Loading...
BP12755Blair Building Permit Detail Permit M 12755 Issued: 6/25/2007 Type: Decks - All types Completed: 9/14/2007 Valuation: 0 Location: 763 N 14th St Owner: Tom Roff Permit Fee: 20 Address: 763 N 14th St Issue Fee: 20 Deposit Amt.: Blair, NE 68008 Receipt #: Phone: 5332370 Section: Township: Range: Subdivision: Lot: Block: Repair Existing deck and then expand it with 6x20 addition -Relocating stairs new handrail. Contractors SELF General Contractor Permit # Issued Remarks 8/7/2007 DEM Deck not started. Footings ONLY done. 30 more days given. Inspections Date By 6/26/2007 DEM Deck Footings Pass 8/7/2007 DEM Final Inspection of Project Fail 9/14/2007 DEM Final Inspection of Project Pass qPo 1 oa m CITY OF BLAIR ® MISCELLANEOUS BUILDING PERMIT Date: Approximate Completion Date: i t i Site Plan Attached: Application for: Permit Fee X20/Issuance Fee $20 Fee: $40.00 Sign Erecting, Awnings (Per sign) Hoof ing/Siding/Soffit and/or Eave Repair/Gutters Window/Door Replacement (size change only) Egress Window (floor plan drawing required) Swimming Pools with Fence (plot plan required) Fences (plot plan required) Decks/Handicap Ramps (plot plan required) Satellite Dishes/Radio Antenna/Cell Towers (plot plan required) Gazebos (plot plan required) Miscellaneous Building Permits (items not covered by one of the above) Other Patios/Driveway Permits/Utility Excavation and Curb Grinding Fee $35 Curb Grind Length Utility Excavation Length Lin. Ft.; Width Lin. Ft Type: Water ; Sewer ; Other Amount of Bond Posted: grind0 . 00 PERMIT RENEWAL FEE: This fee is based on the amount of the original permit fee and is charged when work is not completed within two years and the permit expires. Renewals will gni Y be allowed with the stipulation that all exterior site work and outside finish work is completed and interior life - safety issues have been properly address. Permit renewals are for one (1) year, with a maximum of two (2) renewals for a maximum permit span of four (4) years. Original permit fee of $0-$50,000 $100.00 $ Original permit fee of $50,000 - $100,000 $150.00 $ Original permit fee of $100,000 - $500,000 $250.00 $ Original permJit fepro'�500,000 or more $400.00 ` 4,$. Issuance Fee: $ 20.00 Total Renewal Remit Fee = Permit Fee/issuance Fee Additional Description of projectnecessary: PROJECT INFORMATION: Job Address: Legal Description (if applicable) Owner: Q►`h c Address: k (TV- Phone#: 3 "7 Contractor: C3 � Phone #: Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within two (2) years of date of issue. r x Signature of Owner/C ract r Date For Office Use Only WHEN PROPERLY VALIDATED (BELOW) THIS IS YOUR PERMIT Date Permit Paid: Receipt Approved by: '0 - Rjkj� LAt" CITY F . .. . . . .. rise o 1 --111 IRA] WIMU =1 V M I IM This building permit packet includes various items dealing with particular code requirements and/or building permit requirements. It in no way includes ALL particular code items. Also, it is your responsibility to know the 2006 International Building Code requirements that apply to your project. Please understand this packet is only designed and distributed to aid you in your building permit process. A copy of the International Building Code is available for your use at the Blair Public Library. AIATJ an XQ M;11 If! L I i'll up a 14 110 tzag 01#1 Im 101111 &-M I 21-7gova w7d Irm-ti it 14 v t'" 1*1 sit] E41 Owner/Occupant '7 6e, City of Blair 6'_ � �'Z, S -16 7 Date 218 South 16th Street - Blair, Nebraska 68008 ® 402-426-4191 ® Fax 402-426-4195 - E-mail cityofblalr@cl,blalr.ne.us CITY OF BLAIR Application for Building Permit C� PLOT PLAN Address /V q Date 7 Legal Description: Lot Block Addition Please show all measurements of existing and contemplated structures, also show distances between structures, etc., and property lines. Is this a corner lot? NJ trope - -Center Lineof- - - Applicant Line Street - I Indicate -North �� ��. �r� ❑ CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION: NAME OF OWNER' CONTRACTOR DATE INSPECTION REQUESTED' f j TIME INSPECTION REQUESTED- PERMIT NO• TYPE OF INSPECTION REQUESTED ❑ CONFERENCE ❑,STATITS CHECI£ _ BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL PASSED FAILED COMMENTS: ❑ ❑ UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ElWATERTAP ❑ REMOTE ❑ WATER SERVICE � �PASSED �FAILED ❑ PARTIAL ❑ ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT� El PARTIAL PASSED FAILED COMMENTS: ❑ ❑ MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL r PASSED FAILED COMMENTS: ❑ ❑ PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL ~ w /J PASSED FAILED PRESSURE TEST ❑ ❑ COMMENTS: ❑ OCCUPANCY GRANTEDCONDITI�O�NAL. ❑ CONDITIONAL UPANCY G TED Y ,t NOTES/REMARKS- �/ 1 w BUILDING INSPECTION REPORT -121-CITY OFBLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION NAME OF OWNER. CONTRACTOR - V DATE INSPECTION REQUESTED �-- PERMIT N TIME INSPECTION REQUESTED: 0 TYPE OF INSPECTION REQUESTED: FAILED ❑ CONFERENCE El STATUS CHECK BUILDING: F-1 FOOTING Fl DECK FOOTING ❑ FRAMING [:1 DRYWALL '9 --`FINAL E:l PARTIAL PAS FAILED El COMMENTS: UTILITIES: -1 SEWER TAP Fl SEWER F -1 SEPTIC Fl WATER TAP El REMOTE El WATER SERVICE PASSED FAILED ❑ PARTIAL F] F-1 ELECTRICAL: ❑ ROUGH IN ❑ PARTIAL COMMENTS: MECHANICAL: F-1 COMMENTS: PLUMBING: F-1 El COMMENTS: FINAL F] PERMANENT SERVICE 0 TEMPORARY SERVICE FI PRECONNECT PASSED FAILED F-1 ❑ F-1 A/C F-1 FURNACE El RADIANT HEAT El FINAL 0 PARTIAL )RK F-1 ROUGH -IN [:1 FINAL El WATER METER INSTALLED D PARTIAL TEST ❑ OCCUPANCY GRANTED F1 CONDITIONAL OCCUPANCY GRANTED ,-N NOTES/REMARKS- , A INSPJ�� DATE OF INSPECTION MADE: PASSED FAILED F-1 F PASSED FAILED 1:1 ❑ 11 09/17J,2007 � 09/17/2007 I