ResCheckfZGenerated by REScheck-Web Software
Compliance Certificate
Project Blair Lot 34 Transformation Hill
Energy Code:
Location:
Construction Type
Project Type:
Climate Zone:
Permit Date:
Permit Number:
Construction Site:
Lot 34
Transformation Hill
Blair, NE 68008
2012 IECC
Blair, Nebraska
Single-family
Addition
5 (6506 HDD)
Owner/Agent:
Designer/Contractor:
Compliance: 0.2% Better Than Code Maximum UA: 653 Your UA: 652
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
Slab -on -grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab -on -grade
assembly in the specified climate zone must meet the minimum energy code insulation R -value and depth requirements.
Envelope Assemblies
Ceiling: Flat Ceiling or Scissor Truss 1,746 60.0
Wall: Wood Frame, 16" o,c. 7,500 45.0
Door: Glass Door (over 50% glazing) 75
Window 1: Vinyl Frame 32
Window: Vinyl Frame 200
Basement: Solid Concrete or Masonry
Wall height: 9.0' 2,000 45.0
Depth below grade: 7.0'
Insulation depth: 0.0'
Compliance Statement: The proposed building design described here is consi!
calculations submitted with the permit application. The proposed building h fr
REScheck Version : REScheck-Web and to/comply with the mandatory re Irer
ame Title CSignature
Project Title: Blair Lot 34 Transformation Hill
Data filename:
60.0 0.010
0.026
17
45
45.0 0.013
0.057
94
410
0.020
0.320
2
24
0.025
0.320
1
10
0.020
0.320
4
64
45,0 0,267 0.050 534 100
with the building plans, specifications, and other
clsi d to meet the 2012 IECC requirements in
d in the REScheck Inspection Ch cklist.
Z�
ate
Report date: 11/29/21
Page 1 of 7
fXREScheck Software Version : REScheck-Web
Inspection Checklist
Energy Code: 2012 IECC
Requirements: 3.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
& Req.ID
Pre-Inspection/Plan Review
Plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
103.11
Construction drawings and
❑Complies Requirement will be met.
103.2
documentation demonstrate
;❑Does Not
[PR1]1
energy code compliance for the
❑Not Observable
14
building envelope.
❑Not Applicable
103.1,
;Construction drawings and
;❑Complies
103.2,
documentation demonstrate
UDoes Not
403.7
;energy code compliance for
❑Not Observable
[PR3]1
lighting and mechanical systems.
;Systems serving multiple
❑Not Applicable
;dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is
Heating:
Heating
403.6 sized per ACCA Manual S based
Btu/hr
Btu/hr_
[PR2]z ,on loads calculated per ACCA
Cooling:
Cooling
: Manual J or other methods
Btu/hr
Btu/hr
:approved by the code official.
r
—
Additional Comments/Assumptions:
❑Complies
❑Does Not
❑Not Observable
❑Not Applicable
111 High Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Blair Lot 34 Transformation Hill
Data filename:
Report date: 11/29/21
Page 2 of 7
Section Plans Verified Field Verified
# Foundation Inspection Value Value
& Req.ID
402.1.1
Conditioned basement wall R-
[FO4]1
[
-insulation R -value. Where interior R_
,I
;insulation is used, verification
may need to occur during
303.2.1
;Insulation Inspection. Not
[FO11]2
:required in warm -humid locations
:in Climate Zone 3.
303.2 Conditioned basement wall
[FO5]1 insulation installed per
1911 manufacturer's instructions.
Additional Comments/Assumptions:
ft
R-
R -
ft
Complies? Comments/Assumptions
❑Complies See the Envelope Assemblies
❑Does Not table for values.
❑Not Observable
❑Not Applicable
,E]Complies
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies See the Envelope Assemblies
❑Does Not table for values.
❑Not Observable
'❑Not Applicable
❑Complies
❑Does Not
i
❑Not Observable
'❑Not Applicable
❑Complies
❑Does Not
�❑Not Observable
E]Not Applicable
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Blair Lot 34 Transformation Hill Report date: 11/29/21
Data filename: Page 3 of 7
402.2.8
Conditioned basement wall
[FO6]1
insulation depth of burial or
;distance from top of wall.
303.2.1
A protective covering is installed
[FO11]2
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
403.8
Snow- and ice -melting system
I[FO12]2
controls installed.
Additional Comments/Assumptions:
ft
R-
R -
ft
Complies? Comments/Assumptions
❑Complies See the Envelope Assemblies
❑Does Not table for values.
❑Not Observable
❑Not Applicable
,E]Complies
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies See the Envelope Assemblies
❑Does Not table for values.
❑Not Observable
'❑Not Applicable
❑Complies
❑Does Not
i
❑Not Observable
'❑Not Applicable
❑Complies
❑Does Not
�❑Not Observable
E]Not Applicable
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Blair Lot 34 Transformation Hill Report date: 11/29/21
Data filename: Page 3 of 7
Section
#
Framing / Rough -In Inspection
Plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
& Req.ID
402.1.1,
Glazing U -factor (area -weighted
U- U-
❑Complies See the Envelope Assemblies
402.3.1,
average).
;❑Does Not table for values.
402.3.3,
402.3.6,
:❑Not Observable
402.5
❑Not Applicable
[FR2]1
303.1.3
U -factors of fenestration products
❑Complies
[FR4]1
:are determined in accordance
❑Does Not
with the NFRC test procedure or
taken from the default table.
❑Not Observable
❑Not Applicable
402.4.1.1
;Air barrier and thermal barrier
❑Complies
[FR23]1
installed per manufacturer's
❑Does Not
instructions.
❑Not Observable
❑Not Applicable
402.4.3
Fenestration that is not site built
❑Complies
[FR20]1
:is listed and labeled as meeting
❑Does Not 1
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
❑Not Observable
;400 that do not exceed code
❑Not Applicable
limits.
402.4.4
IC rated recessed lighting fixtures'
❑Complies
[FR16]2
sealed at housing/interior finish
❑Does Not
;and labeled to indicate <_2.0 cfm
❑Not Observable
leakage at 75 Pa.
❑Not Applicable
403.2.1
Supply ducts in attics are
R- R-
;❑Complies
[FR12]1
:insulated to >_R-8. All other ducts
R- R-
;❑Does Not
0
in unconditioned spaces or
:outside the building envelope are
:❑Not Observable
insulated to >_R-6.
❑Not Applicable
403.2.2
,All joints and seams of air ducts,
❑Complies
[FR13]1
air handlers, and filter boxes are
❑Does Not
sealed.
❑Not Observable
❑Not Applicable
403.2.3
Building cavities are not used as
❑Complies
[FR15]3
ducts or plenums.
❑Does Not
+
❑Not Observable
❑Not Applicable
403.3
HVAC piping conveying fluids
R- R-
;❑Complies
[FR17]2
above 105 9F or chilled fluids
;❑Does Not
below 55 9F are insulated to >_R-
:❑Not Observable
3
❑Not Applicable
403.3.1
Protection of insulationon HVAC
Li Complies
[FR24]1
piping.
El Not
El Not Observable
El Not Applicable
403.4.2
Hot water pipes are insulated to
R- R-
;❑Complies
[FR18]2
>_R-3.
;❑Does Not
❑Not Observable
❑Not Applicable
403.5
Automatic or gravity dampers are
❑Complies
[FR19]z
installed on all outdoor air
❑Does Not
intakes and exhausts.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Blair Lot 34 Transformation Hill Report date: 11/29/21
Data filename: Page 4 of 7
Section
#
& Req.ID
Insulation Inspection
Plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
303.1
All installed insulation is labeled
❑Complies
[IN13]2
or the installed R -values
❑Does Not
provided.
IE]Not
❑Not Observable
Applicable ;
402.1.1,
Wall insulation R -value. If this is a `
R-
R-
;❑Complies ;See the Envelope Assemblies
402.2.5,
i mass wall with at least 1/2 of the
❑ Wood
; ❑ Wood
e❑Does Not ; table for values.
402.2.6
;wall insulation on the wall
❑ Mass
; ❑ Mass
;❑Not Observable
[IN3]1
exterior, the exterior insulation
E] Steel
[D steel
;❑Not Applicable
10
:requirement applies (FR10).
303.2 ;Wall insulation is installed per❑Complies
[IN4]1 manufacturer's instructions. ❑Does Not
l ❑Not Observable
-to Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Blair Lot 34 Transformation Hill Report date: 11/29/21
Data filename: Page 5 of 7
Section
#
Final Inspection Provisions
Plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
& Req.ID
402.1.1,
'Ceiling insulation R -value.
R- R-
❑Complies See the Envelope Assemblies
402.2.1,
Wood ❑ Wood
;❑Does Not table for values.
402.2.2,
402.2.6
E] Steel ❑ Steel
❑Not Observable
[FI1]1
.❑Not Applicable
303.1.1.1,
.Ceiling insulation installed per
❑Complies
303.2
:manufacturer's instructions.
❑Does Not
[FI2]1
;Blown insulation marked every
:300 ft2.
❑Not Observable
❑Not Applicable
402.2.3
.Vented attics with air permeable
❑Complies
[F122 ]2
:insulation include baffle adjacent
❑Does Not
to soffit and eave vents that
:extends over insulation.
❑Not Observable ".
❑Not Applicable
402.2.4
Attic access hatch and door
. R- . R-
❑Complies
[FI3]1
insulation >_R -value of the
❑Does Not
:adjacent assembly.
❑Not Observable
❑Not Applicable
402.4.1.2
. Blower door test @ 50 Pa. <=5
. ACH 50 = . ACH 50 =
.❑Complies
[FI17]1
:ach in Climate Zones 1-2, and
;❑Does Not
10
<=3 ach in Climate Zones 3-8.
.❑Not Observable
.❑Not Applicable
403.2.2
:Duct tightness test result of <=4
. cfm/100 cfm/100
.❑Complies
[FI4]1
:cfm/100 ft2 across the system or
: ft2 : ft2
;❑Does Not
<=3 cfm/100 ft2 without air
:handler @ 25 Pa. For rough -in
:❑Not Observable :
;tests, verification may need to
.❑Not Applicable
.occur during Framing Inspection.
403.2.2.1
.Air handler leakage designated
❑Complies
[FI24]1
:by manufacturer at <=2% of
❑Does Not
:design air flow.
❑Not Observable
❑Not Applicable
403.1.1
Programmable thermostats
❑Complies
[Fl 9]2
installed on forced air furnaces.
❑Does Not
❑Not Observable
❑Not Applicable
403.1.2
Heat pump thermostat installed
❑Complies
[Fl 10]z
on heat pumps.
❑Does Not
V
❑Not Observable
❑Not Applicable
403.4.1
Circulating service hot water
❑Complies
[Fl 11]z ;systems have automatic or
❑Does Not
;accessible manual controls.
❑Not Observable
❑Not Applicable
403.5.1
:All mechanical ventilation system
❑Complies
[F125 ]2
fans not part of tested and listed
❑Does Not
HVAC equipment meet efficacy
:and airflow limits.
❑Not Observable
❑Not Applicable
404.1
.75% of lamps in permanent
❑Complies
[FI6]1
:fixtures or 75% of permanent
❑Does Not
;fixtures have high efficacy lamps.
,Does not apply to low -voltage
❑Not Observable
:lighting.
❑Not Applicable
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Blair Lot 34 Transformation Hill Report date: 11/29/21
Data filename: Page 6 of 7
Section
#
Final Inspection Provisions
Plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
& Req.ID
404.1.1
Fuel gas lighting systems have
❑Complies
[FI23]3
no continuous pilot light.
❑Does Not
E❑Not
Observable
;❑Not Applicable
401.3
Compliance certificate posted.
❑Complies
[FI7]2
❑Does Not
#0
EA❑Not Observable
;❑Not Applicable
303.3
Manufacturer manuals for
;❑Complies
[FI18]3
mechanical and water heating
;❑Does Not
systems have been provided.
;❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Blair Lot 34 Transformation Hill Report date: 11/29/21
Data filename: Page 7 of 7
2012 IECC Energy
Efficiency Certificate
Above -Grade Wall 90.00
Below -Grade Wall 90.00
Floor 0.00
Ceiling / Roof 120.00
Ductwork (unconditioned spaces):
Window 0.02
Door 0.02
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments