Loading...
BP11787City of Blair Building Permit Detail Permit #: 11787 Issued: 10/22/2004 Completed: 2/3/2005 Location: 860 N 10th Ave Owner: Mark Olson Address: 860 N 20th Ave Type: Roofing permits -All types Valuation: 4500 Blair, NE 68008 Phone: 804-897-0900 Section: Township: Range: Subdivision: Lot: tear off one layer to decking and replace w/asphalt Contractors McKinnis Roofing & Sheet Metal General Contractor Remarks Permit Fee: 15 Issue Fee: Deposit Amt.: Receipt #: Block: Permit # Issued Inspections Date By 2/3/2005 DEM Final Inspection of Project Pass ~~ o~,BUILDING PERMIT APPLICATION ?(~j ~ Jurisdiction of City of Blair, Nebraska Permit Fee: 218 South 16th Street Issuance Fee: Blair, Nebraska 68008 1 17 8 7 Receipt #: (402) 426-4191 • Fax (402) 426-4195 Permit Deposit Receipt # ~~ Issue Date: o ~~ Type: d~ JOB ADDRESS ~~~ ~ ~~~--T ( /7 LEGAL 1. DESCR. ^ SEE ATTACHED SHEET 2.0 I ' K ~ MAIL ADDRESS Zlp HOME PHONE WORK/CELL PHO 3, CO ~OR~ ~ ~ l MAIL ADDRESS C ZIP HOME PHONE WORK/CELL PHONE 4. Class of Work: ^ NEW ^ ADDITION Q REMODEL OTHER ^ FINISHED BASEMENT Q UNFINISHED BASEMENT 5. Describe Work: ~~;~' ~•~ ~~~ ~~~.; ~ ~ -~ Lc.~c~. c.,~ a 6. Valuation of Work: $ e~~ ~^ Total Sq. Footage pnaua~ng easement aria Garage): Total Finished Area: Floodway Q Yes ^ No 7. Floodplain: Fringe Q Yes ^ No Dev. Permit BFE Elev. Cert. 8. Current Zoning: 9. State Fire Marshall Required: ~ Yes Q No 10. Special Use Permit Required: ^ Yes ^ No_ 11. Variance Required: ^ Yes Q No 12. Minimum Setbacks: Front 13. Sidewalk Required: Q Yes Side Rear 0 No Waiver Approved NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic systems. By my signature below, I acknowledgethat payment of the building permit application fee does not constitute issuance of this building permit. I furtheragree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed bythe Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. l underss~~nd thatthis permit is void if work is not commenced within 180 days or is not complet$~ within 2 years of date of issue. t~Y _ Comment: DATE ~ Site Plan Attached ~ ~~ y~ Cc~plete Plans Attached Approximate Completion Date ~S Cs',",,,) Inspections Required and Fees Utilities _ Sewer_ Septic _ B it in Footings , Framing EI ri I Rough-in Final Temporary Service Mechanical Rough-in _ Final lumbin . Ground Work Rough-in _ Water Service Remote Stop Box Card Drywall (PRIOR TO TAPING) Final Fixtures Permanent Service A`C , Final WHEN PROPERLY VALIDATED (IN THIS S Approved THIS IS YOUR PERMIT POUNDS PRIG: Blair, NE Rev. 8/96 a -~ ~ ,Q BUILDING INSPECTION REPORT CITY OF BLAIR ^ WASHINGTON COUNTY ^ OTHER .LOCATION OF INSPECTIONS ~ l/ 1l / ' /(/ ~ ~~~Q NAME OF OWNER: tJ ~.SQ~ CONTRACTOR: ~/~ ' / ~~C, ~L~ DATE INSPECTION REQUESTED•~~~~~~ TIME INSPECTION REQUESTED• ~ / PERMPI' NO• TYPE OF INSPECTION REQUESTED: ^ CONFERENCE n STATUS CHECK BUILDING: ^ COMMENTS: FOOTING ^ DECK FOOTING ^ FRAMING ^ DRYWALL FINAL ^ PARTIAL D PASSED ~ FAILED ^ UTILITIES: ^ ^ COMMENTS: SEWER TAP ^ SEWER ^ SEPTIC ^ WATER TAP ^ REMOTE ^ W TER SERVICE PARTIAL PASSED ^ FAILED ^ ELECTRICAL: ^ ^ COMMENTS: ROUGH IN ^ FINAL ^ PERMANENT SERVICE ^ TEMPORARY SERVICE ^ PRECONNECT -PARTIAL PASSED ^ FAILED. ^ MECHANICAL: ^ COMMENTS: ROUGH-IN ^ A/C ^ FURNACE ^ RADIANT HEAT ^ FINAL ^ PARTIAL PASSED ^ FAILED ^ PLUMBING: ^ COMMENTS: ^ GROUNDWORK ^ ROUGH-IN ^ FINAL ^ WATER METER INSTALLED ^ PARTIAL PRESSURE TEST PASSED ^ FAILED ^ ^ OCCUPANCY GRANTED ^ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS• I ATE OF INSPECTION MADE: ~ T1MR• /~l FAXED OPPD~BURT REA TO CONNECT SERVICE: ON BY