Loading...
BP6947~UIL®ING PERI~!lT~PLi~ATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 ~ ~ 4 7 (402) 426-4191 Permit ~, ~-) Application Date: >~ 12" I~J Issue Date: ~~ (2 ~ Permit Fee: $ J~.~ JOB ADDRESS ~ I ~ ~\ I ~~ r~ ~~ V LEGAL 1 ' DESCR. LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET 2. OWNER •~~`t A, _~~ (,(~ MAC I~~RESS T-r \ ZIP PHONE MAILADDRESS CONTRAC R s. ~ ~ Ca~is~r ~ ~~ rJ ~ ~ ~ ~~ ~~ PHO ~-~ ~~~~~ LICENSE NO. ~~a~ ~~ ~ ~~~~ 4 USE OF BUILDING 5. Class of Work: ^ NEW ^ ADDITION ^ALTERATION REPAIR R EMOVE ^ MOVE ^ r 6. Describe Work: ~ r_~-t-c ~1 c -- --~ ~ I(~ ~ ) ~ (~(? t. P ~ ~ ~ ~ ~ (~t1"~2 l.t~ ~=~7'~ 7. Sq. Footage Of StrUC1Ure (Including Basement and Garage): /~~ ~1~~~~ t. Change of Use To: 8, Change of Use From: g, Valuation of Work: $ 3~ (~~, Q ~ 10. FIOOdplaln: Floodway Yes ^ No ^ Dev. Permit Fringe Yes^ No ^ BFE Elev. Cert. 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes ^ No ^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes ^ No ^ Waiver Approved _ BY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY Site Plan Attached ^ Complete Plans Attached ^ Approximate Completion Date ~~' /(r-~- ~~ Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Building Footings Drywall (before finish) Framing Final lU~~ ~~ ~~' D NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I acknowledge chat payment of the building permit application fee does notconstitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspectorand stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days, is not completed within 2 years of the date of issuance, or if work is abandoned for six (6) months or longer, whichever is earliest. SIGNATURE OF OWNERICONTRACTOR OR AUTHORIZED AGENT DATE Electrical Rough-In Permanent Service Final Temporary Service Mechanical Rough-in ABC _ Final Plumbing Ground Work SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS YOUR PERMIT Comment: Approved By: " -"~ /,~,, ~i~~ POUNDS PRTG: Blelr, NE ~ ~ Rey Oflr95