1/2008 OEM Status check Pass 8/1/2008 OEM Status check Fail 10/22/2008 OEM Final Inspection of Project Fail 2/5/2009 OEM Final Inspection of Project Fail 2/27/2009 OEM Electrical Final Pass 2/27/2009 OEM Final Inspection of Project Pass 1 3 ELECTRICAL PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street I(~ 'I ~V\@ ~ rellh blVt e It'd r~ ,-) 11\ c. . Cov i11 Blair? Nebraska 68008 Fax (402) 426-4195 (402) 426-4191 Permit Fee: $ ,; II'\ J l.eS f( i~ I fa ,,/C f) t' -tB-I;;' /Ji13 pe / "?],&lAcL Lf\(f H~' llJ RJ F~ (,poiS- Ph~)7-WJ) o NEW COMMERCIAL 0 REMODELING/ADDITIONS 0 UPGRADE SERVICE Ct n J I). (:~ f 0 'h Completion Date ., - I A 0 ll' ELECTRICAL PERMIT FEES w I('l~ b"7-(j? Jr'O Application Date: Job Address Service Fee = (Amp Fee + 2.00 per branch circuit) 1-100 Amp Fee... ................ ....$13.00 101-200 Amp Fee..................... ..$18.00 201-300 Amp Fee...... ............... ..$30.00 301-400 Amp Fee...... . ., ......... .... .$42.00 401-500 Amp Fee.................... ...$55.00 501-600 Amp Fee..................... ..$67.00 601-700 Amp Fee...... ,................$80.00 701-800 Amp Fee...... ,............. ...$92.00 801-900 Amp Fee..................... $1 05.00 901-1000 Amp...................... ..$117.00 IF OVER 1000 Amp 1 st 1000 Amp Fee............... ...$117.00 Each additional 100 Amps... ......$13.00 Notice I hereby certifY that I have read and examined this application and know the same to be true and correct. All provisions oflaws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume m<;give authority to violate 01' cancel1he provisions of any other state or local law regulating construction 01' toe' ! f1Cl ,., performance of construction. ' " I a r f...-.. E 2901 SS'I c>~ d. ~ Upgrade Existing Service... ... ... ... .$10.00 TemporalY Service....... ..... ........ $10.00 Fire Alarm System... ... ... ..... .......$10.00 Signs................................. .....$15.00 Miscellaneous Apparatus......... .....$11.00 AC/DC Circuit... .... ........... ... ......$5.00 Commercial/Multi Family and All Pfgrades: # of Circuits x $2.00 J Y - Amp Fee -5'"07 ~ Amp Fee + Circuit Total New Residential: (Finished Area) Single/Two Family Dwellings sq. ft. x .045 531 6"- '-' Modular/Manufactured Homes... ...$50.00 Receptacle/Switch Outlets Fixtures x $.75 Smoke Detectors x $3.00 Residential/Commercial Appliance # Fixed Outlets x $3.00 Motor(s) x $3.00 Power Apparatus (220 Volts) # Apparatus x $5.00 mit Issuance Fee............ ..... ...$20.00 a1)"'- t)-- 5S"'1$?. Total Comment: WHEN PROPERLY VALIDATED (IN THIS SPACE THIS IS YOUR PERMIT Approved BY:'rJ ).; BUILDING INSPECTION REPORT D CITY OF BLAIR D WASHINGTON COUNTY D OTHER ) S U S . It'\. dv) f ,f ~,cr 1 r-/' c~ (!PI 6 i-t 1- (JYl/l. TIME INSPECTION REQUESTED' 10./)( Or {;Jt<"ci 1"":, c. PERMIT NO' 1:} 5' 0 I LOCATION OF INSPECTION' NAME OF OWNER' ~'T-I}-1V\k..., CONTRACTOR' DATE INSPECTION REQUESTED' l)~- l} TYPE OF INSPECTION REQUESTED: 0 CONFERENCE __ .1 BUILDING: D FOOTING D DECK FOOTING D FRAMING 0 DRYWALL D FINAL D PARTIAL COMMENTS: UTILITIES: D SEWER TAP D SEWER D SEPTIC D WATER TAP D REMOTE 0 WATER SERVICE D PARTIAL COMMENTS: ~ ELECTRICAL: 0 ROUGH IN 0 FINAL D PERMANENT SERVICE 0 TEMPORARY SERVICE D PRECONNECT o PARTIAL f r"';?<'/ COMMENTS: (dui.t"'\ ,.I )?.7 MECHANICAL: 0 ROUGH-IN RADIANT HEAT D FINAL 0 PARTIAL COMMENTS: PLUMBING: D GROUNDWORK 0 ROUGH-IN D FINAL D WATERMETERINSTALLED 0 PARTIAL D PRESSURE TEST COMMENTS: o OCCUPANCY GRANTED 0 CONDITIONAL OCCUPANCY GRANTED NOTESIREMARKS' D STATUS CHECK PASSED FAILED o D PASSED FAILED o D FAILED D PASSED FAILED o 0 DATE OF INSPECTION MADE: FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY TIMR'd-3 L I'~\~ .. .~r""~-..1, ~-- - BUILDING INSPECTION REPORT ~~ITY OF BLAIR D WASHINGTON COUNTY D OTHER \9 ~~. ! " '/17) / )\ c.j, j ./i'1 a:IL.tI .J o,/U "J f/ /' >(;.7/1 L... \LY1 ' ~ ",1/1 _' -1.. (I '"~ /{./ 4'/;' CONTRACTOR' / ""uYdiOn 7' ,?" [,;lei <./(/'~ TIME INSPECTION REQUESTED' '70, I'! . '--~E-RMIT NO' C C2 9' (J J LOCATION OF INSPECTION; c5Z ")(:J '-../1 ,,I NAME OF OWNER' ;{a/i/l a Iv/ 'Ie/! tJc.:;U,/!'1 /' DATE INSPECTION REQUESTED' \'} -- 0'/- () 13) TYPE OF INSPECTION REQUESTED: D CONFERENCE lOl!~~.w. ...........T:i.:=!&~~~~~, ""~~"" _..:.. BUILDING: D FOOTING D DECK FOOTING D FRAMING D DRYWALL D FINAL D PARTIAL D STATUS CHECK '" -' COMMENTS: UTILITIES: D SEWER TAP D SEWER D SEPTIC D WATER TAP D REMOTE D WATER SERVICE D PARTIAL PASSED FAILED D D FAILED D ELECTRICAL: D ROUGH IN D D PARTIAL SERVICE D TEMPORARY SERVICE D PRECONNECT FAILED D COMMENTS: MECHANICAL:D ROUGH-IN D AlC D FURNACE D RADIANTHEAT D FINAL D PARTIAL PASSED FAILED D D COMMENTS: PLUMBING: D GROUNDWORK D ROUGH-IN D FINAL D WATERMETERINSTAtLED D PARTIAL D PRESSURE TEST PASSED FAILED 0" D COMMENTS: D OCCuPANCY GRANTED D CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS' ~ u . . . . . . . . . . . . . . . . . . . I . ....- L. . . . . . . . . . . L . - ,,>.D1' - "'''' ~ ==- ~ .- """~ , 1. =----::. ~ -~ -- - I . Iil'" - . - -- ~ , I \ ,.. /" BUILDING INSPECTION REPORT ,/ ~<6TY OF BLAIR D WASHINGTON COUNTY LOCATION OF INSPECTION' ",--...,;;''! . /, NAME OF OWNER' ,/~~l/J ?-(,. Il!; l~,'7 C:;JCi-&:l? c.'J .." r DATE INSPECTION REQUESTED' (/ -- I ~,.. () /':J /) .1::--/) rj/ W (.. D OTHER II ~_'_ ,1/" 1;/) J. -L... -1'; c-VJ"'!h""Al Cu \ (7 , --/ A'.1 ..c1'-' "..-v. ,1- '/ ~ ':oc r..):./l'tl (;'/1/ "-:;.~) l, ./ {~.fJ/t ~ " =h~. CONTRACTOR' ('.:!ll~:~,.l1jCt TIME INSPECTION REQUESTED' /"t> " .//-/ PERMIT NO' {;;'Z cro I "- TYPE OF INSPECTION REQUESTED: D CONFERENCE -~~"1\TUS CHECK ~'==~~A:tt~;s;..~-===~=====~_>-<"","",_",",_''''~~~~~~~~ BUILDING: D FOOTING D DECK FOOTING D FRAMING D DRYWALL D FINAL D PARTIAL PA$SED FAILED D D COMMENTS: C"'r~~o;r...u","~~,,=,"~~~~A;1'~~~ UTILITIES: D SEWER TAP D SEWER D SEPTIC D WATI!R TAP D REMOTE D WATER SERVICE D PARTIAL PASSED FAILED D 0 COMMENTS: ELECTRICAL: D ROUGH IN D FINAL D PERMANENT SERVICE D TEMPORARY SERVICE D PRECONNECT COMMENTS: D PARTIAL ':-i{r){) () ~\D(/t!. 1/?~7 (!A;l(!.tt~j MECHANICAL:D ROUGH-IN D NC D FURNACE D RADIANTHEAT D FINAL D PARTIAL PASSED FAILED D D COMMENTS: PLUMBING: D GROUNDWORK D ROUGH-IN D PINAL D WATERMETERINSTALLED D PARTIAL D PRESSURE TEST PASSED FAILED DD ::J OCCUPANCY GRANTED D GRANTED COMMENTS: NOTES/REMARKS' CITY OF BLAIR - MISCELLANEOUS BUilDING PERMIT ;--0//7 Permit# /011 / Date: 5~1-08 Approximate Completion Date: 5'''3/-08 Site Plan Attached: ~ Estimated Valuation of Project: lOt) 0 r () c.> 0 . Application for: Permit Fee $2Ojlssuance Fee $20 Fee: $40.00 Sign Erecting, Awnings (Per Sign) Roofing/Siding/Soffit and/or Eave Repair/Gutters Window/Door Replacement (Size Change Only) Egress Window (floor plan drawing required) Swimming Pools with Fence (plot plan required) Fences (plot plan required) Decks/Handicap Ramps (plot plan required) Satellite Dishes/Radio Antenna/Cell Towers (plot plan required) Gazebos (plot plan required) Miscellaneous Building Permits (items not covered by one of the above) Other Patios/Driveway Permits/Utility Excavation and Curb Grinding Fee $35 Curb Grind Length Utility Excavation Length Un. Ft.; Width Type: Water ; Sewer ; Other .~ -9 Un. Ft Amount of Bond Posted: Bond Check # (Curb grind - $9.00 per Un. Ft.; Utility Excavation - $6.00 per Sq. Ft.) PERMIT RENEWAL FEE: This fee is based on the amount of the original permit fee and is charged when work is not completed within two years and the permit expires. Renewals will onlv be allowed with the stipulation that all exterior site work and outside finish work is completed and interior Iife- safety issues have been properly address. Permit renewals are for one (1) year, with a maximum of two (2) renewals for a maximum permit span of four (4) years. Original permit fee of $0-$50,000 $100.00 $ Original permit fee of $50,000 - $100,000 $150.00 $ Original permit fee of $100,000 - $500,000 $250.00 $ Original permit fee of $500,000 or more $400.00 $ Issuance Fee: Total Renewal Remit Fee = Permit Fee/Issuance Fee Additional Description f project if ~ece~ary: c:? {lcrYlWh / c~ y n eX! Co c>-&J ,cl/f/l l d 1 c;J PROJECT INFORMATION: Job Address: I c:l5 () J/J1 ciLM ;I:V d /bA,t ~. 131 . 002fc9k'" l....' .J Legal Description (if applicable) ("to' B 4- '7 -18 .- / ';;; I;; 8 Pet 1 l.f Owner: Y r...a41 a Ah fA (} ~ Address: cl.5t' J:/n c:/t01A/ df Phone#: Contractor: Y JM t1 tf!dd<Z:f.l1:J. J /;I..t1/J ;(.u cA..m i>hoii'e #: 1 e. (pI/- A~ tf.P1P - '1/ tR tI Address: Cell #: Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within two (2) years of date of issue. -.s-~ /,- oef J Date For Office Use Only WHEN PROPERLY VALIDATED (BELOW) THIS IS YOUR PERMIT Date Permit Paid: S 9-013 Receipt# ~;JI/t) 7Approved bYi..1( 1?c.4,f~ b1 ~dC0 o r o (/) m o o ~ ro5 S;:-l -0 too zo mfTI ro:;o ~"T1 (/)0 ~.~ o ~ '0 z o m (/) G5 z ;:0 m ~ ;:0 ~~ ~O NC "-I ~(3 ~ ~;:o cIg mo alO ~5 ;:0 !:'l m j! o ~ ~ ~ nr~ ~ . .. ~8 m~ ~g ~ ~ I.!.I ~ f ~ ~ ~ .<::S " ~ ~ ~ ~ ~ ~ ~ ~ U'\ X "- )< -.J:: ~ 0 ..... .... I - L ~ "2 ~ ~ I ~ 11'-10" 13'-6" 10'....R11 I I ~ t !~ ---~ . ---- I I ! ! i ! i ! i t I ! I ",_ _ ;-~ __ -=_-=---f-~=- _-_-:-_ -=- -~== - ~ ....,..........-f9C 001 .. '0''' '"\.. ~ ... ,. '" """'^"" , ........,.., llIVlI 'UJIJIll3A lIN\I QJ)t)JH:) aUlJ 38 Q'lf'O-tS ow 31 YWlxmIdcN 3lN SNOIl,,:xn unUJ1 "." '31D< ^H~H ao,U'l+~ OO.t"TStit .J~ .lDMYJJIX)~ftte "'\ U!r < ~ - <::. <:;::, '--. I I \ \ \ " '\ \ ~ ..~ ,,, ~ \ \ ...... - JHMG'fVl>> ~ ~ I i ! .. rre r<<>- ] ......... . QI).U'l/II OO,a'6.... ;;;-c (,)/'7 x} J .......c V. 0 '", G . J ~l .- ~i - 1:11 NDI1VMDdMDJ N3~DM1IN VMM31 MDJ ~ ~ ! , I I -.-J _ _....._ _ -----0--- rra -0-- .....;.."..~ ~--<>- DoNLDI ~ 00 DNUllI D1hoHXI c:o >>NUX ~ QO mom v'; ~'. .~.:~ .....-- I I I I I JfC'lUW .ITfj UDI'lI -rn- K1Jo&ol W'JCOf'I oc ~ -'llli- M1~UlW'l( -l- ft9 "MI"U'I'M awr;w 0lIIf'Il -.- ~ lPOlDUl . J"'OtfII'M: lWW'I . :a.\.'W^ lWY'" . nu....... t nuUCln enu JeW ,Un.ow ~lDf--=~ X lQINlINXt IJ oea:l >> >>U MJ JLnI Dlf"[I/'\ ., ~ 0I.'I:U1 naoI .G lIJ.LylJlJ w KI one 'M ~ I:IKl .... lMUyATQ 1lIlJl ~: J.33.j Ol: . H:lNI )t(] '3'l'tJS trlr3 9 3 1 _J ClOt .. .... . f -" i\J l' r ./>. l/l 0- "0 en CD 0 3" 9" 1'-6" :;t> ~ ~ I l' 3" N ....J.. 4 roO N 4 r....... = . ' , . :;t>() ~ /). b. -() /). ;00 Q) .!:- en ~ . /). ~ ZO ::r /). CD mr a. 4: ./). rom G) 4 ' ~;o OJ . . /). .~ () " 0 en" < /). 0 ~~ CD CD ~ ., l' , , () 0 4 ::r ~ Q) ::J 0 ::J CD Z 4 Z :~ 0 /). ~ . .4 -.. ....J.. Z i\5 0 /). .......,. ::J ., "T1 CD ., ~ 0- 0 LJ 0 Q) en 0 ., ....... 0 en "'0 c en en -. (") () CD "'0 0 0: ::J 0- (") CD CD - "T1 CD -----------. -----.""":::.~~?" :- -;.; ~:':;"" :~'" ; -{- .l x--i'=K_"_A_.._r-= ;;;- i .. t .. j.. , ~~ \ .L -T- ~ ~\ " / I"~ q tf ~ J L ~ :1: il: \ . ~ E@ . ~.~ ~7_; :~.,~ ~ ,- ~"" '" \ ..~- ~ ~~~ , - I-~"-"'. '/~ ,-=~.;. ~ ~"'N~ ----- ~'-': :z_ ~ - - - - ~~-,~-,-,- -'~'- ._,-.-~-.-~--I-'-' . -'-"-'-'-"- -" ., ~? 3:: ~~e ~a~ I-=: i.!i 0 g~~ . ~;~ ~~~ ~tl~ z "'~ >- :: - ~ -". ;:... ....z :::>w g~ ~1:: .ll . ....Iz e ~ o~ ~ ;j ....~ft; 'ii ;:::: CD im ~ ~ ~ ! g '" ';~ ~, -.:"..:..\ ~.J. BUILDING INSPECTION REPORT .... ~CITY OF BLAIR 0 WASHINGTON COUNTY 0 OTHER LOCATION OF INSPECTION' c250 I:/-naMlc/v~J ~,tl: j,~ ' NAME OF OWNER~76vl t:(/ /\./..../ >fA (;'cUr-./ CONTRACTOR' c......yc;'/./11ftJ L,-' \ C. (/ 3 ' ".., J1 DATE INSPECTION REQUESTED' ,~_) ~;;Z () -'O.c::? TIME INSPECTION REQUESTED' < .:J U PERMIT NO' I dl a '7 /7 F 0 / I TYPE OF INSPECTION REQUESTED: D CONFERENCE .!:..-.4 .iL"to! _.h.- BUILDING: ~b",,-5,FOOTING D DECK FOOTING D FRAMING 0 DRYWALL D FINAL D PARTIAL D STATUS CHECK - COMMENTS: v """"" "'...." ~- "iD F~lED ( PASSED FAILED D D UTILITIES: D SEWER TAP 0 SEWER D SEPTIC D WATER TAP D REMOTE D WATER SERVICE D PARTIAL COMMENTS: ELECTRICAL: D ROUGH IN D FINAL 0 PERMANENT SERVICE D TEMPORARY SERVICE D PRECONNECT D PARTIAL PASSED FAILED D D COMMENTS: MECHANICAL:D ROUGH-IN D AlC 0 FURNACE D RADIANTHEAT D FINAL D PARTIAL PASSED FAILED D D COMMENTS: PLUMBING: D GROUNDWORK D ROUGH-IN D FINAL D WATERMETERINSTALLED D PARTIAL D PRESSURE TEST PASSED FAILED D D COMMENTS: D OCCUPANCY GRANTED D CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS' INS DATE OF INSPECTION MADE: FAXED OPPD\BURTREA TOCONNECTSER~CE: ON BY ~ " -"""t.'L ~!"l.!, , ' .... , ~ ./ / / , , ..... - r r. - ~-- - ~8-t~ . ---... -.-;- -"- -.-. '. ---II .,. ~ . 'II J -'\ ..1..1...,_ '. ,._Il~ ,'l~_"" ,~,-I'~'I..'~ .. -.......-....-.~- " ~ ____I..... I D- . ~ I .. ': ./ ./ y - , - - ~ / - . . - - ~ . ~ , , . , l - - . .. 15__ "".-..., I -=, '" . 'I .-- > I .,{,. ~ ,v::.~. ~ \:'! -.' - ----- ...,. ~ "7' ~, ,,,. = - ,- . ,~'i:I 1'}1Ff 'rJ31 i . ~ --' . ~ ..- :!II' # ~ .<II - < - . r "'~, /- ./ ,.~ .. .~ ..; .. , _.' ,~, -,;...... .......-r- --- , ~ , " f/I I . . ....~: .. - 1"', ;,\",: . , , ,~~ ,.'~. ~ ~:- ~.... " , ,..:- ' - -- , ~'~ . -"-11 If' ./ -= - , - 1- - - - , , - "~ --~ , , , - ,..;-' , BUILDING INSPECTION REPORT ~Y OF BLAIR LOCATION OF INSPECTION' NAME OF OWNER' ~ti tZ At fA tlc?..br.....J 1/ DATE INSPECTION REQUESTED'-~ ;?;;; - t) fj' o WASHINGTON COUNTY D OTHER c250 J/11(dad/~/d ;Lb-1L l.'}-t. CONTRACTOR' ~ &t1i;J II ~a?7 TIME INSPECTION REQUESTED' I" 00 II . /11. PERMIT NO' / e,?( 7 I TYPE OF INSPECTION REQUESTED: D CONFERENCE T__~" BUILDING:~:.fOOTING D DECK FOOTING D FRAMING D DRYWALL D FINAL D PARTIAL D STATUS CHECK .<:1.:1 P~EP )it PASSED FAILED o D COMMENTS: UTILITIES: 0 SEWER TAP D SEWER D SEPTIC D WATER TAP D REMOTE D WATER SERVICE o PARTIAL COMMENTS: ELECTRICAL: 0 ROUGH IN D FINAL 0 PERMANENT SERVICE D TEMPORARY SERVICE D PRECONNECT o PARTIAL PASSED FAILED D D COMMENTS: MECHANICAL:D ROUGH-IN 0 AlC D FURNACE D RADIANTHEAT 0 FINAL D PARTIAL PASSED FAILED o D COMMENTS: VlIi'''''"'''''''''''''''''' x~""" PLUMBING: D GROUNDWORK D ROUGH-IN D FINAL D WATERMETERINSTALLED D PARTIAL D PRESSURE TEST PASSED FAILED .-:,-' 0 D COMMENTS: NOTES/REMARKS' ",1' o OCCUPANCY GRANTED D FAXED OPPD\BURT REA TO CONNECT SERVICE: ON DATE OF INSPECTION MADE: r--~~~-;---,-,-.------,-.~.~~-c~_~__~---,. ~""""'.~~,....._~~_~~,.~,~.~ ~~ ~ ~....,---.--.. ~.~."".--,-.~~~ BUILDING INSPECTION REPORT D CITY OF BLAIR LOCATION OF INSPECTION' ...--~O\..~~ II / ' NAMEOFOWNER.L V ~ C:.". CONTRACTOR' DATE INSPECTION REQUESTED.C::-:';I 'L<~) I Cis TIME INSPECTION REQUESTED' D WASHINGTON COUNTY r; t:,-to ('/) 0/0 [] OTHER " '1v'1 ct tJSJ-r1aJL. f2-.Q,l, 10 {)/jIV\ PERMIT NO' i ;-'J/} / 1 TYPEOFINSP~CTI9NREQUESTED: D CONFERENCE D STATUS CHECK =.~=;~ F~ UTILITIES: D SEWER TAP D SEWER D SEPTIC D WATER TAP D REMOTE D WATER SERVICE PASSED FAILED D PARTIAL D D COMMENTS: ELECTRICAL: D ROUGH IN FINAL D PERMANENT SERVICE D TEMPORARY SERVICE D PRECONNECT D PARTIAL PASSED FAILED D D COMMENTS: ~~=~~~~~=~~'='Z::.lZ:lI'm:sm:I"~?Zll'l!.:!l;~Zrn:l:;:::'::l:ZJt:%z:zS!;.:::t!;~~~..,.,~ MECHANICAL:D ROUGH-IN D AlC D FURNACE D RADlANTHEAT D FINAL D PARTIAL COMMENTS: ~~~~~~""=~~~~Z!"".r~..........~ """""''''''''''"''--==-~..=...-~....:a~ PASSED FAILED D D PLUMBING: D GROUNDWORK D ROUGH-IN D FINAL D WATER METER INSTALLED D PARTIAL D PRESSURE TEST PASSED FAILED D D COMMENTS: D OCCUPANCY GRANTED D CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS' )0 ;i!)9 . ./ ~- -;. ../ 5--, ~ -y 7 ~W!l paA!~3a~ ~-\\ ~~ ~\ ~ ~ '~ :, / \...) L~ 01 ~ K(ln~ 'ON ~W~(~As qNIOlln~ l~~riM:C Wlf17!;: II Qilfl7 'f' , , Po C. :::J ,,"'.. : 1 b..._..,.._..._".. SENTINEL BUILDING SYSTEMS P. O. BOX 345 ALBION, NE 68620 (800) 327-0790 ERECTION DRAWINGS FOR ZIMMERMAN SALES & SERVICE P.O. BOX 98 NEOLA, IA 51559 PROJECT: TERRA NITROGEN CORPORATION 250 INDUSTRIAL PARK DRIVE BLAIR, NE 68008 I B24301 I BUILDING DATA: Width (ft) Peak Offset (ft) Length (ft) Eave Height (ft) Roof Slope (rise/12) Dead Load (psf) Live Load (psf) Live Load Reduction Collateral Load (psf) Roof Snow Load (psf) Wind Load Wind Code Closure Exposure Importance - Wind Importance - Seismic Seismic Coefficient Seismic Zone/Design I I I - I I - - - Designer = KF Detailer = -------------------- DATE: 6/12/08 25 12.5 40 17 2:12 2.200 20.00 No 1 21 90 mph IBC 06 Closed B 1. 00 1. 00 0.176 Category = (Ss*Fa) A J c~ t~~~ 1 qr]r1 TERRA NITROGEN CO. 25oINJ~s'R,~L3~~RKNEBRASKA 51 ATE FIRE MARSI-lFAURE.D BLAIR, NE. 68008 .. . Plan Submittal Application ~ Main OffICe 0 District 'C' 246 SouU114Uh Street 200 South Silber LIncoln, NE 68508-1804 North Platte NE 69101-4200 OFC (402) 4i1.2027 OFC (308) 535.8181 FAX (402) 471-3118 FAX (30B) 535-8259 '" " -. Date hH.p: "'/1 ~..r~',' SfJl1:~B ;lO.'~' 1 Plans Submitted To: <J..5T Il. (tJ L.. 0 YES ESTIMATED START DATE ESTIMATED COMPLETION DATE TYPE OF PLAN 0 Flnat 0 PrelimInary 0 Nebraska Accesslbfllty GUldetfnes {TItle 156) Review o Ffre Alann 0 Sprinkler 0 Other NOTE: Fire Alarm and Sprinkler Shop Drawings are to be Submitted as a Separate Review by the Subcontractor PROJECT DESCRIPTIOI'( [53' New~~I~-e '~r 0 Adartion 0 Alteration o Remodel 0 Interior Finish 0 Other _ . TOTAL AREA PER LEVEL- NEWI EXISTING ~ I 3 1 J 4 2 I ~ Range Hood System Other o Heat Detection 0 other $ 25,001.00 - $ 50,000.00 PLANS SUBMITTED TO LOCAL AUTHORITY FOR REVIEW (Specify City or Coullty) 8' J <<30 oc; 0 NO Dq YES '1. STIMATE ST BE INCLUDED FOR PLANS TO BE REVIEWED. ESTIMATE INCLUDES TOTAL VALUE OF ALL CONSTRUCTION WORK AS WELL AS ALL FINISH WORK, PAINTING, ROOFING, ELECTRICAL, PLUMBING, HVAC, ELEVATORS, FIRE EXTINGUISHING SYSTEMS AND ANY OTHER PERMANENT EQUIPMENT. 2. FEE SCHEDULE; THE FEE FOR REVIEWING PLANS, BLUEPRINTS, AND SHOP DRAWlNGS TO DETERMINE COMPLIANCE WITH RULES AND REGULATIONS ADOPTED PURSUANT TO SECTION 81-502 SHALL BE ASSESSED TO THE FOLLOWING SCHEDULE: TOTAL VALUE OF PROPOSED FEE SCHEDULE-HANDICAP STRUCTURE OR FEE SCHEDULE - STATE FIRE CODE REVIEW ACCESSIBILITY REVIEW; NEBRASKA IMPROVEMENT ACCESSIBILITY GUIDELINES $ 1.00 - $ 5,000.00 $ 5.00 minimum $ 5,001.00 - $ 25,000,00 $5,00 for the first $5,000.00 plus 2.00 for each additional $5,000.00 or fraction there of. $15.00 for the first $25,000.00 plus $2.00 for each additional $5,000.00 or fraction there of. S 25.00 for the lirst $50,000.00 plus$1.00 for each additional $5,000.00 Of fraction there of $ 35.00 for the fimt $1(lO,OOO.oo plus $1.00 for each additional $11),000.00 or fraction there of. $ 50.00 fer the first $200,000.00 plus $1.00 for each addftlonal $10,000.00 or fractlon there of. However,the totar fire code review fee shall not exceed $500.00 If "NO" to locaJ review above, add 50% to the fire code review fee, Total accessibility fee shall not exceed $250.00 $ 50,001.00 - $100,000.00 $100,001.00 - $ 200,000.00 $ 200,001.00 OR MORE If construction commences prior to the submittal of plans, a late fee of $50.00 shall be added. FIRE CODE REVIEW FEE ACCESSIBILITY CODE REVIEW FEE G'd 9L09-968-Wv 11840+1 l^J q80 808:80 80 80 A8l^J II I I - II - - I ~~ ;~~;'~;':'~-:';'2..~-:i<.;~:o.<."#: E".!~~:,..]~~ Ji-'~?::.E~;'''~1.jfJ.c~1 ~;'.:::~:;:;..~~~~~~~;~:~'~::~~~:'~;::~~if::?1~~~ft~~?~~::<;~~1~:;~~~t~~fr}1'i;r:~~e;\;?.;~;:f:."";-1"t;-;i~~.q~?}~!;';t::~~:1~~~?:~~:j~io'?;.::;'~~.~~~~;~~i:!t.;.~;.t~4~fE~:~Jft~~~~.r~!:4~~~:~;' lBOL T TIGHTENING PROCEDURES A825 BOLTS /'- , DIRECT TENSION INDICATOR TURN-OF-NUT METHOD BOLT SIZE W SPECIFIED INCHES INCHES MINIMUM FASTENER BOLT LENGTH BOLT LENGTH BOLT LENGTH TENSION KIPS .. <=4 Dia. 4 Dia.<=8 Dia. 8 Dia.<=12 Dia. 1,011O 1Jl!. 1/2 7/8 12 5/8 11/16 19 3/4 1 1/4 28 1/3 TURN 1/2 TURN 2/3 TURN 7/8 1 7/16 39 1 1 5/8 51 1 1/4 2 71 . JOINTS NOT SUBJECT TO TENSION LOADS JOINTS NOT SUBJECT TO TENSION LOADS need only be tightened to snug tight condition. This is defined as the tightness attained by a few impacts of an impact wrench or the full effort of a man using an ordinary spud wrench.. JOINTS SUBJECT TO TENSION LOADS Two tightening procedures are specified for A325 Bolts in joints subject to tension loads, Turn-of-the-Nut Method 0\' Direct Tension Indicator. Turn-of-the-Nut-Method - First bring bolts to a "snug tight" condition to ensure that the parts of the joints are brought into a good contact with each other. Next, place bolts in all remaining bolt holes and bring to "snug tight". Then additionally lighten all bolts by tIle table above - progressing from the bolts nearest the web, until the bolts have been tightened to applicable nut rotation. During this operation there shall be no rotation of the part not turned by the wrench. Consult the latest edition of the AISC Manual of Steel Construction for more complete instructions for installing high strength bolts. ~it~'-f-~.:;~~h~';::<;: ~:;:~i..."~'.:1:~: ;.'~ i~.;,,~'i:"i' f.:i~:. ~-':!r.l5.~.:~} ;\L ~ '~:::.:. ~ ~;--:~~:.:t~::'~~..~~.;:?:;;'-.~..m~i:;-.,:..':t.~t~:li:::'.l.~~::'J..~J~i~1~~'i~ ~::;'~if~~~~~;~:~:.t: ~'J::"2.-.t-~~~ ~:t;.q.{...."-:~;;;< ~1__: l~~~~~:::.:r~~<:;'~!-..-.:;=~i:~~:~:~:~~:\!J;:?--~}i'~?~~}:1."k:~~:~1!~l!i~"~,,;~~~~!~ ~"l;/'" mC> ;!:.;S::Z >""". ?'I 3: 0 XO-l tn-iO O~ ~:J:: .:J:: ..". (J)rnc~ -lCZ ~i;i::i tt1 Z>'>1 > '".nc () ~'tI1 ;;0 ::r: u>(')Z C tnor;; ~ @F:I: ...., m'>1m- '"00...,- (')::o=<2.:..~ ~~::P;:;o -; ..(:::. t..J ~o~ ~ (');:g;:; m ::J?'IX ~ o>~ ;::: Z::J." I ":10> =<2 ~.:z Z 52 u>-::::J:: g "1l~m Z In<>: 9 Qij5@ ::l~::o ~:;!h ::H5 ~ ~~~I ~Sj;s in ,,~ r.tg::i :-l-l:r:~f!! (')(/.l()I7lr::l 0~OP0 i=::ii5rnVJ ":1().....,,"l;/ ?:lP:z~~ ~ ~-:::~.-. v. ~~ <3 AL~1 :;:; > Z C>/C> tng;i~~ .2 gem~e .: O~;t:W&W z. "'~;s: ""-0 ""iVJ .,,0;' ~6::2 o:;:;t'"" ~~~ m<=<2 t1J=i>: N::Errl m::j;;O O::r:() "':1toC 2~d <:<t:l~ m~m [J).......x :"''-'-j >m r:Z: 1""0 m o ~ :;p. ~ N ...... Q:) ...... o t:IJ ~ (') I (..) 0) ()r";(')17l >-cm< "l;/tIJi">- ~a~fi ::i3:iijo -<17l0S:: ~'>10 _00 6~J!1 m ::0 Z~ 90 mlm m 3 > > > ...: D n r') .., ...:::: 1::0 ~ ~ ~ I~ * * *12 ~ o bow Cl Cl Cl~. "';:J ~ ~ ~ s:::s::s:: 000 '"J:1 "71 ..,.., AAA 000 ';!.~* m~~ ;!...- -< =< =< I""rl"" mml7l Z Z Z I7llm ttI ClOO ~I~ ~ 000 t""t'""t'"" >- >- -it"" r~ 00 ::0;:0 -<-< ()("J > > 't1 ~ fi("J ~~ I I I I I~ I ~ --() <~~ >"",.... ~m~ oqs 0\*6 n o v.. :;;7 (') S -l o 0 ....1'"" () '>1 ":10;:00 Z Z S olQ oZ' ~:j~ <Xl '",I 00 ~ ~,rn -/>. 0 A -010 I ...,~ . 0 . --r.."'r1"'T1 gg -;'""'"; (5 rn d :z: o j~J I ): g; ~I 0;4' ~ g ~ ~I ! I !:o jXl ~ II . 11 j (') e- o Cf) C1rr. 0"";:; o\...J l'o t:IJ__ ~:::o o c: ~ -:J !J1~ ~+- ~!,>;-" ~ W"";:::r" .",c;..;::;::~ "'J'U'll~:;O)>;;l'>> ~"""--ts~-ntrlt~A 000",,>-01'"" I J ""2/Tl~!ll~Vl;::C:C ZoZ --xCO'll" Q....~"'~iE"~~I'"" f11friP1~:j>~=1:>O (/) tI)--.O-l;uz-t:n ro~;::OZ"'-lCl~~ ~;::~ZoQo:r1la ~j!::MU;'"'l~~12;u fT)""" I'lZ::;;""{ri-P- O"v!iJ~!!!z!l'v>t.. '"'l'OI'l,,::!~p;u~~ 2/Tl:t~~!I' t:l'" . ~:rillVl"UO ~",;a ""^'~l'1-0 .go 5~!='Q~z Cl1!?,;:: Z!=' 000 ;::)'; p ~. -l illzn c n. J: ~ ~l/ln '"'l ~.g~ o z--z ;0 O;c/Tl 8?<g .0 z ~ ..-- l',,) ..-.. O':;:-~O ~ ~I --fID' "TJ- . I@ ~I 00- _ 0 S 21 I ~ - I I l',,) LH ~ )>N ^ fTI3: '-0 Ie -f I~ U1 '-... ~ .::.. II f I II 0'1 )~ OJ " N 'I I " l II I, ~ II I' U1 1 '-J U1 '-... OJ SI OLH ;0 )>3: 2-0 i--l ~I I ~'o .... I- ~ LH 1 .... .... to '-... q 0'1 N '-... OJ I'l Z o -..J U1 '" en 0'1 ....... l',,) '-' '-... l',,) fJ "TJ I 1) .. -f I ~ r "" < II "" '0 fTI ..., 'tl z Ii 0 z -f Cl en -I> 0 ~ r:-l Ql IT! V 6 (') ., \Jl /TI I 0 III " :u :r: ..... 0 <II -i 1-.!'!. -I I' tfJ I 8 I I! <.. f!~~ ! g l 0 L_.J '" ~s .. ~E 0 I Ill", I PI:!: '" Q'ij~ 5::2. zz ",0 II I 'I~. .1......:::. I . -+-' ~ o ~ w Q)Q)~ ~ ~ Q) ro ro ~ ~~ ~ -+-' ~~O...---l cdg:~Cd ~ I -+-'- ~ ~ W ,...--.; O. r-! ~ Q)z~O ~ ro -+-' Cd cd 0 ~ ~ ~ ~ 0 I---! . r-! W-!-' U Q)~ o ~ 0 0 ~ ~ '"""d w I 0 .r-! ~~~-!-' I--J-! W..---I ~ ..---I ro H Q) till ...---l O~~ro ro 0 Q) ~ ..---I W I I -- I -- - - - - - - - - - - ~ ~Q) Q) . ........; r:o:5 ~ ~ ro I P-c -!-' '"""d . ........; Q) U ~ W.r-! ,...--.; Q) ;:j~ ;:j -+-' ro 0 ::g Z .;:3 ~ .. W > " g: i: %: '" ~ l:::! ~ ~ ~ .; '" ~ <I: ~ '" .., m ==: ~ ~ ~ QJ LJ ~ ~ LJ ~ V) .~ Z ~ D '5 """<:q ~ c E ~ > .... t t:i w ~ ii1 '" ~ L. u '" n.. f3~ 0) c B ~ '" W I- -' ::> '" !if "- "- to '" W '" '" <t " ~$Q ~~~ f ; ~ Q) H C) C) IZl 0 0 '"'d ::: t::Ll ~o ~ cON .....-l ~ H Q) Q) ~ t::Ll 0.0 cO 0 ~ 0.. 0 Z .....-l 4-< 0 Q) 0 ~ ,.q ..0 -+-" ...... H H Q) ,.q po 0.0 0 ...... ,.q 0.0 Q) ~ ........ 0 H Q) -+-" -+-" Q) H IZl 0 4-< 4-< ,.q 0 E--i IZl Z 0 0.. N <r:: C\2 cO............... ~ .....:l ...--I <r:: ~. t::Ll t::Ll UJ. E--i t::Ll P-c <r:: P-c ~ <r:: E--i U I---i E--i UJ. <r:: ~ > W '" - ;::j o >> ......, ~u:i Q) >-., ......, Q) ro C S.gS8S ::::::0 r-IQ)Q) >-<ro>-<......,.......r-I>-., 0;s:4-<:xl c..>....... c..> 'Cd ::: Q) ~......, ~ S Q) 0 ~ >-., ~....... ..c: I Q)~ 0......, Q) ......, c.-:, ..c: 0 ..c:........ ......,......,-~.8 ......,0~........Q)Q) -Q)~015.g~ o -0 ::s m 0 ....... Q) Q) Q) m tl.O......, r-I ........ --cs.......~ -0......, . Q):xl......, 0 -O........Q) Q) ....... Q) c..> (]) ~........ c........ro om p ..........c: Q) ,.a Q) o.."""'..c: Q)' C 15:5 ~ Q)"""'''& >-., ......, ....... >-., tl.O Q) 0 ......, Q) ~ ........ Q.() ro ~..c:. ...... Q) ro .S Q) 2 ;S:::::::..c: S . >-., r-I m ro ......, """'Q)I--Iroo......, ..c:......,;.::::_......,~""Cj~ tl.O~ 1--1............... ....... Q)......................,....... 0""'" >-., Q) '-' Q) r-I c..>Q)~Q)~.......P-. o :>-. ~ ro..c: Q) 0 Q) """'..a ......,rn..c:......,Q) ......, ~ Q)......,~........~ Ci)moQ)rn Q)o ........:::::: ..c:>-., .c......, ro Q) m <=: Q) ro 8;s:~......, ""'ct5 p-'Q) o Q.()ro ~~ ~ Q)] .b ~ p-.~"""""""..c: S :.;::j......, ........8......, mQ)mQ)o>-., ......, :::::: Q) >-"..c: Q) rn rn ro..c:<=:......,--cs......,~;:j ;s: m ~ --cs >-.,' ....... Q)..a Q)........ p-. ......,~..c:c ;::j Q) Q) ............., p (]) 0 S :> Q)Q.() ;::j r-I01:O ..c:Q)..................c:.......c..>...c: ClJo:lOp...,......,m ..a ....... >-< STATE OF NEBRASKA - STATE FIRE MARSHAL 246 South 14th Street Lincoln, NE 68508-1804 ORDER FORM ORDER NUMBER.. .. . . .. . . .. .. . . .... 061601 DATE OF INSPECTION............. 6/13/08 O~ER................................. 'TE~NITROCJEN PHONE#/EMAIL... . .. . .. . .. . . . .. ..... 402 426 4164 ADDRESS.............................. BOX 365250 INDUSTRIAL PARK DRIVE CIT)TITO~........................... BLAIR COlJ1\rT)T................................ ~ASI1DD\rCJTON HO~ OCCUPIED..................... NH3 STORACJE TERMINAL . I I I DRAWING 2316U-9 Approved pending City Inspector approval and fmal inspection. DRA WINCJ S9814 Approved pending City Inspector approval and fmal inspection. TWO BUILDINCJ DRA WINCJS Approved pending City Inspector approval and fmal inspection. ONE PIPING LA)T OUT Approved pending City Inspector approval, request to know piping size from the discharge port valve. Please notify the City Inspector or my self when the piping and equipment and valves are ready for fmal inspection. Building and grounds will be the City Inspector once the equipment has been installed and operational and al the piping has been tested for leaks. Cc/cddf Cc/fc Blair Cc/BCI building inspection cc.jgdf If you have questions on this Order, contact the District B State Fire Marshal Office at 402.395.2164. Or mail at: State Fire Marshal Office, District B Office, 438 West Market, Albion, NE , 68620-1241 All items must be corrected to comply with the laws of the State of Nebraska and with rules and regulations adopted by the Nebraska State Fire Marshal as mandated by Sections 81-502 to 81-541.01 It is the duty of the owner or person in charge of the above-namedfacility or location to immediately take measures to bring the facility into compliance with state regulations. ~Jt~LL CC~PRECT!ONS SIL\LL BE lVL~DE "t\.ND UNDER CONSTRUCTION PENDING ALL ITEMS CORRECTED ON OR BEFORE: Please return to the Albion Fire Marshal, 438 West Market, Albion NE, 68620-1241. Has the above listed items been completed within the time limit allotted and agreed upon? YES__ NO If NO how much time will you need to complete. DAYS Please use back if explanation is needed. Any damage proximately caused by a failure to remedy the above listed deficiencies shall be deemed to be the sole responsibility of the owner or person in charge by virtue of this notification and order. Witness my electronically typed name at Stanton, Nebraska, this 16th day of June, 2008. ,,/ //': ' '-;1 ~ /~." By: _~...~~;~~__/~::..~,f7"""-A--_F-~- Phone Number: 402 439-2029 DEPUTy'STATE FIRE MARSHAL Deputy State Fire Marshal Sanford CJoshom #8734 EMAIL sandy.goshom@sfm.ne.gov State Fire Marshal E-Form 03-2007 Page 1 of 1 Corrections Order Ii.. ~~ Ii.. 0 r:ilr:il ~O-. C\2 0 ........... rJ)E-< - < rJ) Ii.. C\21Il 01Il ...... 0...... rJ)~ ~~ ~~ ...........::r: r:il0 ....:ltJ ~~ ....:l...... 0< ~::r: rJ)~ ~O Iii.. f-l r:ilE-< 10 ....:lE-< I Z d:x: Ir:il ~r:il ~Z ~ QZ E-<...... ....:l r:il~ ~ 1i..E-< E-<r:il ....:l0 <E-< ~ r:il0 oZ rJ)1i.. or:il U I~ ....:l0 p.... ~ ...... Ir:il Q 10-. ~ 0 I......... ~ lZl ~C\2 (]) E-< '-./ ...... ..... ..... 0 ~ H 0.. ~ ...... (]) ~ ~ cO U 0.. m (]) 0.. p.... -+-> o -C) Zs 1---1 I I~~ I r:r:: q ~:j 0'3 I 0 ~ ~8 Ii.. ~ rJ) ~ r:ilrJ) ~E-< Or:il rJ)r:il::r: tJ~tJ Z ::Jr:il ......li..oo :jOz< ......0~1i.. ~~ ~ Q tJ::J r_ Z Z rJ) .............0 rj~....:lli.. o rJ)8E-<0 ,....:l 0 ~ I 0-. Z rJ) ~ I::r:~~ ~O~E-< E-<<<Z r:ilE-<~ NE-<~Z '-./<~< ~E-<(f)~ rJ) ::J01i..r:il 00> ..1i..00 w _~ () o CD ~~ ~ ~ ~ Z :::l ~~ r:il::J ~O-. o (f)E-< < Ii.. 01Il 0...... ~~ ...........::r: :jtJ <I-< ~::r: ~o ~E-< ....:lE-< d:x: ~~ QZ 1i..E-< ....:lo r:ilo (f)1i.. I~ I~ 10-. I......... ~- E-< '-./ ~g: ~< ~r:il o (f)~ ~1Il 0...... ~~ ...........::r: ....:ltJ ....:l...... ~::r: ~o ~E-< ....:lE-< d:x: ~~ QZ 1i..E-< ....:l0 ~o rJ)1i.. I~ Ir:il 10-. I......... ~C\1 E-< '-./ '" w > [J B: :> Q. :>: .. '" :l1 ~ ;:; 1lI w "- I- N .. N '" "- "' '" ~ ~ ~ ~:>. ~ ~ ~S '" lJ to ~ Q; lJ ~ CI) . g> Z '8 o '5 .....'" CI) Z ..J ~ ..s ~ ~ > tlJ ~ ~ ~ ~ ~ ffi D- ~ ~ .~ u -'< ~ ~ ::> '" [J :>: ... ... [J '" w '" '" .. > W l< _ 1Il~ ......~ ~....:l < ::r:~ Cl(f) ......~ ::r:....:l >-<::J ~< r:il0 >0 r:ill-< Z~ 0< ~ (f) ~::r: r:ilE-< ~I-< u~ rJ) _ E-< ClZ z~ ......rJ) ....:l~ :::3~ ~O-. Q Ii.. J;t.. I-< ' .....:l (f) r:il0-.....:l (f)<r:il ....:lZ ~~o: E-<::r:z O-.E-<r:il :JtJr:il '7.~ Ron, There is going to be some mighty big motors in this location they are putting in a new 2500KVA transformer there will be two 350 HP electrical motors to run the pumps. I would like to have the area SEI inspector work with Dale on this one do to the amount of power in use, let me know thanks, This is not a location to have a melt down with a new service. Dale All the piping and location look good I requested a piping size and location of safeties that will come at a later date. All piping is to be welded and x raid I still want an in line pressure test at 1 time the working pressure and plus % with soap and inert gas ether air or nitrogen for 1 hour, at or above the pressure they are working with this is not a location where u want a leak, this would make for a bad hair day. I know the engineer that is doing the work he is out of Okolona and he know his stuff it's the welder and the valves that will have a failure, I also requested a second exit do to the danger of a leak and no way to get out if its blocked will u go a lone with that? You may need to check with the building contractor to insure we have al the exit we need. I would like to have the SEI take a look at the wiring and switches do to the amount of load as a back up so we don't miss any thing. Sanford Goshorn DSFM Dist B Albion, Ne 68620-1242 Office 402395-2164 Albion Home Office 402 439-2029 sandy, qoshorn@sfm,ne.qov _......" 0W-s~' ... .... II COLD FORMED STEEL CO~'p~~ENTS ENGINEERING DATA YIELD STRENGTH = 55.0 KSI TYP. DIMENSIONS MEMBER PROPERTIES SHAPE Job Number: B24301 DATE: II SECT. NAME A B C D GA. AREA Ix Iv Se BUILDING Job Name: TERRA NITROGEN CORPORATION 6/11/08 CODE: Job Location: BLAIR, NE 68008 DESIGNED BY: PCE08256 8 2.5 2.5 .77 16 .82 7.79 .67 1,58 -c--j I IBC 06 PCE08356 8 3.5 3.5 .77 16 .94 9.65 1.52 1.65 Builder: ZIMMERMAN SALES & SERVICE KF I ] D PCE08354 8 3,5 3.5 .80 14 1.12 11.41 1.81 2.09 t DESIGN LOADS PCE08352 8 3.5 3.5 .88 12 1.67 16.92 2.71 3.37 . PCE10356 10 3.5 3.5 .77 16 1.06 16.17 1.63 2.05 LIVE LOAD: 20.00 psf ROOF SNOW LOAD (Pf): 21 psf PCE10354 10 3.5 3.5 .80 14 1.26 19.14 1,94 2.73 A RIGID FRAME LIVE LOAD: 20 psf ROOF SNOW LOAD FACTORS PCE10352 10 3.5 3.5 .88 12 1.88 28.46 2.91 4.57 COLLATERAL LOAD: 1 psf GROUND SNOW LOAD: 25.00 psf . PCE12356 12 3.5 3.5 .77 16 1.18 24.81 1.72 2.47 ROOF DEAD LOAD: 2.200 psf I = 1.00 Ce = 1 Ct = 1.20 Cs= 1.00 Terrain Category: C 3.24 1-+ FRAME SELF WEIGHT: INCLUDED Slippery /Unobstructed Roof: Y PCE12354 12 3.5 3.5 .80 14 1.40 29.38 2.04 WIND LOAD: 90 mph Rain-on-Snow Surcharge = 0.00 psf PCE12352 12 3.5 3.5 .88 12 2.09 43.76 3.07 5.91 I-B-j t EXPOSURE: B , .77 16 1.24 26.91 2.39 2.47 WIND IMPORTANCE FACTOR: 1.00 BUILDING DESCRIPTION PCE12406 12 4.0 4.0 PCE12404 12 4.0 4.0 .80 14 1.47 31.87 2.84 3.27 INTERNAL PRESSURE COEFFICIENT: +/-0.18 PCE12402 12 4.0 4.0 .88 12 2.20 47.48 4.27 6.17 SEISMIC IMPORTANCE FACTOR: 1.00 SEISMIC DESIGN CATEGORY: A WIDTH: 25 feet .66 16 .70 4.04 1.12 1.02 SEISMIC COEFFICIENT: 0.176 (Ss*Fa) ASSUMED SITE CLASS: D LENGTH: 40 feet PZE06256 6 2.5 2.5 OCCUPANCY CATEGORY: \I Normal - EAVE HEIGHT: 17 feet PZE07256 7 2.5 2.5 .66 16 .76 5.78 1.12 1.26 Ss= 0.11 S,= 0.04 Sos = 0.12 S01 = 0.06 ROOF SLOPE: 2.0000: 12 PZE07254 7 2.5 2.5 .68 14 .91 6.83 1.33 1.51 SEISMIC RESISTING SYSTEM: Structural Steel System Not PZE07252 7 2.5 2.5 .74 12 1.36 10.13 2.04 2.58 Specifically Detailed for Seismic Resistance PZE07306 7 3.0 3.0 .66 16 .82 6.49 1.77 1.31 I-cjy D ENGINEER'S SEAL PZE07304 7 3.0 3.0 .68 14 .98 7.67 2.11 1.61 ANALYSIS PROCEDURE: Equivalent Lateral Force Procedure PZE07302 7 3.0 3.0 .74 12 1.46 11.38 3.22 2.68 "\ The index force analysis procedure is used for buildings located PZE08256 8 2.5 2.5 .66 16 .82 7.89 1.12 1.52 in seismic design category A [Eqn 11.7-1, ASCE7-05 (IBC06)], in which case Cs and R do not apply and are not used to PZE08254 8 2.5 2.5 .68 14 .98 9.34 1.33 1,81 calculate the base shear, V. PZE08252 8 2.5 2.5 .74 12 1.46 13.87 2.04 3.09 A BUILDING FRAMING PZE08306 8 3.0 3.0 .66 16 .88 8.82 1.77 1.53 PZE08304 8 3.0 3.0 .68 14 1.05 10.44 2.11 1.94 LEFT ENDWALL FRAME TYPE: Bearing Seismic Data ~ PZE08302 8 3.0 3.0 .74 12 1.57 15.51 3.22 3.21 Y RIGHT ENDWALL FRAME TYPE: Bearing Cs R V (k) PZE10256 10 2.5 2.5 .66 16 .94 13.38 1.12 1.87 INTERIOR FRAME TYPE: 1 rigid frame, clear span N7A N/A 0.0 PZE10254 10 2.5 2.5 .68 14 1.12 15.84 1.33 2.43 D<I--B- ROOF BRACING: Cable Diagonal Bracing N/ A N/A ~~~ 2.5 2.5 .74 12 1.67 23.60 2.04 4.22 LEFT ENDWALL BRACING: Cable Diagonal Bracing N/ A N/A 0.0 C PZE10252 10 RIGHT ENDWALL BRACING: Cable Diagonal Bracing N/ A N/A 0.0 c.o/\. ' PZE10304 10 3.0 3.0 .68 14 1.19 17.57 2.11 2.55 FRONT SIDEWALL BRACING: Minor Axis Bending N/A N/A 0.0 PZE10302 10 3.0 3.0 .74 12 1.78 26.17 3.22 4.36 SACK SIDEWALL BRACING: Minor Axis Bending N/A N/ A 0.0 PES06P04 6 4.0 4.0 .80 14 1.05 6.53 2.27 1.45 LEFT ENDWALL GIRT TYPE: Inset FRONT SIDEWALL GIRT TYPE: Inset PES07P04 7 4.0 4.0 .80 14 1.12 9.24 2.39 1.79 \--C RIGHT ENDWALL GIRT TYPE: Inset BACK SIDEWALL GIRT TYPE: Inset PES08P04 8 4.0 4.0 .80 14 1.19 12.51 2.50 2.14 ~D ROOF PANEL: 26 go. R-Loc Panel WALL PANEL: 26 ga. R-Loc Ponel PES10P04 10 4.0 4.0 .80 14 1.33 20.86 2.69 2.74 T ROOF PANEL COLOR: Galvalume WALL PANEL COLOR: Desert SEISMIC RESISTING SYSTEM ABBREVIATIONS: RQOF TRIM COLOR: Brown WALL TRIM COLOR: Brown OMF = Ordinary Steel Moment Frame COMMENTS OCBF = Ordinarv Steel Concentrically Braced Frame A CC Cantilevered Column System Definition of Loading Conditions on Anchor Bolt Reactions Page: = DL: DRAWING INDEX ~D Dead Load LL: Live Load CO: Collateral Load WP: Wind Pressure WS: Wind Suction LLR: Live Load Right WL: Wind from Left WR: Wind from Right PAGE(S) DESCRIPTION PAGErS) DESCRIPTION I- B ==rr Definition of other abbreviations on Anchor Bolt Reactions Page & Anchor Bolt Details: J - ;)..... COVER SHEET /7- ;).)- GENERAL DETAILS EV: Enolwo.ll REVISIONS 8-~ ANCHOR BOLT PLAN .J.-:3 .;LS- ACCESSORY DRAWINGS S'vI: Siolewo.ll Rigiol F ro.Me REV I DESCRIPTION 1 DATE I APPROVED .5 RIGID FRAME SECTION Door Jo.MIo I I I ~-? ENDWALL ELEVATIONS ------- Taking Pride In Building Excellence PACE No. 9-/0 SIDEWALL ELEVATIONS SENTINEl BUILDING SYSTEMS PROJEct 1B2430f /1 ROOF FRAMING PLAN A IhvtllOll orGlOBAL kusTRICS. UIC. TERRA NITROCEN CORPORA nON 237 SOU7'H 47'H S7' ADDITIONAL DETAILS ALBION, NE 68620 AODRESS 250 INf)[JSTRIAL PARK lJRIVE DES/CN: KI' / I,.? - I~ (800) 327-0790 BLAIR- NE 68008 REV: JOB SPECIFIC DETAILS DA TE: 6/11/08 't:i ~;;.~ '^t".<\~...." ~ ~."/",~. ..""t'......".. """".'~""'" 1'10~..."....... / ''''", ,~'"' ~l." ,/ 1 "'~~~"'"' ;;C/'jJ ~ , 1 I '"",."" ~.l". ~R \.I ft \ '1' ~im' '\ ~9 ~ I I rr-,~<::::"=-_1\-'~p-,--- -,. ~ i I 1t!1._' '-- ,," - ~-'-, ""''- I i~ On I. '~""'::;I'. r--'''- .., - _...l._" ", " I ~ - ~ ' ~-, -. , " " ' ,A" /A/I ;.,' \ /' "'---,', '. " \ /I,." . \ f i I ~ \ /' ..... ", '-. ~\ Pit {" t'/ /.....-~~.~lm?l....~~~' ' );t, \ / ,.''-.\, \,'\ " 11,' / {" ['I . V / I ' , " ", V / / I~l ',n :! ;;; \ I \ \ \ " } r / / I{ll I ",; r' I \ \ \ ">'~~_,L__J_...../" L~j""=-'l.rt~\\ \ ~~ 'Ii..! -'-f-,--.J><i .0 t~JI /~ fiJ : ,LJ~ C~ 1- o~ \ I 'i, I . I ',ll i " / ~ ,/ j -'il^ \ Mil '"....... ,./ I ' I . '" ,,/ r '~ """"'--c-"" i 1..\1 f'=-~~.,'~ , ' ~J 1'111l 1!, rl 0 \~.l' 11\ ~ , ." l [l l 11 '~i l~_~ it f-' d~~"_ _..,,1,'\, tl ~______ ,1_ T_ _.. ___, )':::..::::.::~~:=:::J 1\1~}~.."'.' , I' lie .. ;::""-- -\ 1 t];" , -"-" ..' -.1 If ! t II .--- __"J '" l I ' I +! m:;1 1f'P:~T~7'::-:r\,,~\F I \ J mFJ Jt l.,."\~';'?;;:'~.r ,fij~ f '.. ,/ II ____..L .......... ~t;1 ) 11 U .... ,11--. ,- .- ~,,- -j""'/ i f f ! / \ )~~ rf.;'-""") I.J ' .~ ". -". f \ ,',,,~ \'.'1' ~ \ A \ d i <('.' ::t c.'I l ;;"l AJ)1 ~ \:x,. l ), '\;$i H n ",r~' } I ~ ' ~l..>'4tt,~ \1 j ...\' ,=".";;""4' -c"'C~'h1f~':;-i i W,) ~ I I ~ T I ~~\~ I i'~ 1 o,~ -I 0 .l~ / i I~ f I f'u II ,...I \ '" l,f J'\;l I~~ ~ ~ ~ \ \ /.~ , ",;'if :~,',. \ Av /p<07 \ "'~' 1'+'" I -'1~~I'P I ./" r...... , ~ I I J m] 1["\ .lfi 1.j , [Ii! .J - ~...",,- \ .~,.-"\ \ ...... ..,," \. \ \ \ \ \ \ \ \ \ \ ~.\ \ \ "U \ \ rll?, \ \ \ \ \ \ I I \ i I I 1 I , I I , II II \~ ;111 ! 1\ ~. ;.; " \ \ ,:~ ",.// plfl' r'---. =,=~l;:l:::q,-,;'5-, ~n ;:1 ~~/~=_~J . ~"-_.;/-.._..-\ ,e?' .5;:.,:::tk.J:::J~~~l/ I ~;7 '~, I f ,~ I~ ~ 1\ ~ \\ \:, ~ ~ \\ \ ! \ j \ '<-\ j/ '"," /. '''0 ,,;,- "'~.....r- ...<::;;:/ '>.1::J:"..:c:::l--:::>-"- c-Jl -if- T 1l I I Rt< t~ ... J~ \---~ \ \ l ) ! / ~ ,. .a!~ ~ " tN :t> '\ r') ! (' (\ ~ ( -- 1..:.,. v '\) (: "'- ~ (. I/) 1\ "', - ~ ~ - .- If .. o I ! ! ! ~ 5J~'-\=::7"'~-::::-_-:_ ;::.-::-_-.~:-...~~~-- ~-~--~~----:-.~~- ~''-----------;--:-:;-,~''''^'::::--~~- . # '12 SELF DRILLING TK2125- 1 1/4" LONG PANEL TO FRAMING ONLY NO INSULATION TK2150- 1 1/2" LONG PANEL TO FRAMING ONLY UP TO 4" INSULATION TK2200- 2" LONG PANEL TO FRAMING ONLY 4" + INSULATION # 14 SELF DRILLING POP-RIVET LAPTEK- 7/8" LONG LAP/TRIM SCREW PANEL TO PANEL TRIM TO PANEL 1 /8"rtJ ALUMN SLEEVE WITH STL. MANDREL ALL TRIM SPLICES PLAINSMAN PREFORMED PEAK CAPS MASTIC SEALANT ROOF SEAMS 26 GAUGE ROOF PANEL OAM CLOSURES 26 GAUGE WALL PANELS OAM CLOSURES AKE TRIM '85 AND HeADER FVU.Y FLASHED I%~%I ORNER TRIM o ASE TRIM (OPlnONAL) NOTE: FOAM CLOSURES MAY DIFFER DUE TO INSULATION AND/OR OTHER BUILDING OPTIONS t2 Mr. Goshorn, Although I don't have the building drawings from the Sentinal Building Co. as of yet I wanted to get the information I do have to you so there won't be any mistakes made on our part. The total approved money for the project is $1,883,000.00. I have enclosed a check for $218.30 to cover the fees. The overall project includes addition of the following; Two 500 hp screw type ammonia compressors Two 825 ton closed circuit coolers One 2500 KV A transformer provided by OPPD One 25 x 40 x 17 all steel building for use to enclose the compressors. New wiring bored in and encased from Industrial drive to the transformer near the compressor building. Associated piping and wiring as needed for plumbing and electrical connection of the new equipment. This equipment will be used to handle the extra load coming in from the NuStar pipeline system across highway 30 :from here. If you recall we pressure tested the connection between NuStar and our terminal last June. Herbert Townsend will be here to begin installing our new equipment, piping, etc. on June 23rd 2008 and will stay through completion of the project. The boring of the new wire service will begin very soon. If there is anything I've omitted please let me know. I will get a copy of the building drawings to you as soon as I get them. Anything you can do to help us get this done according to standards will be greatly appreciated. We have a target date for completion of July 21 st but are trying to make it by July 15th. Thanks, Herb Riechmann ~ Cf-COLUMN LINE ~.~,---~..~-- ENDWALL COLUMN: MAXIMUM REACTIONS, ANCHOR BOLTS, & BASE PLATES - - - - - - - - - - - - - - - - -Column Reactions (k )------------------------------------ Frm Col Laad Hmax V Load Hmin V Anc. Bolt Base Plate (in) Grout Line Line Id H Vmax Id H Vmin No D(in) Wid Len Thk (in) --------- -- ----------- -- ----------- -------- ----------------- 1 A 8 0.6 -2.1 9 -0.5 -0.5 2 0.750 4.000 8.000 0.375 0.0 10 0.4 1.8 8 0.6 -2,1 1 B 11 1.2 -2.8 9 -1.1 -1.7 2 0.750 4.000 8.000 0.375 0.0 1 0.0 3,8 11 1.2 -2.8 1 C 11 0.6 -0.6 9 -0.6 -0.6 2 0.750 4.000 8.000 0.375 0.0 12 0.0 1.7 11 0.6 -0.6 3 C 8 0.6 -0.6 9 -0.6 -0,6 2 0.750 4.000 8.000 0.375 0.0 13 0.0 1.7 8 0.6 -0.6 3 B 8 1.2 -2.8 9 -1.1 -1.7 2 0.750 4.000 8.000 0.375 0.0 1 0.0 3,8 8 1.2 -2.8 3 A 11 0.6 -2.1 9 -0.5 -0.5 2 0,750 4.000 8.000 0.375 0.0 14 0.4 1.8 11 0.6 -2.1 FRAME LINES: 2 H - tv H - tv NOTES FOR REACTIONS RIGID FRAME: MAXIMUM REACTIONS, ANCHOR BOLTS. & BASE PLATES 1. All laading canditions are examined and anly maximum/minimum H or V and the corresponding H or V are reported. 2. Positive reactions are as shown in the sketch. Foundation loads are in opposite directions. 3. Bracing reactions are in the plane of the brace with the H pointing away from the braced bay. The vertical reaction is downward. 4. Building reactions are based on the following building data: Width (ft) = 25.0 Length (ft) = 40.0 Eave Height (ft) = 17.0/ 17.0 Roof Slope (rise/12) = 2.0/ 2.0 Dead Load (psf) = 2.2 Collateral Load (('sf ) = 1,0 Live Load (psf) = 20,0 Snow Load (psf) = 21.0 Wind Speed {mph ) = 90.0 Wind Code = IBC 06 Exposure = B Closed/Open = C Importance Wind = 1 ,00 Importance Seismic = 1.00 Seismic Zone = A Seismic Coeff (Fa*Ss) = 0.18 BRACING REACTIONS, PANEL SHEAR --------- --------Column Reactions (k )------------------------------------ Frm Col Load Hmax V Load Hmin V Anc. Bolt Base Plate (in) Grout Line Line Id H Vmax Id H Vmin No D(in) Wid Len Thk (in) 2 A 3 2.9 6.0 6 -3.3 -2.5 4 0.875 12.00 13.00 0.750 0.0 1 1.6 8,3 4 -2.5 -3.9 7 3.3 -2.5 2 -2,9 6.0 4 0.875 12.00 13,00 0.750 0.0 1 -1.6 8.3 5 2.5 -3.9 NOTES 2 C GENERAL 11. Foundation design and construction are not the responsibility of SENTINEL Buildings Systems. I 2. The building reaction data reports the loads which this building places on the foundation. 3. Anchor bolts shall be accurately set to a tolerance of + / - 1/8" in both elevation and location. 4. Column base plates are designed not to exceed a bearing pressure of 1 050 pounds per square inch. 5. All walk doors are to be field located with drilled in wedge anchors. 6. Total anchor bolt lE;mgth is embedment + projection. Bend length is not included in total length. 7. All bent anchor bolts to be ASTM A36 threaded round stock (rolled or cut thread) with plain finish, unless noted. 8. When anchor rods are located close to the free edge of the concrete, the tensile and/or shear strength of the anchor rods cannot be fully developed. l.n these cases, s~eel reinf?rcement in the concrete must be sized and developed (not by SentInel) for the reqUired tensile or shear forces in the anchor rods. 9. For buildings classified as closed (C!osed!Open = C), Sentinel Buil?i,:g Systems d?es not investigate the influence of the design WInd load on the metal buildIng system with doors and windows left open. The end customer must C?ssure that duri,:g times of high wind~ all ove~head doors, sliding doors, large doors (such as bl-fold & hydraulic), walk doors and WIndows Will be closed & latched. ---Wall-- Col Lac Line Line :I: Reactions (k ) --Wind----Seismic- Harz Vert Horz Vert Panel Shear (Ib/ft) 5. Loading conditions ore: 1 DL+CL+SL 2 DL+CL+0.75SL+0.75WL 1 3 DL+CL+0.75SL+0.75WR1 4 0.60DL+WL 1 5 0.60DL+WR1 6 0.60DL+WL2 7 0.60DL+WR2 8 0.60DL+WL2+WS 9 0.60DL+WP+LnWnd1 10 DL+CL+O. 75SL+0. 75WR2+0. 75WS 11 0.60DL+WR2+WS 12 DL+CL+E1 UNB_SL 1 13 DL+CL+E2UNB_SL 2 14 DL +CL +0, 75SL +0, 75WL2+0. 75WS L_EW 1 F _SW C R_EW 3 B_SW A A ,B 1 .1 1.5 0.0 Weak Axis Bending Used B ,A 1.1 1.5 0.0 Weak Axis Bending Used 0.0 0.0 RIGID FRAME REACTIONS: WEAK AXIS BENDING ---Wall-- Col Lac Line Line ---Reactions(k ,f-k )--- Load Horiz AB_ Vert Moment Id F _SW C F _SW C B_SW A B_SW A 2 2 2 2 1.2 0.0 1.2 0.0 23.3 0.6 23.3 0.6 19.4 0,5 19.4 0,5 Wind Seismic Wind Seismic ANCHOR BOLT SUMMARY ----- ---- ----- ----- ----- ----- Total Bend Qnt Lac Dia Len Len Proj (in) (in) (in) (in) ----- ---- ----- ----- ----- ----- !8l 8 DJ 3/4" 11.50 4.00 2.50 !8l 12 EW 3/4" 11.50 4.00 2.50 €j 8 RF 7/8" 13.00 5.00 2.50 REV I DESCRIPTION 00?~ I DATE I APPROVED REVISIONS ------- SENTINEL BUILDING SYSTEMS A D1VJSltJlI aGLDBAL Ja;.s'RICl. lie. 237 SOUiH 4iH Si ALBION, HE 68620 (800) 327-0790 Talcing Pride In Building Excellence PACE No. PRO.t:C1 TERRA NITROCEN CORPORA nON B 2430 J ADI>ltSS 250 INDUSTRIAL PARK lJRIVE DES/CN: Kl' 3 REY: BLAIR, NE 68008 DA7'E: 6/13/08 z:==mE-HUNG DOOR SWING: Specify using letters shown below \ B 88 ~~E3~' OUTSIDE OF BUILDING Designate FRONT SIDEWAll ~ . 'r" - ...... , . <SI ~ 2J;;.. """'-.,. ..J- . \.. ~~ :t SIDEWALL [4] ~/ ~ ..\t\ ~ I~ ~::::::: ~ ." 1 '~ \"'~\) , ' " ] '- tA"^ .,.. r'. '\' G'I e/'- . , ,1,. , , /:;" . , e..... tr'V v- '-- () I' ~ooT {fM~~ll~Gfi\ . ..... ENDWALL [1] ~ Be sure to locate all: · WINDOWS · WALK DOORS · LARGE DOORS */ndicate if LARGE DOORS are Overhead OR Slidinq. 25/ zS Signature/Date: ~~/- --.-' ~ ENDWALL [3] SIDEWALL [2] . ~ :t: . \:J' , . '-- ......... "> , - - >( ~ :1- " . - - " ~-~ .~~,.. .. . :t V\ -:t" ~ , '7" - , . .. ..x. . .. . ..... ::r- -- , 17 3/4" ~ 3 4" "'0 40' -a" OUT - TO-OUT OF STEEL II -90 ('~ 2 ~ 20' a" 20'-0" IX) 3" 2 1/2" A EW ;r; U 0 IX) . . 0 IX) -....... I 2" .. A C A r;-;J 0 ~ 4" ro II -90 ('~ CJ'l CJ'l C C '0 U 0 V ~ V 0 0 I I 0 l-. I I l-. CD - CD I ~ 3" I IX) x x 2 1/2" EW ..J W 2" w f- ,,-... (f) z See Plan u- 0 DETAIL B 0 Vi: Zv 7/8" f- .. B w-""'" B~ B :J B 21') 0 01') 1 '-0" I I 0 (f)- I I f- -I') I ~N f- :J 0 : 0 ..J ~ I 0 I 7 5/8" 0 I - ~ 6) 6) I '-" 2 1/2" II') N v SW v 'O;j' I v I I I N N 4" 4" N N See Plan EW/ SW See Plan IX) 4" . II ~ 2 1/2" IX) -....... A~ .. A c o ~ c 3" D~ D~ ~D ~D o IX) o 2" ~ 0~a~ 2'-10" 2'-10" 14'-4" 14' 4" 2'-10" 2' 10" 20' 0" 20'-0" FRAME LINE DIMENSIONS 2 3 ANCHOR BOLT PLAN NOTE: All Base Plates @ 100'-0" (U.N.) APPROVED REV DESCRIPTION ANCHOR BOLT SUMMARY ----- ---- Total Bend Qnt Loc Dia Len Len Proj SENTINEL BUILDING SYSTEMS (in) (in) (in) (in) A D1VJSJDN I:J'GLOBAL IausTRltl. IIilC.. ----- ---- ----- 237 SOUJ'H 4J'H SJ' l8! 8 DJ 3/4" 11.50 4.00 2.50 ALBION, HE 68620 1/16' l8! 12 EW 3/4" 11.50 4.00 2.50 (800) 327-0790 = 47'-2 @ 8 RF 7/8" 13.00 5,00 2.50 REVISIONS Taking Pride In Building Excellence PACE No. PROJECT TERRA NITROCEN CORPORATION NlORtSS 250 IN.DUSTRIAL PARK .DRIVE BLAIR, NE 68008 II 18 . . . . SPLICE Splice Mark SP- 1 SP- 2 PLATES & BOLTS Quan -----Bolt---- Top/Bot/lnt Type Dia Len 4 4 0 A325 0.750 2.00 4 4 0 A325 0.750 2.00 v FLANGE BRACES: Both Sides(U.N.) FBxxA( 1): xx=length(in) A - L2 x 1 /8 ~ \ II ~ ,. ~ .- ^ _^ ~";;,...,jg~:;:>~,""";:"'iC<~;,,,,,:7:'i'j3:(F?;;':::{';Z\::':;::: ~"' ;j>f.}');~',:c)CJ['i,~"~~?.;..,, Plate Size Wid Thick Length 10" 1/2" 1'-7 1/2" 6" 1/2" 1'-7 1/2" PIECE RF1 -1 RF1-2 WEB DEPTH START END 12.012.0 12.0/12.0 12.0/12.0 12.0 12.0 MEMBER SIZE TABLE WEB PLATE THICK LENGTH 0.188 120.0 0.188 74.4 0.188 116.7 0.188 24.0 ps- ~ /4" :; :; -ft": 26 Go. p8 ' 3'-iO 1/i6" i2'-6" ~ ~ 12'-6" Golvo1urne ~/4" o I v 2"~ 12 42" 12 Rfi - 2 RPI-2 0 0 ~ ~ I in I -v ~ "...t- o Q) 0 I ~ v .......0 v ~ I I c: I j-... -r-- Q) NO Q) ~ L;:: ~u 15 ~u L;:: ~ 0::: c: . Q) c: 0::: f")O r--_ f")O 15 -l> 15 - Q) - Q) It)_ It)_ ~() ~() lX) lX) I I 'i0 'i0 lX) I f") 1'-0 5/8" 22'-10 3 4" Clearance 8" 25' -0" our~To...OUT OF STEEL A D RIGID FRAME/CROSS SECTION FOR FRAME LINE 2 REV SENTINEL BUILDING SYSTEMS A ThVlS1[11 aGLOBAL :ktl.sTRltl. IIC.. 237 SOUTH 4TH ST ALBION, HE 68620 (800) 327-0790 o ~ I "...t- lX) I f") """"'cr In OUTSIDE FLANGE W x T X LEN 10x5 16 x192.8 10x5/16"x 9.8 6x1/4" x140.7 DESCRIPTION INSIDE FLANGE W X T X LEN 10x5 16 x179.0 6x1/4" x138.6 ~ /' v1~ ~(, ,,\8 APPROVED REVISIONS Taking Pride In Building Excellence PACE No. TERRA NITROCEN CORPORATION ADOOESS 250 INf)lISTRIAl PARK f)RIVE BLAIR, NE 68008 5 o I r--- ..- co I t<") 11' -4" FIELD SLOT GIRT WEBS FOR CABLE/ROD. MULTIPLE SLOTS MAY BE REQUIRED ACROSS GIRT DEPTH SLOTS l' \.IIDE AND 3' LONG~ lIf-ALIGN GIRT SLOT<S) \.I / COLUMN SLOT<S) 42" 12 ----0_ o ..- I I I I I I ffi] I >t o ..- I >t co I t<") I I I I iv--€) ffi] o-v ,----,.-, I 3070 I I WALK I I DOOR I I I I I I I ] EC-2 ENDWALL FRAMING: FRAME LINE 1 lIf lIf 12'-4" --- 2"h 12 --- I I I I I I G- 2 ffi] I I I I I I I I G-2 ~Vffi] ,--------, I I 5030 I I I WINDOW , I I I I I I I G - 'z- - - - - - - - - -! 'ffi] I I I I I I ~ ] EC-3 REV SENTINEL BUILDING SYSTEMS A DtvrSl1Jrt trCiLOBAL Ja...nRltt. 1M:. 237 SOU7'H 47'H S7' ALBION, HE 68620 (800) 327-0790 PR<>.<:CT BOLT TABLE FRAME LINE 1 LOCATION ER-1 ER-2 Columns QUAN TYPE 4 A325 4 A325 MEMBER TABLE FRAME LINE 1 QUAN MARK PART LENGTH 1 EC-1 PCE08356 15 -6 13 16 1 EC-2 PCE08354 17'-5 1 2" 1 EC-3 PCE08356 15'-6 13/16" 1 ER-1 PCE08354 12'-8 1/16" 1 ER-2 PCE08354 12'-8 1/16" 3 G-1 PZE08256 10'-7 1/2" 3 G-2 PZE08256 11 '-11" 2 CB-1 1/4" STR 11'-2" 1 CB-2 1/4" STR 12'-8" 1 CB-3 1 4" STR 11'-8" ANGLE TABLE FRAME LINE 1 010 PART LENGTH 1 PAN03206 10 -0 2 PAN04206 20'-0" CONNECTION PLATES FRAME LINE 1 010 QUAN MARK PART 5 6 PR80 6 6 CGC8 Note: Girts below 7' -4" may be cut In the field to allow installation of field located walkdoors and windows. Co 1"\ <t. DESCRIPTION APPROVED REVISIONS 7'aking Pride In Building Excellence PACE No. DT A TD AT[;I r-n""n ~ TERRA NI7'ROCEN CORPORATION _os 250 INIJllSTRIAL PARK IJRIVE I I I I I I I I I - i - = = = G-' G-\ [H~ (H G~ ~t [ [ ) [C"3 tc-2 [COol_ !. , il! [ tC-l ) [t..211 ) [ E:C..:t- (C"3 [ [t-. STANDARD ENDWALL BRACING THE STANDARD BEARING ENDWALL FRAME UTILIZES THE DIAPHRAM ACTION OF THE WALL PANEL TO TRANSMIT LATERAL WIND OR SEISMIC FORCES TO THE FOUNDATION. IF THIS DIAFRAM ACTION IS INADEQUATE TO RESIST THESE FORCES ONE OF THE FOLLOWING METHODS WILL BE USED TO SATISFY TH REQUIREMENTS. FLANGE BRACE EAVE STRUT PURlIN CLIP GIRT EAVE STRUT CLIP GIRT CLIP OPTIONAL CABLE BRACING WHEN DIAPHRAM ACTION OF THE PANELS IS INADEQUATE, THE FIRST ALTERNATIVE IS TO ADD CABLE BRACING BETWEEN ENDWALL COLUMNS. IN CASE, FLUSH GIRTS WILL RE- QUIRE FIELD SLOTTING TO ACCOMODATE THE CABLES. CABLES CAN ALSO BE ADDED TO THE ROOF BETWEEN ENDWALL RAFTERS AND MAIN FRAME TO TRANSFER THE LATERAL FORCES OF THE ENDWALL. OPTIONAL HALF LOAD FRAME A MAIN FRAME MAY BE USED INSTEAD OF A BEARING END FRAME. IF CABLE BRACING COULD NOT BE USED OPTIONAL FIXED BASE CORNER COLUMNS IF THE ENDWALL FRAMED OPENINGS ARE PLACED THAT CABLE BRACING CAN NOT BE PLACED; THEN FIXED BASE CORNER COLUMNS MAY BE USED. FIXED CORNER COLUMNS WILL INDUCE A MOMENT TO THE FOUNDATION REQUIRING SPECIAL FOUNDATION DESIGN ) [C-I- IS STANDARD NOTE PANEL ALL OTHERS DIAPHRAM ACTION ARE OPTIONS REV DESCRIPTION APPROVED REVISIONS Taking Pride In Building [xcellence PAGE No. SENTINEL BUILDING SYSTEMS Pllll.W A DIVIS:I~ [J\jLOBAL li'lkl'sfRlts. I~ 237 SOUTH 4TH ST ALBION, N[ 68620 ADIRESS (800) 327-0790 JOB NUMBER. DESIGN: JLS REV: .... ' DA T[: 4/ 3/02 I I I I I I I I f . DOOR JAM\ TK____ SCREWS ~ @ 12" O.C. -.......... TK____ SCREWS @ EACH GIRT BASE TRIM .~ .....\.....-.:._.._....;;..8'C".TE..c>10.>., .;.....i".._...,..."..."'.S;~iLG1Lj:!k2/ STRIP OF MASTIC TK____ SCREWS EACH SIDE OF MAJOR RIB ROOF SHEET INSIDE CLOSURE EAVE TRIM PIN ITET__ LAPTEK SCREW @ 12" O.C. HEADER COVER PIN ITHJ__ JAMB COVER JAMB TRIM OUTSIDE SIDEWALL SHEET- EAVE TRIM [J Wi \ ~ tQ HEAD TRIM JAMB TRIM CORNER TRIM HEADER JAMB COVER STANDARD TRIM PLAC[M[NT SIDEWALL SHEET- INSIDE CLOSURE TK____ SCREWS @ 12" O.C, HEAD TRIM~J PIN ITHT__ HEADER COVER PIN ITHJ__ (DOOR HEADER LAPTEK SCREWS r @ 12" O,C. I -ENDWALL SHEET -SIDEWALL GIRT TK____ SCREWS @ EACH GIRT J J lSIDEWALL SHEET CORNER TRIM PIN ITOC__ LAPTEK SCREWS @ 12" O.C. HEADER COVER HEAD TRIM EAVE TRIM CORNER TRIM TK____ SCREWS @ EACH PURLIN TK____ SCREWS @ 6" O.C. TO ANGLE RAKE TRIM- PIN ITRT__ SHEET ANGLE 4" X 2" 16 GA. LAPTEK SCREWS @ 12" O.C. OUTSIDE CLOSURE ENDWALL SHEET- STRIP OF MASTIC (ROOF SHEET L ROOF PURLIN (BEYOND) RAKE TRIM REV APPROVED DESCRIPTION REVISIONS Taking Pride In Building Excellence PAGr No. SENTINEL BUILDING SYSTEMS PROJECT A DIl/lSIIJIl o:GLDBAL Inx.lsTJuEs. nc. 237 SOUTH 4 TH ST ALBION, N[ 68620 (800) 327~0790 JOB NUMBER, ADDRESS DrSIGN: JLS Rrv: If)' 'R}H-N:r..." DA TD 4/ 3/02 I 0 i.. I I I I I I , - II i I LOCATION OF CLOSURES & TAPE SEALANT PRE-FORMED RIDGE CAP~ T'w'O BEADS OF MASTIC ROOF PANEL OF CLOSURE> ROOF PANEL \ r I.S. CLOSURE 'w' / MASTIC I _ ON NON-ADHESIVE SIDE ~RIDGE ROLL (Std on VnluMOster) CLOSURE (MASTIC TOP ~ BOTTOM RAKE TRIM\ \-. EA VE STRUT STRIP OF MASTIC D,S, CLOSURE I.S, CLOSURE /'w'ALL PANEL / 'w'ALL PANEL D,S, CLOSURE ~ ROOF PURLIN ~BASE ANGLE/CHANNEL I.S, CLOSURE ~BASE ANGLE/CHANNEL 1 1/2' BASE LAP 1 :,;:r ',J:,:::t,:;n;,:;:,:;;:,:r,. ~. ~;. f.,,' ,." ", SECTION THROUGH SIDEw ALL J 1 1/2" BASE LAP 1 SECTION THROUGH ENDw ALL :-ti:['f::::\::? NOTES: 1. ALL BUILDING MODELS HA VE MASTIC IN ROOF PANEL SEAMS. 2. FORTRESS BUILDING MODEL HAS MASTIC IN \J ALL PANEL SEAMS. 3. REVERSE -ROLL PANELS REVERSE THE LOCA TION OF CLOSURES; TOO. REV DESCRIPTION REVISIONS Toking Pride In Building [xcellence SENTINEL BUILDING SYSTEMS PROJECT A DtVISltJi DfGLDBAL ~WSTRIE:S, tIC. 237 SOUTH 4TH ST ALBION, N[ 68620 (800) 327-0790 ADDRESS APPROVED PAGE No, JOB NUMBER' DESIGN: REV' nJ\ Tr. 1 /nc.. /nr:::. /9 ..~ - -- --- ---~-----~~~ BUILDING INSPECTION REPORT o CITY OF BLAIR LOCATION OF INSPECTION' NAME OF OWNER' \' Q./\J\.-c.. DATE INSPECTION REQUESTED' 't-. \ o WASHINGTON COUNTY ) .).0 o OTHER S,~ p~ ftt CONTRACTOR' TIME INSPECTION REQUESTED' d~OO PERMIT NO' 1 d ) 77 TYPE OF INSPECTION REQUESTED: 0 CONFERENCE BUILDING: 0 FOOTING 0 DECK FOOTING 0 FRAMING 0 DRYWALL 0 FINAL 0 PARTIAL o STATUS CHECK PASSED FAILED o 0 COMMENTS: UTILITIES: 0 SEWER TAP o PARTIAL o WATER TAP 0 REMOTE 0 WATER SERVICE (~ Pr!D F~ED PASSED FAILED o 0 ,: COMMENTS: ELECTRICAL: O. ROUGH IN 0 FINAL 0 PE o PARTIAL ENT SERVICE 0 TEMPORARY SERVICE 0 PRECONNECT COMMENTS: MECHANICAL:O ROUGH-IN 0 NC 0 FURNACE O. RADIANT HEAT 0 FINAL 0 PARTIAL PASSED FAILED o 0 . '0 COMMENTS: PLUMBING: COMMENTS: o GROUNDWORK 0 ROUGH-IN 0 FINAL 0 WATERMETERINSTALLED 0 PARTIAL o PRESSURE TEST PASSED FAILED o 0 o OCCUPANCY GRANTED .0 CONDITIONALOCCUPANCYGRANTED ~ ttJ;; . ~f'-) Nm:ES/REMARKS. ~.. 60 ~u...~1E ./); \ :5 0<, J:;)c.I . udf/ ':h,d;) 16 ~~q3o 3:,Cf .Jj?- ~;S~S -c: INS DATE OF INSPECTION MADE: TThm' :3 3fI FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY BUILDING INSPECTION REPORT ~cITY OF BLAIR o WASHINGTON COUNTY o OTHER (lJezi;; ~c -(-IV;'1k..) ~I l;iL1... /tv'71 OU~) . .. "- J , ' / [..<...) /UA.,J ('-/{..L<J j..{j~) LOCATION OF INSPECTION' c:?5 t) IrA l /(/ . '~I:)" t .. ''''A' n /1'../,) / ~-tA:>"....::.t.J NAME OF OWNER' j',-//: ({.k.. I' . I' ,.~i cJ Cl.f:/r'-~' CONTRACTOR' H (,l DATEINSPECTIONREQUESTED/O v' - OC) TIME INSPECTION REQUESTED' PERMIT NO' /;197"7 TYPE OF mSPECTION CONFERENCE STATUS CHECK BUILDmG: 0 FOOTING 0 DECK FOOTING 0 FRAMING 0 DR~;~L~'i;,~~AL : PART~~L . r P~ED F~D, CO.tv1MENTS: /' o'c.-:icJ ,.RtJ1 (.' O[,,~0.CJ <;t' (] tr/iJ'::Z/U./{J..,('.Jt'J"'D4- j ~",=,,~n~~"':iZ.:~ ~~~*~a'?~ L/ UTILITIES: 0 SEWER TAP ,0 SEWER 0 SEPTIC 0 WATER TAP 0 REMOTE 0 WATER SERVICE PASSED FAILED o PARTIAL 0 0 COMMENTS: ~~~~~~~~~,%'~W"=%~~~~~~","~~.d!ll ELECTRICAL: 0 ROUGH IN 0 FINAL 0 PERMANENT SERVICE 0 TEMPORARY SERVICE 0 PRECONNECT o PARTIAL COMMENTS: PASSED FAILED o 0 ~~<~~..;t:~~~~~~~~~~~~~..=:r..:z=~~~".; MECHANICAL: 0 ROUGH-IN 0 AlC 0 FURNACE 0 RADIANTHEAT 0 FINAL 0 PARTIAL PASSED F8JLED 0' 0 PLUMBmG: 0 G~OUNDWORK 0 ROUGH-IN 0 FINAL 0 WATERMETERINSTALLED 0 PARTIAL [J PRESSURE TEST CO;M1Y1ENTS: ' ~~~~oili= ""..._~~"'..."."..,... ~~~"Z.:~~~ o 'OCCUPA:NOYG'RANTED 0, ",C.C~~~~,A3,'~ ~A~~,A;r . . NOTES/REtvMBKS: . fO.L.. ~_'It:!~ . ' , I, ,/ 1J2~ ~(7P/ cjliA;j PASSED FAILED o 0 {{QtLtf /UI!IIJ( " . "' .. a . a , -,.' I f___ ., - - -- .. -l_ I' 'ri~ ~,li~ ~ . ,jrf, ." '. I ,It! ~-. j; ....<0: ~~~=~'"~~~~~-:::-"'--~,~_.._,,-- ,-~.,~~~'-:~~::--::-'.;..~n-:=-,~~,~,......~_~..~~.~" .~.~;:::~-=~-~.~_~<"C" BUILDING INSPECTION REPORT ~ ,;I' ~CITY OF BLAIR D WASHINGTON COUNTY D OTHER LOCA nON OF INSPECTION' I' I) ...., -/"o,J ' NAME OF OWNER' -~ (_/JA/! t:u ( , I' f A Iv! j,.'(,;; (?t".....j I '--, ,,_ ;r " f7 J-..p /' r:. jJ /"_v,~..') I' ) < ../ _..-'v Ll', ~ r:;4-:Lj',lvtr4. CONTRACTOR' l (~;t.'?M) DATE INSPECTION REQUESTED' r..-f! .... ,- C) ';1 TIME INSPECTION REQUESTED' /l~r PERMIT NO' /0117 :7 TYPE OF INSPECTION REQUESTED: D CONFERENCE D STATUS CHECK ~~~~~~~~~'" ~ ~=-"'''''-~~"'''f.:'"~~::;>''~=-~,;<~ BUILDING: D FOOTING D DEC,KFOOTING D FRAMING D DRYWALL q--4INAL D PARTIAL PASSED:E.AIL D " .4 A r D . C?M1!ENT~=~=.~-=_:f.;!~c>u t,:~_.E3;:{1"~,L2:,,~~:!::.~ !...~~~4:Sl~ ~ if UTILITIES: D SEWER TAP, D SEWER D SEPTIC D WATER TAP D REMOTE D WATER SERVICE PASSED FAILED D~IAL D D COMMENTS: . ,- . """"~~~~~~~~~~~=:.m--~'<:1J.znT~~~~"$ ""'~~~-:z:f.=-~,,~ ELECTRICAL: D- ROUGHIN D FINAL D PERMANENT SERVICE D TEMPORARY SERVICE D PRECONNECT PASSEl? FAILED D PARTIAL Q: D {';-f - ;:?/' COMMENTS: COMMENTS, D MECHANICAL:D ROUGH-IN D AlC D FURNACE D RADIANTHEAT D FINAL D PARTIAL I'LUMBING( D GROUNDWORK D ROUGH-IN D FINAL D WATERMETERINSTALLED D PARTiAL , :' ' . , ',I !. o PRESSURE TEST ' " ' CO~NTS~' , c~ " . " ~ " . - \., .-' I I ~~b;iM&GiANi~D-CbNnn~~~n;ANcy;A;;;il~-'~~'~~-~=~-=-~~=" ' PASSED FAILED o [] NOTESlREMARKS' - , " + I rra NITROGEN Blair Terminal ______ _~~__ >. _ +._......",..,..-.____ . -~~~...,-~~ ._ ~~..~-_^'---~-.---____.~..~.~=.____=_=T~~~~..."~..':,,.,..t..,''';-'''._~.,_--'-""-."'---n.'c~.rc.'""-1I"~....'_"'_"-,,, _-"='=_r-'~"'''''''-''''--''''''''''''''----C BUI:LDrNG INSPECTION REPORT I EJ CITY OF BLAIR D WASHINGTON COUNTY D OTHER ./'} <<:-- /) .~... ~/ ", /'j " .0-/' ;~, I }<2/ LOCATION OF INSPECTION' i.:::.'.c.....) (j ~,.__--. /lI 0' C"...:> ,:C I /( "'.- NAME OF OWNER/ZEIt>'! /1/;7/23.:)6 Ell CONTRACTOR' . / I r'~ DATE iNSPECTION REQUESTED' <-.;:;? ./::;;:;'6 /L~7 ~ TIME INSPECTION REQUESTED' / ' /l! C t/ L~)'~ / /7 1<..-. f...-, . I"..... 1 /", /'7,.A....;, ~-J 1'..../ l.if 'j . PERMIT NO' / ../) / / TYPE OF INSPECTION REQUESTED: D CONFERENCE D STATUS CHECK BUlL DING , D~ D DECKFOOTING D FRAMlNG "[j'";;;YWAlL ~AL~~-;;:;;;' I r D COMNIENTS: UTILITIES: D SEWER T~ D S~WE~O=;;;~-' 0 ;;;;;;~;;;~;;;~;~-- . ~SSED ;A~~ Du~~ . D D COMMENTS: ELECTRICAL: 0 ROUGH IN [it FINAfQ PERMANENT SERVICE 0 TEMPORARY SERVICE D PRECONNECT / . .- o PARTIALc FAILED D MECHANICAL:D ROUGH-IN D AlC 0 FURNACE D RADIANTHEAT D FINAL D PARTIAL PASSED FAILED D D PLUMBING: 0 GROUNDWORK D ROUGH"IN D FINAL 0 WATERMETERINSTALLED D PARTIAL .. . 0 PRESSURE TEST PASSED FAILED D D COMNIENTS: ~~CUPANCY~;ANt~NriITI?~A4~~uPANGycGR~;';= NOTES/REMARKS' . Bl.lir 1l'ril1illal . Bl.lir 1l'ril1illal