Loading...
BP11754City of Blair Building Permit Detail Permit #: 11754 Issued: 10/14/2004 Type: Roofing permits -All types Completed: 12/28/2004 Valuation: 43000 Location: 1215 1225 1235 1255 1265 & 1285 N. 10th Street Owner: Northview Point LLC Permit Fee: 15 Address: 4852 S. 133rd Street Issue Fee: Omaha, NE 68137 Phone: Section: Township: Range: Subdivision: Lot: Tear off one layer asphalt; replacing with asphalt class "A" fiberglass Contractors Landmark Enterprises General Contractor Remarks Deposit Amt.: Receipt #: Block: Permit # Issued Inspections Date By 12!28/2004 DEM Final Inspection of Project Pass BUILDING PERMIT APPLICATION ~-~ ~~ Jurisdiction of City of Blair, Nebraska Permit Fee: 218 South 16th Street Issuance Fee: Blair, Nebraska 68008 1 17 5 4 Receipt #: (402) 426-4191 • Fax (402) 426-4195 Permit Deposit Receipt #: ~ f - Issue Date: ~ b ~ ~ ~~ Type: ~ r< <1 ~/) JOB ADDRESS 12i.~~ZZS ~/Z35`~//~~i5 /~Zbs f~L ~S /v° `Nl 5-f~ LEGAL 1 . DESCR. ^ SEE ATTACHED SHEET OWNER ~ 1 2, (~ ~~ ~C_ / ~ , MAI ADDRESS )L(/~ ~_ Zlp HOME PHONE WORKICELL PHONE COhITRACTOR 3• ~d m ~-,^ MAIL ADDRESS l~ G' 1~ 1 ~ ~ < ~ ~ ZIP HOME PHONE ~ • ~ WORKICELL PHONE ~ g 4. Class of Work: i NEW 0 ADDITION Q REMODEL ~ OTHER Q FINISHED BASEMENT ^ UNFINISHED BASEMENT 5. Describe Work: R~- --k~v~~ ~ ~ I ~~-1 1 ~ f / a (e 6. Valuation of Work: $ 43 (~0~ -Z~ Total Sq. Footage pncluafng Basement ana Garage): Total Finished Area: Floodway Q Yes Q No Dev. Permit 7. Floodplain: Fringe Q Yes Q No BFE Elev. Cert. 8. Current Zoning: 9. State Fire Marshall Required: Q Yes l7 No 10. Special Use Permit Required: Q Yes ^ No 11. Variance Required: Q Yes Q No 12. Minimum Setbacks: Front Side Rear 13. Sidewalk Required: O Yes Q No Waiver Approved NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic systems. By my signature below, I acknowledgethat payment of the building permit application fee does not constitute issuance of this building permit. I furtheragree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. l understand thatthis~~ermit is void if work is not commenced within 180 davs~is not completed within,2'Gears of date of issue. SIGNATURE OF Comment: POUNDS PRIG: 61etr, NE DATE Q Site Plan Attached ; ~Q~ pmplete Plans Attached Approximate Completion Date / I `f Inspections Required and Fees ili i Sewer _ Septic _ Buildin Footings Framing EI c ric I Rough-in Final Temporary Service Mechanical _ Rough-in Final Plumbin Ground Work Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Approved By: n - , ~ /) Rev.8/96 Water Service Remote Stop Box Card Drywall PRIOR TO TAPING) Final Fixtures Permanent Service A\C , BUILDING INSPECTION REPORT L/J CTI'Y OF BLAIR ^ WASHINGTON COUNTY ^ OTHER ~ LOCATION OF INSPECTION ~~/..~:~ - `f``~`` ~ ~ `~'~'~ `' `~.~-'`~'?'~'~ - i ~~r~° /~~,j !~/~ /O 'T~~J'~J`6 NAME OF OWNER/ ~ ~~~•' / ~~1'!~ / <~ =%"~~ ~~ ~ ~/ CONTRACTOR ~ f~_~'I ~..1-'YI L~~°'y% ~? ~ ~ v~'~ f/'%ir .DATE INSPECTION REQUESTED• ~'~~~~=`i~~~~~ ~ ~ TIME INSPECTION REQUESTED: ~ ~ PERMIT NO• l ~`-1 TYPE OF INSPECTION REQUESTED: ^ CONFERENCE ^ STATUS CHECK BUILDING: ^ COMMENTS: FOOTING ^ DECK FOOTING ^ FRAMING ^ DRYWALL FINAL ^ PARTIAL ~ ~G~ PASS FAILED ^ UTILTTIES: ^ ^ COMMENTS: SEWER TAP ^ SEWER ^ SEPTIC ^ WATER TAP ^ REMOTE ^ WATER SERVICE PARTIAL PASSED ^ FAILED ^ ELECTRICAL: ^ ^ COMMENTS: ROUGH IN ^ FINAL ^ PERMANENT SERVICE ^ TEMPORARY SERVICE ^ PRECONNECT PARTIAL PASSED FAILED ^ ^ MECHANICAL: ^ COMMENTS: ROUGH-IN ^ A/C ^ FURNACE ^ RADIANT HEAT ^ FINAL ^ PARTIAL PASSED ^ FAILED ^ PLUMBING: ^ ^ COMMENTS: GROUNDWORK ^ ROUGH-IN ^ FINAL ^ WATER METER INSTALLED ^ PARTIAL PRESSURE TEST PASSED ^ FAILED ^ ^ OCCUPANCY GRANTED ^ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS• / `I / , DATE OF INSPECTION MADE: C T ` ~ FAXED OPPD~BURT REA TO CONNECT SERVICE: ON CITY OF BI,~~II~ ROOFING PERMIT SUPPORTING DOCUMENTS This supporting document includes information dealing with particular code requirements and/or roofing permit requirements. It in no way includes ALL particular code items. Also, it is your responsibility to know the 2003 International Building Code requirements that apply to your project. Please understand this document is only designed ahd distributed to aid you in your roofing permit process. A copy of the International Building Code is available for your use at the Blair Public Library. I have, read the above disclosure and accept this building permit documentation on my own behalf assuming full responsibility as the owner/contractor for this project. i { caner/Occupant I ~.~,~ City of Blair Contractor ~ ~~ ~ ~v Date ~- 218 South 16th Street • Blair, Nebraska 68008 • 402-426-4191 • Fax 402-426-4195 E-mail cifyofblair@ci.blair.ne,us ~~~•~'~•"' 1.. M ~~ d #k. ~ v~ {~i 1 ~. ~~~~ .~ -- ~~~