BP8132The City of Blair Building Permit Detail
Permit #: 8132
Issued: 05/12/1998
Completed: 08/21 / 1998
Owner: Ted Niday
Address: 877 N. 25th Avenue
Blair, NE 68008
Phone: 402-426-3302
Section: Township: Range:
Subdivision: Lot:
11x6 wood decking in front of house between two patios.
Inspections Date By
08/21/1998 KAR
Remarks
Type: Decks -All types
Valuation: $300.00
Final Inspection of Project
Permit Fee: $15.00
Issue Fee:
Deposit Amt.:
Receipt #:
Block:
Pass
Contractors
SELF General Contractor Permit # Issued
- ~ ~UIL®ING PERMIT APPLICATION
i~f ~~ Jurisdiction of City of Blair, Nebraska
Permit Fee: 218 S th 16th St t
Issuance Fee:
Deposit Receipt #:
ou ree
Blair, Nebraska 68008 313 2
(402) 426-4191 • Fax (402) 426-4195 Permit
Application Date: ~ ~ ~ C '
Issue Date: ~~~/~~
JOB ADDRESS '
LEGAL
1. DESCR. LOT NO. BLK. TRACT
^ SEE ATTACHED SHEET
2.OWNER __ _j
~J C~ r f +
v MAIL ADDRESS ZIP ~ O~ ,~ j~
(,~
CONTRACTOR
3. MAIL ADDRESS ZIP PHONE
4. Class of Work: O NEW O ADDITION O REMODEL
5. Describe Work: ~ ~ ~ ~ ,eCs ~ j (~ D -,-0 Finished Basement O Unfinished Basement
~ U .~
6. Total Sq. Footage (InclualRg Basement ana Garage): Total Finished Area:
7. Valuation of Work: $ , lSU
Floodway O Yes
8. Floodplain: Fringe O Yes O No
O No Dev. Permit
BFE
Elev. Cert.
9. Current Zoning: ~'~'~
10. State Fire Marshall Required: O Yes O No
11. Special Use Permit Required: O Yes O No
12. Variance Required: O Yes O No
13. Minimum Setbacks: Front ~ Side _~ Rear
14. Sidewalk Required: Yes O No Waiver Approved .
NOTICE
Separate permits are required for electrical, plumbing, healing, ventilating and air
conditioning, and septic systems. By my signature below, I acknowledge that payment
of the building permit application fee does not constitute issuance of this building
permit. I further agree that construction covered by this permit application shall not be
commenced until I have received acopy of this application form signed by the Building
Inspector.
I hereby agree to perform the proposed work in accordance with the specifications set
forth above and in accordance with the codes/ordinances of the City of Blair and the
State of Nebraska. I understand that this permit is void if work is not commenced within
180 days or is not completed within 2 years of date of issue.
OF OWNERI NTRA DATE
Comment:
MEET~/tlBC. ~ UIIAC AM!!
NE~e ~ I~-~
,Site Plan Attached O Co a Plans Attached
Approximate Completion Date ~ ~- ~ ~-~ ~~
Inspections Required and Fees
Utilities
Sewer
Septic
Buildin
Footi
Frar '
Electrical
Water Service
Remote
Stop Box Card
~~
fore ' ish)
F'
Rough-in Fixtures
Final Permanent Service
Temporary Service
Mechanical
Rough-in A\C
Final
Plumbin _
Ground Work
Rough•in _
Final
WHEN PROPERLY VALIDATED (IN THIS~~FY,f~iIS IS YOUR PERMIT
Rev. e196
POUNDS PRTG.-Blair, NE
H o~ ~~ ~
~ ~ ~~
0 ~ o
-i ~ o z ~ °a
~ ~ ~ °~ ~~~ 3 ~ 5 ~ ^ j
E O
W ~ "~ ,~ ^ ^ ~ ^ ~
~ ~ . ~'
~ \
ni o 1 ~~E ~ 7~ ~ a a x
~ ~ a ~ ° `a'
A m W
U y~ ti
H 3 p. ~~ ~ ~ W W ~ ~ '. O
fr3] W ~
A ^ ~~ ~' ~ z ~,a ~ a a
~~ M w o ~ w ~ c7 F- W a ~i ~ ~¢ ~ " u~7
FBI O O w rn r°ii Gc ~ ~ 4~ O V v rG t7 Z ~ °
~ ~ U ° ~ ~ a. o °o ~ ~ a o ~ s o P7 a .Fi ~
~~° ~A~ ~~os^o~oo~o~o ~~
.-
.;,P
,~ _
,y9
r
ff
~,~I ~
x
- - i
ey a
~ C~~ ~ ~
,I
.~ ~j
~ 44 GI
C~
_a ~; ~
~ -- ~~
.~ iI
l 3 *~ ~ ~I ~ ~ I ~~ ~
I~ ~
cn ~% I i ,Y -fi
I °~ j
1~ ~ i .I ~~
~ ! l
Gr ~ I ~ I ri
~ V~: ~ ~~
~I. ~_ w
J ; ~ ~.
S
~~----~ ~ - ~ ~~
I,~i
Y, ~ ~ d
~~ ~
J
S
•3
¢'
m
° °
O z
^ z
^
.~ ~
~ ~,
^ ^
~
~ U _
5
1)
o
s
d
O
~ i
~ ~ a
U,
~ °
o
F
~ ti
~ a ~
w ° w '
0 0
~ ~
A ~