Loading...
BP7139Application Date: Blair, Nebraska 68008 ~' ~ k (402) 426-4191 Permit =" Issue Date: ~°~ ~"" ~ Permit Fee: $ JOB ADDRESS LEGAL 1 LOT NO. ' BLK. TRACT ^ SEE ATTACHED SHEET ' DESCR. ~ 2. OWNER MAI ADDRESS Zlp PHONE 3 CONTRACT MAILADDRESS~ PHONE /1~ 9 LICENSENO}O/ USE OF BUILDING 4. 5. Class of Work: ^ NEW ^ ADDITION ^ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: .. ~ 7, Sq. Footage of Structure (Including B9s9m9nt and GBrag9): 8. Change of Use From: Change of Use To: g, Valuation of Work: $ ~' e~ 10. Floodplain: Floodway Yes ^ No ^ Dev. Permit F i Y ^ N Elev. Cert. r nge es o ^ BFE 11. Current Zoning: Site Plan Attached ^ Complet ins Attaph~d® Approximate Completion Date / ~~' 12. State Fire Marshall Required: Yes ^ No^ Inspections Required and Fees 13. Special Use Permit Required: Yes ^ No ^ utilities Sewer Tap Water Tap 14. Variance Required: Yes ® No ® sewer Water Service 15. Minimum Setbacks: Front Side Rear septic Remote 16. Sidewalk Required: Yes ^ No ^ Waiver Approved Building PLICATION ACCEPZED BY PLANS CHECKED BY ~-A ROVE F N - Y Footings Drywall ~ (before finish) NOTICE Final ~" ~/ Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I acknowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further Electrical agree chat construction covered by this permit application shall not be commenced until I have receivedacopyofthisapplicationformsignedbytheBuildinglnspectorandstamped Rough-in Permanent Service 'APPROVED'. Iherebyagreetoperformtheproposedworkinaccordancewiththespecificationssetforth Final Tem ora Service p ry above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days, is not completed within 2 years of the date of issuance, or if work is abandoned for six (8) Mechanical o the o nger, wh' ever is a I' st. v,° -- Rough-in ABC SIGNATURE OF NERfCONTRACTORORAUTHORIZEDAGENT DATE Final Plumbing Ground Work SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Rough-in Final c WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approved By: Rev. 09195 POUNDS PRTG: Blair, NE 5 t