Detail Report
Tue Sep 5, 2023 4:05 PM PERMITS MASTER Page 1
Permit # RN-2021-00083 Prop. Location S 14TH AVE 1044
Contractor ORCHARD VALLEY INC Status Complete Total Fees 1,557.00 Finished SF 1265
Contact ORCHARD VALLEY INC Application Date 4/12/2021 Paid Amount 1,557.00 Finish Bsmnt SF 0
Applicant ORCHARD VALLEY INC Appl Expire Date 10/16/2021 Balance Due Unfinish Bmt SF 1265
Owner ORCHARD VALLEY INC Approval Date 4/19/2021 Valuation 171940.00 Garage SF 755
Permit Type RES NEW CONSTRUCTION Issued Date 5/05/2021 Cost of Work
Description1 Ranch style new residential Completed Date 9/05/2023 Insurance Amt
Description2 house w/2-bdrms 2-bth 3-cr grg Denial/With Date Number of Bldgs
Subdivision NORTHERN VIEW Expire Date 5/05/2023 Number of Units
Type of Use NEW CONSTRUCTION Days to Correct Building Area
Zone RES MULTI-FAM LOW DENSITY Lot Number 27 Receipt Number 52,146
Sub Type RESIDENTIAL Block Number
------------------------------------------------------------------------------------------------------------------------------------
Quantity Description Fees Due
------------------------------------------------------------------------------------------------------------------------------------
1 PERMIT ISSUANCE FEE 25.00
1 ESTIMATED VALUATION FEE 1,032.00
1 DEPOSIT 500.00
------------------------------------------------------------------------------------------------------------------------------------
Inspection Inspector Inspect Dt Time Pass/Fail Violation Code
------------------------------------------------------------------------------------------------------------------------------------
*PLAN REVIEW ETHAN ROE 4/14/2021 11:12 AM Pass
*ZONING REVIEW JEFF BEIERMANN 4/12/2021 Pass
_BUILDING PLANS SHELLY JONES 4/12/2021 Pass
_SITE PLAN SHELLY JONES 4/12/2021 Pass
_REScheck/COMcheck SHELLY JONES 4/12/2021 Pass
_STATE ELECTRICAL PERMIT SHELLY JONES 5/05/2022 Pass
FOOTING ETHAN ROE 5/17/2021 2:00 PM Pass
FOUNDATION WALL ETHAN ROE 5/26/2021 1:00 PM Pass
STATUS CHECK ETHAN ROE 8/17/2023 12:39 PM Pass
METER WIRE SHELLY JONES 9/14/2021 Pass
SIDEWALK ETHAN ROE 8/17/2023 12:39 PM Pass
FINAL ETHAN ROE 8/17/2023 12:39 PM Pass
FRAMING ETHAN ROE 3/17/2022 2:30 PM Pass
PEIQRYR207.01.21 City of Blair NE OPER:SJ