Loading...
BP9423~~ ~ I~ i Permit #: 9423 Issued: 11/14/2002 Completed: 07/31 /2003 Location: 650 Industrial Road Owner: PGLA Address: 650 Industrial Road Blair, NE 68008 Phone: 402 533 1756 Section: Township: Range: Subdivision: Lot: 5' x 10' vestibule entrance to control room on second floor of PGLA plant Contractors Cargill General Contractor Remarks Permit Fee: 270 Issue Fee: 15 Deposit Amt.: 200 Receipt #: 7955 Block: Permit # Issued Inspections Date By 11!21/2002 DEM Conference Pass 07/2212003 DEM Final Inspection of Project Fail 07/31/2003 DEM Final Inspection of Project Pass City of Blair Building Permit Detail Type: Industrial/Commerical -Additions Valuation: 11088 ~. . ~ ~~~ BUILDING PERMIT APPLICATION ~ ~F• ~ moo"'' Jurisdiction of City of Blair, Nebraska Permit Fee: Z 218 South 16th Street jj ~y~ Issuance Fee: l Blair, Nebraska 68008 9 4 2 3 Receipt #: ,~ ~ (402) 426-4191 • Fax (402) 426-4195 Permit Deposit Receipt #: ~ g ~~ ,~rb ~ Issue Date: ~ ~'"~ "~~ Type: JOB ADDRESS l ~ ..1- c 5 ~' tl~, P.~~ ~ (~G L ~ ~l LEGAL 1 . DESCR. ^ SEE ATTACHED SHEET NER 2, , MAILADDRESS p ZIP ~ ~h S ~ wl HOME PHONE ~5 u-r( f, • WORKICELL PHONE ~~.-("~SL CONTRAC R 3, MAIL ADDRESS ZIP HOME PHONE WORK(CELL PHONE 4. Class of Work: Q NEW ASEMENT ADDITION Q REMODEL Q OTHER O FINISHED BASEMENT O UNFINISHED B 5. Describe Work: ~' ~( CSI v~~'~sh-~~J~,l.. (~1~(;C~I~,Q.... `~ ~~1'l~'l~~ R -'Yl •- ~~ ~" ~ ~~ T~, ca 6. Valuation of Work: $ ~ ~ ~~ -- Total Sq. FOOtage pncluding Basement and Garage): ~~ Total Finished Area: Floodway ^ Yes 7. Floodplaln: Fringe ^ Yes ^ No Dev. Permit ^ N BFE Elev. CeR. 8. Current Zoning; / 9. State Fire Marshall Required~es 10. Special Use Permit Required: O Yes to ~No 11. Variance Required: 0 Yes No 12. Minimum Setbacks: Front ~ Side .~ Rear 13. Sidewalk Required: Q Yes ~ No Waiver Approved NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector. I hereby agreeto perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand thatthis permit is void if work is not commenced within 180 days or is not completed within 2 years of date of issue. ~~ ~ O ~ SIG ATURE OF OWNERICONTRAC70R DATE Comment: MEET IBC, IRC~IPC; IMC AND NEC CQDE REQUIREMENTS ~q+~t`tt~l~t-~-~ ~~ ~~ Vii[ Q Site Plan Attached D Complete Plans Attached Approximate Completion Date ~ ~ - I S • u ~- Inspections Required and Fees Utilities Sewer Water Service Septic Remote Building Footings Framing Stop Box Card Drywall (PRIOR TO TAPING) Final Electrical Rough-i Fixtures Final Temporary Service M hani Roug ,n _ Fina Plumbing Ground Wor Rough-i Final WHEN PROPERLY VALLDATECNtN THIS SP Permanent Service A\C PERMIT Rev. BI96 POUNDS PRTG: Blair, NE BUILDING INSPECTION REPORT V~ CTI'Y OF BLAIR ^ SHINGTON COUNTY ^ OTHER v LOCATION OF INSPECTION: ~~ ~ ~` " ` ~~ NAME OF OWNER: ' CONTRACTOR: DATE INSPECTION REQUESTED: ~~ ~ TIME INSPECTION RE UESTED ~ ~ Q : PERMIT N0: TYPE OF INSPECTION REQUESTED: ^ CONFERENCE ^ STATUS CFIECK BUILDING: ^ FOOTING ^ DECK FOOTING ^ FRAMING ^ DRYWALL FINAL ^ PARTIAL PASSED ^ FA,I~LE/D~ I~ COMMENTS: , ~/ UTILITIES: ^ SEWER TAP ^ SEWER ^ SEPTIC ^ WATER TAP ^ REMOTE ^ WATER SERVICE PASSED FAILED ^ PARTIAL ^ ^ COMMENTS: ELECTRICAL: ^ ROUGH IN ^ FINAL ^ PERMANENT SERVICE ^ TEMPORARY SERVICE ^ PRECONNECT PASSED FAILED ^ PARTIAL ^ ^ COMMENTS: MECHANICAL: ^ ROUGH-IN ^ A/C ^ FURNACE ^ RADIANT HEAT ^ FINAL ^ PARTIAL PASSED FAILED ^ ^ COMMENTS: PLUMBING: ^ GROUNDWORK ^ ROUGH-IN ^ FINAL ^ WATER METER INSTALLED ^ PARTIAL PASSED - FAILED ^ ^ COMMENTS: ^ OCCUPANCY GRANTED ^ CONDITIONAL OCCUPANCY RANTED NOTES/REMARKS: FAXED OPPDIBURT REA TO CONNECT SERVICE: ON BY BUILDING INSPECTION REPORT K~ CITY OF BLAIR ^ W HINGTON COUNTY ^ OTHER LOCATION OF INSPEC,'I'I(1A1: ~~`"r ~~I~L NAME OF OWNER: ~~ ~ ~ e / CONTRACTOR: DATE INSPECTION REQUESTED: // ~ ~ Q IME INSPECTION REQUESTED: ~_ G~ O PERMIT N0: ELECTRICAL: ^ ROUGH IN ^ FINAL ^ PERMANENT SERVICE ^ TEMPORARY SERVICE ^ PRECONNECT PASSED FAILED ^ PARTIAL ^ ^ COMMENTS: MECHANICAL: ^ ROUGH-IN ^ A/C ^ FURNACE ^ RADIANT HEAT ^ FINAL ^ PARTIAL PASSED FAILED ^ ^ COMMENTS: PLUMBING: ^ GROUNDWORK ^ ROUGH-IN ^ FINAL ^ WATER METER INSTALLED ^ PARTIAL PASSED FAILED COMMENTS: ^ ^ ^ OCCUPANCY GRANTED ^ CONDITION L OCC CY,GRANTED NOTES/REMARKS: DATE OF INSPECTION MADE: FAXED OPPD~BURT REA TO CONNECT SERVICE: ON G TIME: ~~ irG~ BY z v CITY OF BLAIR Bi~ILDING INSPEC~ION~i;EPOR~ ^ W-A7SHINGTON COU,N~TY(j ^ OTHER LOCATION OF INSPECTION: ~ ~ r ~ ~ ~""~.0 NAMl OF OWNER: .CONTRACTOR: DATE INSPECTION REQUESTED: v ~ TIME INSPECTION REQUESTED: TYPE OF INSPECTION REQUESTED; BUILDING: ^ FOOTING ^ DECK FOOTING ~' uv ^ CONFERENCE ^ STATUS CHECK ^ DRYWALL ^ FINAL ^ PARTIAL PASS FAILED UTILITIES: ^ SEWER TAP ^ SEWER ^ SEPTIC ^ WATER TAP ^ REMOTE ^ WATER SERVICE PASSED FAILED ^ PARTIAL ^ COMMENTS: ELECTRICAL: ROUGH IN ^ FINAL ^ PERMANENT SERVICE ^ TEMPORARY SERVICE ^ PRECONNECT PASS FAILED ^ PARTIAL ~ ^ COMMENTS: MECHANICAL:. ^ ROUGH-IN ^ A/C ^ FURNACE ^ RADIANT HEAT ^ FINAL ^ PARTIAL PASSED FAILED COMMENTS: PLUMBING: ^ GROUNDWORK ^ ROUGH-IN ^ FINAL ^ WATER METER INSTALLED ^ PARTIAL PASSED FAiI:ED COMMENTS: ^ OCCUPANCY GRANTED ^ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS: FAXED OPPD~BURT REA TO CONNECT SERVICE: ON BY r _~ clr~ o~ ~~n~R .~~ V ~~~ ~~o~~se of °-ud\~ BUILDING PERMIT DEPOSIT AGREEMENT A $200.00 refundable deposit is being collected at the time of your building permit application for all permits $10,000and above. However, the City reserves the right to not refund this deposit if any of the following conditions occur during the construction period: 1) theft of water service by either the plumber, owner or general contractor, 2) all required inspections have not been obtained (this includes drywall prior to taping), 3) occupancy occurs prior to a final inspection, 4) all permits have not been obtained, and 5) the project is completed without a final inspection being done. If any or all of these situations occur during construction, you may forfeit your deposit. I, hereby agree to the above conditions, and understand that should any or all of the above situations occur, the building permit deposit SHALL be forfeited or discounted upon the discretion of the City of Blair, Building and Inspections Department. ~~.~- Contractor/Owner - Contractor/Owner City of Blair ~l ~ ~ ~- Date /_\ _~ 218 South 16th Street • Blair, Nebraska 68008 • 402-426-4191 • Fax 402-426-4195 • E-mail cilyofblair@huntel,net oP ,,, CITY OF BI,~II~ -~ '~r~ o~~se of BUILDING PERMIT SUPPORTING DOCUMENTS This building permit packet includes various items dealing with particular code requirements and/or building permit requirements. It in no way includes ALL particular code items. Also, it is your responsibility to know the 2000 International Building Code requirements that apply to your project. Please understand this packet is only designed and distributed to aid you in your building permit process. A copy of the International Building Code is available for your use at the Blair Public Library. I have read the above disclosure and accept this building permit documentation on my own behalf assuming full responsibility as the owner/contractor for this project. Owner/Occupant City of Blair ~~~~ L~ _ Contractor ~~ ~ ~ z Date ~_ 218 South 16th Street • Blair, Nebraska 68008 • 402-426-4191 • Fax 402-426-4195 • E-mail cityofblair@huntel.net