Loading...
BP11343 City of Blair Building Permit Detail ~, Perrr~it #: 11343 Issued: 8/16/2004 Completed: 5/4/2005 Location: 1142 S. 16th Street Owner: Michael & Mary Jo O'Hanlon Address: 1142 S. 16th Street Blair, NE 68008 Phone: Section: Township: Range: Subdivision: Lot: Tear off one layer and replace with 30-year composition shingles Contractors Jim La Hood Construction, Inc. General Contractor Remarks type: Roofing permits -All types Valuation: 6500 Permit Fee: 15 Issue Fee: Deposit Amt.: Receipt #: Block: Permit # Issued Inspections Date By 5/4/2005 DEM Final Inspection of Project Pass BUILDING PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska Permit Fee: ~ ~~X~ 218 South 16th Street Issuance Fee: Blair, Nebraska 68008 113 4 3 Receipt #: (402) 426-4191 • Fax (402) 426-4195 Permit Deposit Receipt #: ` Issue Date: ~~ Uy Type: ~~U' ' ~~ JOB ADDRESS f ~ ~ I ~ ~ ~~ ~ I ' LEGAL 1 . DESCR. ^ SEE ATTACHED SHEET OWNER ~~ --. 2. I C ,~"lG(r Q M I DRESS ZIP HOME PHONE WORKICELL PHONE CO CTOR ~ ~~ U l~V'1 S. V' 1 MAI DDRESS ~~ ~ ~~ ~ZIP~~~ OMEPHONE ~ 3--~~~~~ WORKICELL PHONE 4. Class of Work: NEW Q ADDITION ~ REMODEL Q OTHER Q FINISHED BASEMENT ^ UNFINISHED BASEMENT 5. Describe Work: ~'d ~~ ~ / ~ `,~~ ~ U''/) ~ 3 ~ 6. Valuation of Work: $ (p ~ (,~(~ • ~ Total Sq. Footage pDDmding Basement ana Garagel: Total Finished Area: Floodway Q Yes Q No 7. FIOOdplain: Fringe Q Yes Q No Dev. Permit BFE Elev. Cert. 8. Current Zoning: 9. State Fire Marshall Required: ~ Yes 10. Special Use Permit Required: Q Yes 11. Variance Required: ^ Yes Q No Q No Q No 12. Minimum Setbacks: Front Side Rear 13. Sidewalk Required: Q Yes Q No Waiver Approved . NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered bythis permitapplication shall not be commenced until I have received a copy of this application form signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codeslordinances of the City of Blair and the Stateo braska.lunderstandthatthispermitisvoidifworkisnotcommencedwithin 180 ys r is not co~eted within ears of ~ of issue. OF OWNER/CONTRACTOR Comment: DATE O Site Plan Attached ~ / O ~ n}~Iet~ Plans Attached Approximate Completion Date ~ / ~J ili i Inspections Required and Fees Sewer Water Service Septic Remote Stop Box Card Buil in Footings Drywall (PRIOR TO TAPING) Framing Final Electrical Rough-in Fixtures Final Permanent Service Temporary Service Mechanical Rough-in A\C Final PI m in . Ground Work Rough-in _ Final WHEN PROPERLY VALIDATED (IN THIS SPACE THIS IS YOUR PERMIT Approved By: ~ ~, POUNDS PRIG: 81air, NE r ~ l~ R~• 8/96 ~4 ~~' - _ TI'Y OF BLAIR /LOCATION OF INSPECTION: l NAME OF OWNER: . , ~ , w. -~ -- - BUILDING INSPECTION REPORT ^ WASHINGTON COUNTY ^ OTHER /t// DATE INSPECTION REQUESTED• S G ~ TIME INSPECTION REQUESTED• / ( l PERMIT NO: e/ ~7` TYPE OF INSPECTION REQUESTED: ^ CONFERENCE ^ STATUS CHECK BUILDING: ^ FOOTING ^ DECK FOOTING ^ FRAMING ^ DRYWALL ~ FINAL ^ PARTIAL PASS FAILED COMMENTS: ~ ^ UTILITIES: ^ ^ COMMENTS: SEWER TAP ^ SEWER ^ SEPTIC ^ .WATER TAP ^ REMOTE ^ WATER SERVICE PARTIAL PASSED ^ FAILED ^ ELECTRICAL: ^ ^ COMMENTS: ROUGH IN ^ FINAL ^ PERMANENT SERVICE ^ TEMPORARY SERVICE ^ PRECONNECT PARTIAL PASSED ^ FAILED ^ MECHANICAL: ^ ROUGH-IN ^ A/C ^ FURNACE ^ RADIANT HEAT ^ FINAL ^ PARTIAL PASSED FAILED COMMENTS: ^ ^ PLUMBING: ^ COMMENTS: ^ GROUNDWORK ^ ROUGH-IN ^ FINAL ^ WATER METER INSTALLED ^ PARTIAL PRESSURE TEST PASSED ^ FAILED ^ ^ OCCUPANCY GRANTED ^ CONDITIONAL OCCUPANCY GRANTED INSPECT6 DATE OF INSPECTION MADE: v FAXED OPPD~BURT REA TO CONNECT SERVICE: ON By CITY OF BI;t1IR - _ ~~~. aro~~se of a`~a\\ ROOFING PERMIT SUPPORTING DOCUMENTS This supporting document includes information dealing with particular code requirements and/or roofing permit requirements. It in no way includes ALL particular code items. Also, it is your responsibility to know the 2003 International Building Code requirements that apply to your project. Please understand this document is only designed and distributed to aid you in your roofing permit process. A copy of the International Building Code is available for your use at the Blair Public Library. I have read the above disclosure and accept this building permit documentation on my own behalf assuming full responsibility as the owner/contractor for this project. Owner/Occupant City of Blair ontractor Date 218 South 16th Street • Blair, Nebraska 68008 • 402-426-4191 • Fax 402-426-4195 E-mail cityofblair@ci.blair,ne,us