ResCheckCGenerated
�J( Compliance Certificate
Project Blair Caskey 2
Energy Code:
2018 IECC
Location:
Blair, Nebraska
Construction Type:
Single-family
Project Type:
New Construction
Conditioned Floor Area:
1,200 ft2
Glazing Area
8%
Climate Zone:
5 (6506 HDD)
Permit Date:
Permit Number:
Construction Site:
Owner/Agent: Designer/Contractor:
Compliance: 21.7% Better Than Code Maximum UA: 207 Your UA: 162
The % Better or Worse Than Code Index reflects how close to compliance the house Is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
Slab -on -grade tradeoffs are no longer considered in the UA or performance compliance path in ttEScheck. Each slab -on -grade
assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements,
Envelope Assemblies
Ceiling: Raised or Energy Truss 1,200 60.0 55.0 0.009 0.026 11 31
Wall: Structural Insulated Panels 1,260 27.0 0.040 0.060 45 67
Door: Solid Door (under 50%,glazing) 54 0,350 0.300 19 16
Window: Vinyl Frame 83 0.480 0,300 40 25
Basement Wall: Solid Concrete or Masonry
Wall height: 9.0' 1,260 15.0 14.0 0.030 0.050 37 62
Depth below grade: 8.0'
Insulation depth: 9.0'
Window: Vinyl Frame 20 0,480 0.300 10 6
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application, The proposed building has been designed to meet the 2018 IECC requirements in
REScheck Version RE5theckWeb and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
r,t /
Name - Title Signature Date
Project Title: Blair Caskey 2 Report date: 08/07/23
Data filename: Page 1 of 9
SoftwareREScheck Version
Inspection Checklist
Energy Code: 2018 IECC
Requirements: 0,0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Additional Comments/Assumptions:
11 High Impact (Tier 1) 2 Medium Impact (Tier 2) _ 3Low Impact (Tier 3)
Project Title: Blair Caskey 2 Report date: 08/07/23
Data filename: Page 2 of 9
Section
#
_ �A��
Foundation inspection
F�ians Verified
Value
Field Verified
Value
0�mplies2
Oomments/Assumptions
& Req.11D
402.1.1
Conditioned basement wall R-
R- ❑Complies
See the Envelope Assemblies
[F04]1
insulation R-value. Where interiorR-
R- ❑Does Not
table for values,
j insulation is used, verification
T❑Not Observable
may need to occur during
❑Not Applicable
Insulation Inspection, Not
required in warm -humid locations
in Climate Zone 3.
_
303.2
Conditioned basement wall
❑Complies
[F05]1
insulation installed per
❑Does Not
manufacturer's instructions,
❑Not Observable
❑Not Applicable
402.2.9
;Conditioned basement wall ft
�ft ❑Complies
See the Envelope Assemblies
[F06]1
insulation depth of burial or
❑Does Not
table for values.
distance from top of wall,
❑Not Observable
❑Not Applicable
303,2.1
A protective covering is installed
❑Complies
[FO11]2
to protect exposed exterior
❑Does Not
insulation and extends a
[:]Not Observable
,minimum of 6 in. below grade.
❑Not Applicable
4019
;Snow- and ice -melting system
❑Complies
[FO12]2
controls installed.
❑Does Not
.
❑Not Observable
'❑Not Applicable
Additional Comments/Assumptions:
1 lHigh Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Blair Caskey 2 Report date: 08/07/23
Data filename; Page 3 of 9
Plans V,01 �ied
9 / Rough -in Inspetion]
Field Verified
V
C mplies?
Comments/Assumptions
402.3.4
E]Does Not table for values,
FINot Observable
E]Not Applicable
402.1.1,
Glazing LI-factor (area -weighted U- U_
ElComplies See the Envelope Assemblies
402.3.1,
average),
E]Does Not table for values.
[FR411
are determined in accordance
F]Does Not
'with the NFRC test procedure or
E]Not Observable
;taken from the default table,
E]Not Applicable
402.4.1.1
Air barrier and thermal barrier
l7lComplies
[FR23]1
'Installed per manufacturer's
E]Does Not
[:]Not Observable
E]Not Applicable
402.4.3
Fenestration that is not site built
OComplies
[FR2011
'is listed and labeled as meeting
F]Does Not
F]Not Observable
or has infiltration rates per NFRC
'E]Not Applicable
400 that do not exceed code
402.4.5
IC -rated recessed lighting fixtures
1771complies
[FR16]2
:sealed at housing/interior finish
FIDoes Not
and labeled to indicate :52.0 cfm
E]Not Observable
'leakage at 75 Pa,
E]Not Applicable
403.3.1
Supply and return ducts in attics
ElComplies
E]Not Observable
R-6 where < 3 inches. Supply and
E]Not Applicable
return ducts in other portions of
the building insulated >= R-6 for
403.3.2
!Ducts, air handlers and filter
ElComplies
FR1311
boxes are sealed with
E]Does Not
�joints/seams compliant with
E]Not Observable
'.International Mechanical Code or
nNot Applicable
International Residential Code, as
403.3.5
Building cavities are not used as
ElComplies
[FR15]3
ducts or plenums.
F]Does Not
E]Not Observable
E]Not Applicable
1 2 1 Medium Impact (Tier 3JLow Impact (Tier 3"
Project Title: Blair Caskey2 Report date: 08/07/23
Datafi|mname: Page 4nf 9
#
Framing / Rough -in inspection
plans Verified
^ Fieid Verified
Comments/Assumptions
Vale
ValueComplies?
403.3.7
!Ducts declared to be within the
❑Complies
[FR28]3
'conditioned space are either 1)
❑Does Not
:completely within the continuous
❑Not Observable
air barrier and within the building
❑Not Applicable
thermal envelope, 2) buried
within ceiling insulation in
accordance with Section
R403,3,6 and the air handler is
located completely within the
continuous air barrier and within
;the building thermal envelope
land the duct leakage is <= 1.5
t cfm / 100 square feet of
;conditioned floor area served by
the duct system, or 3) the ceiling
insulation R-value installed
against and above the insulated
duct >= to the proposed ceiling
insulation R-value, less the R-
value of the insulation on the
403.4
HVAC piping conveying fluids R- R-
❑Complies
[FR17]2
above 105 °F or chilled fluids
❑Does Not
below 55 °F are insulated to >_R-
❑Not Observable
3
❑Not Applicable
403.41
;Protection of insulation on HVAC
❑Complies
[FR24]1
j piping.
+❑Does Not
❑Not Observable
❑Not Applicable
4015.3
Hot water pipes are insulated to R- R-
❑Complies
[FR18]2
>_R-3.
❑Does Not
�
❑Not Observable
❑Not Applicable
403.6
;Automatic or gravity dampers are u'❑Complies
[FR19]2
'Installed on all outdoor air
❑Does Not
intakes and exhausts.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) I
Project Title; Blair Caskey 2 Report date; 08/07/23
Data filename: Page 5 of 9
#
Insulation Inspection
Pians Vrl�ied
Flo
Complies?
Comm ents/Assu mptions
303.1
:All installed insulation is labeled
nComplies
[IN13]2
:or the installed R-values
E]Does Not
EINot Observable
EINot Applicable
4021.1,
�Wall insulation R-value, If this is a
R-
R-
"ElComplies See the Envelope Assemblies
402.2.5,
mass wall with at least 1/2 of the
F-1 Wood
Wood
OlDoes Not table for values,
402.2.6
wall insulation on the wall
[IN311
:exterior, the exterior insulation
:requirement applies (FR10).
'
E] Steel
E] Steel
E]Not Applicable
303.2
Wall insulation is installed per
ElComplies
[IN411
manufacturer's instructions,
E]Does Not
E]Not Observable
E]Not Applicable
AddHdamaUCmmmmmamts/Asamnmpdmms:
1 1 High Impact (Tier 1) F2 Medium Impact (Tier 2)
Project Title: Blair Caskey 2 Report date: 08/07/23
Data filename: Page bof 9
Section
#
Final Inspection Provisions
Mans Verified
� Value
Field Verified
complies?
Comments/Assumptions
& Req.I®
L
-
402.1.1,
Ceiling insulation R-value.
-
R- R-
-
❑Complies See the Envelope Assemblies
402.2.1,
❑ Wood ❑ Wood
❑Does Not table for values,
402,2,2,
❑ Steel ❑ Steel
❑Not Observable
402.2.6
[Fill'
❑ Not Applicable
303.1.1.1,
(Ceiling insulation installed per
T
❑Complies
303.2
manufacturer's instructions.
❑Does Not
[F1211
Blown insulation marked every
❑Not Observable
300 ft2.
❑Not Applicable
402.2.3
'Vented attics with air permeable
❑Complies
[F122]2
I insulation include baffle adjacent
❑Does Not
'to soffit and eave vents that
❑Not Observable
extends over insulation,
❑Not Applicable
402.2.4
'Attic access hatch and door
R- R
❑Complies
[F1311
Jnsulation >_R-value of the
❑Does Not
adjacent assembly.
❑Not Observable
❑Not Applicable
402.4.1.2
',Blower door test @ 50 Pa. <=5
ACH 50 = ACH 50 =
❑Complies
[F11711
; ach in Climate Zones 1-2, and
❑Does Not
<=3 ach in Climate Zones 3-8.
❑Not Observable
❑Not Applicable
403.3.3
'Ducts are pressure tested to
cfm/100 cfm/100
❑Complies
[F127]1
� determine air leakage with
ft2 ft2
❑Does Not
either: Rough -in test: Total
❑Not Observable
,leakage measured with a
pressure differential of 0.1 inch
❑Not Applicable
w.g, across the system including
;the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test: Total
;leakage measured with a
pressure differential of 0,1 inch
w.g, across the entire system
including the manufacturer's air
handler enclosure.
403.3.4
Duct tightness test result of <=4
cfm/100 cfm/100
❑Complies
[F1411
!cfm/100 ft2 across the system or
ft2 ft2
❑Does Not
<=3 cfm/100 ft2 without air
❑Not Observable
handler @ 25 Pa. For rough -in
❑Not Applicable
:tests, verification may need to
occur during Framing Inspection.
403,3,2,1
,Air handler leakage designated
❑Complies
[F124]1
by manufacturer at <=2% of
❑Does Not
design air flow.
❑Not Observable
❑Not Applicable
403.1.1
:Programmable thermostats
❑Complies
[F19]2
installed for control of primary
❑Does Not
heating and cooling systems and
❑Not Observable
initially set by manufacturer to
❑Not Applicable
code specifications.
403.1.2
Heat pump thermostat installed❑Complies
[F110]2
on heat pumps,
❑Does Not
❑Not Observable
❑Not Applicable
403.5.1
Circulating service hot water
❑Complies
[F111]2
systems have automatic or
'❑Does Not
'accessible manual controls,
❑Not Observable
❑Not Applicable
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Blair Caskey 2 Report date: 08/07/23
Data filename; Page 7 of 9
Section
#
Final Inspection Provisions
Plans Verified
Value
Feld Verified
Value
Corraplies7
Comments/Assumptions
& Req.ID
403,6.1
All mechanical ventilation system
r ❑Complies
[FI25]2 ;fans
not part of tested and listed
❑Does Not
HVAC equipment meet efficacy
❑Not Observable
,and airflow limits per Table
❑Not Applicable
R403.6.1,
403,2
Hot water boilers supplying heat
❑Complies
[F126]2
through one- or two -pipe heating
❑Does Not
systems have outdoor setback
❑Not Observable
control to lower boiler water
❑Not Applicable
temperature based on outdoor
temperature.
403.5.1.1
: Heated water circulation systems
❑Complies
[F12812
' have a circulation pump. The
❑Does Not
system return pipe is a dedicated
❑Not Observable
return pipe or a cold water supply
[]Not Applicable
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set -point temperature and
no demand for hot water exists.
403.5.1.2 )' Electric heat trace systems
❑Complies
[F129]2
comply with IEEE 515.1 or UL
❑Does Not
515. Controls automatically
❑Not Observable
adjust the energy input to the
heat tracing to maintain the
❑Not Applicable
desired water temperature in the
piping.
403.5.2
Demand recirculation water
❑Complies
[F13012
systems have controls that
❑Does Not
manage operation of the pump
❑Not Observable
and limit the temperature of the
❑Not Applicable
water entering the cold water
piping to <= 104°F.
_
403.5.4 .`
Drain water heat recovery units
❑Complies
[F1311*2
tested in accordance with CSA
❑Does Not
B55,1. Potable water -side
❑Not Observable
pressure loss of drain water heat
❑Not Applicable
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers,
404.1
90% or more of permanent
❑Complies
[F1611
fixtures have high efficacy lamps.
❑Does Not
❑Not Observable
❑Not Applicable
404.1.1
Fuel gas lighting systems have
❑Complies
[F123)3
no continuous pilot light,
❑Does Not
❑Not Observable
❑Not Applicable
401.3
'Compliance certificate posted.
❑Complies
[FI7]2
❑Does Not
❑Not Observable
❑Not Applicable
1 High Impact (Tier 1) 1-2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Blair Caskey 2 Report date: 08/07/23
Data filename: Page 8 of 9
Secian Mans Verified Freld Verified
# !Final Inspection Provisions Value Valur Complies? Camments/Asstamptians
& Req.ID
303,3 Manufacturer manuals for ❑Complies
[FI18]3 mechanical and water heating ❑Does Not
systems have been provided.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact (Tier 1) 2 Medium Impact (Tier 2) 1 3 Low Impact (Tier 3)
Project Title: Blair Caskey 2 Report date: 08/07/23
Data filename; Page 9 of 9
2018 IECC Energy
L�(j Effidency Certificate
Above -Grade Wall 27.00
Below -Grade Wall 29.00
Floor 0.00
Ceiling / Roof 115.00
Ductwork (unconditioned spaces):
Window 0.48
Door 0.35
Heating System:
Cooling System:
Water Heater:
Name: Date: ,r f
Comments