Loading...
BP10141City of Blair Building Permit Detail Permit #: 10141 Issued: 4/2/2004 Completed: 4/8/2004 Location: 240 E. Highway 30 Owner: Nebraska Storage Address: 240 E. Highway 30 Blair, NE 68008 Phone: Section: Township: Subdivision: Replacing old roof with tin roof Contractors Joseph R. Funk Construction Remarks Type: Roofing permits -All types Valuation: 10000 Range: Lot: General Contractor Permit Fee: 15 Issue Fee: Deposit Amt.: Receipt #: Block: Permit # Issued Inspections Date By 4/8/2004 DEM Final Inspection of Project Pass BUILDING PERMIT APPLICATION /~~~^ ~V Jurisdiction of City of Blair, Nebraska Permit Fee: / 218 South 16th Street Issuance Fee: Blair, Nebraska 68008 10141 Receipt #: (402) 426-4191 • Fax (402) 426-4195 Permit Deposit Receipt #: Issue Date: / ~ "~N Type: " JOB ADDRESS ago ~ 3~ LEGAL 1 . DESCR. ^ SEE ATTACHED SHEET OWNER 2, MAIL ADDRESS Zlp HOME PHONE WORKICELL PHONE 3 CONTRACTOR ~ MAI~~RES~~ JJ ~`~~ ~~ i ~ 'ZIP / C7~"/ WORK/CEOLLPHONE (O~~ °S~p~~ 4. Class of Work: ^ NEW ^ ADDITION ^ REMO DEL ^ OTHER ^ FINISHED BASEMENT ^ UNFINISHED BASEMENT 5. Describe Work: ~ l~ 0 6. Valuation of Work: $ ) (~ ~ ~ ° Total Sq. Footage (Including Basemenc and Garage): Total Finished Area: Floodway ^ Yes ^ No 7. Floodplaln: Fringe ^ Yes ^ No Dev. Permit BFE Elev. Cert. 8. Current Zoning: 9. State Fire Marshall Required: ^ Yes ^ No 10. Special Use Permit Required: ^ Yes ^ No 11. Variance Required: ^ Yes ^ No 12. Minimum Setbacks: Front 13. Sidewalk Required: ^ Yes Side Rear ^ No Waiver Approved NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered bythis permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand thatthis permit is void if work is not commenced within 180 days or is not completed within 2 years of date of issue. SIGN~NER/69 RACTOR DATERACTOR DATE Comment: ^ Site Plan Attached Approximate Completion Date ^ Complete Plans Attached y' 3--0~ Inspections Required and Fees Utilitie Sewer Water Service Septic Remote Stop Box Card Buildin Footings Drywall (PRIOR TO TAPING) Framing Final Electrical Rough-in Fixtures Final Permanent Service Temporary Service Mechanical Rough-in ABC Final Plumbing . Ground Work Rough-in _ Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Approved By: (~ ,~ POUNDS PRTG: Blair. NE (1 Rev. 8/96 -~f~.___ - BUILDING INSPECTION REPORT -- -~-- ~T...----- C~I'Y' OF BLAIR ^ WASHQVGTON COUNTY ^ .OTHER LOCATION OF INSPECTION` NAME OF OWNER: _ ~~f°~ CONTRALTO ~~ ~'~ j-•~,LJ ' r DATE INSPECTION REQUESTED• ~ ~ TIME IIVSPECTION REQUESTED• ~ PERMTI' NO• ~f ~ U ~ r TYPE OF INSPECTION REQUESTED: ^ CONFERENCE ^ STATUS CHECK BUILDING: ^ FOOTING ^ DECK FOOTING ^ FRAMIIVG ^ DRYWALL FINAL ^ PARTIAL PASS FAILED COMMENTS: ~ ^ UTILITIES: ^ COMMENTS: ^ SEWER TAP ^ SEWER ^ SEPTIC ^ WATER TAP ^ REMOTE ^ ATER SERVICE PARTIAL PASSED ^ FAILED ^ ELECTRICAL: ^ COMMENTS: ^ ROUGH IN ^ FINAL ^ PERMANENT SERVICE ^ TEMPORARY SERVICE ^ PRECONNECT PARTIAL PASSED ^ FAILED ^ MECHANICAL: ^ ROUGH-IN ^ A/C ^ FURNACE ^ RADIANT HEAT ^ FINAL ^ PARTIAL PASSED FAILED COMMENTS: ^ ^ PLUMBING: ^ COMMENTS: ^ GROUNDWORK ^ ROUGH-IN ^ FINAL ^ WATER METER INSTALLED ^ PARTIAL PRESSURE TEST PASSED ^ FAILED ^ ^ OCCUPANCY GRANTED ^ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS FAXED OPPD~BURT REA TO CONNECT SERVICEc ON T ~ ~f~~ BY