Loading...
BP8225The City of Blair Building Permit Detail Permit #: 8225 Issued: 07/22/1998 Completed: 09/30/1998 Owner: Nicole Schumacher Address: 1466 Park Street Blair, NE 68008 Phone: 402-427-7530 Type: Roofing permits -All types Valuation: $500.00 Permit Fee: $15.00 Issue Fee: Deposit Amt.: Receipt #: Section: Township: Range: Subdivision: Lot: Block: Re-roof -tear off 1 layer asphalt & 1 layer wood shake -laying new asphalt shingles. Inspections Date By 09/30/1998 KAR Remarks Final Inspection of Project Pass Contractors SELF General Contractor Permit # Issued • ~UIL®ING PERMIT APPLICATION ~ Jurisdiction of City of Blair, Nebraska Permit Fee: Issuance Fee: ~~ Deposit Receipt #: 218 South 16th Street g 2 2 5 Blair, Nebraska 68008 (402) 426-4191 • Fax (402) 426-4195 Permit S I~} I A /-~ Q Application Date:_=~~~-'1~ ~ i ~ ~~~ Issue Date: ~2- ~( ~1 C~ JOB ADDRESS ~ ~ ~ r W r IL ~ - LEGAL 1. DESCR. LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET. OWNER 2. • ~ ~ ~tv~AIL A~ DDR~ S ff~~ 1-C1- ZIP PHONE_ ~~ CONTRACTOR ~ ~ 3. MAIL ADDRESS ZIP PHONE 4. Class of Work: O NEW O ADDITION O REMODEL 5. Describe Work: ~ _ yip ~~ ~ - O Finished Basement O Unfinished Basement ~. Ar (r - T 6. TOtal Sq. Footage (Incluaing BasemeBt ana Garage): Total Finished Area: 7. Valuation of Work: $ Q ~ ~ Floodway O Yes O No 8. Floodplain: Fringe O Yes O No Dev. Permil BFE Elev. Cert. 9. Current Zoning: 10. State Fire Marshall Required: O Yes O No 11. Special Use Permit Required: O Yes O No 12. Variance Required: O Yes O No 13. Minimum Setbacks: Front 14. Sidewalk Required: O Yes Side Rear O No Waiver Approved . NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septicsystems. Bymysignature below, I acknowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector. hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within 2 years of date of issue. o~ S~v Q~ 7-~~ ~~.~ SI NATURE OF OWNER/CONTRACTOR DATE Comment: ~1~~-Se~ C ~ ~ ~c~. O Site Plan Attached p ~ Cgq~ ete Plans Attached Approximate Completion Date (~" ~-f Inspections Required and Fees Utilities Sewer Water Service Septic Remote Stop Box Card Buildina Footings Drywall (b re-fi 'sh) Framing Final Electrical Rough-in Fixtures Final Permanent Service Temporary Service Mechanical Rough-in A\C Final Plumbina - Ground Work Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Approved By; „/f _ POUNDS PRTG: Bleir, NE Rev. 8186 i= -- -- -- -- - -- - -- . - - -- - -- . - . _ -- _ -..~ - ~ BUILDING INSPECTION REPORT I 'CITY OF BLAIR ``r ~q ^ WASHINGTON COUNTY ,~^ OTHER 4 ~ ~ LOCATION OF INSPECTTION: ~ 1.~1J ~~ ~ vL-~ U~ ~~ - ~ { JC.~~~..~..Y'-{'~f~ ~~n ~ ~~~} ` ~ NAME OF OWNER: ~ ~~... jL.~' l CO . ~ NTRACTOR: ~r~ DATE INSPEC ION L~ ~ ~~ T REQUESTED: ~ i pERMITNO: 1 TIME INSPECTION REQUESTED: ~ ~` ~ ~~~ I TYPE OF INSPECTION REQUESTED: BUILDING: .~ 1 ^ FO L OTING ^ FRAMING ^ DRYWALL {FINA UTILITIES: ^.SEWER TAP ^ SEWER ^ SEPTIC ^ WATER TAP ^ REMOTE ^ WATER SERVICE ELECTRICAL: ^ ROUGH IN ^ FIXTURES ^ FINAL ^ MOTORS - ^ PERMANINT SERVICE ^ TEMPORARY SERVICE MECHANICAL: ^ ROUGH-IN ^ A/C ^ FINAL PLUMBING: 1 ^ GROUNDWORK ^ ROUGH-IN ^ FINAL i RESULTS OF THE INSPECTION:.. SSED ~s~xoTSS> ^.FAILED cs~xoTES> NOTES/REMARKS: I _ .. ~ INSPECTOR: t ~ DATE OF INSPECTION MADE: ~ MME; ~~ ' CALLED OPPD\ TO CONNECT SERVICE: ^ YES ^ NO WANT OFFICE STAFF TO CALL OPPD\ ^ 'YES ^ NO BLR 1