Loading...
BP7723Building Report Detail Permit #: 7723 Issued: 05/23/1997 Type: Signs Completed: 02/13/1998 Valuation: $8,000.00 Owner: No Frills Address: 238 S. 8th Street Blair, NE 68008 Phone: Section: Township: Range: Subdivision: Lot: Sign-11' x 28' pole sign. Illuminated -Placed on existing structure Inspections Date By 02/13/1998 DEM Final Inspection of Project Remarks Contractors Blair Sign 8~ Design General Contractor Permit Fee: $15.00 Issue Fee: Deposit Amt.: Receipt #: Block: Pass Permit # Issued ' BOIL Permit Fee: ~ 5 '~~ Issuance Fee: Deposit Receipt #: DING PERMIT APPLICATIO Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 • Fax (402) 426-4195 Permit 7723 Application Date: ~ ` f --~ " ~ ~ Issue Date: ~ ` Z 3 - JOB ADDRESS Z3 ~ s . ~`~ LEGAL 1. DESCR. LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET 2 OWNER h I/` ~ / ~ ~ m ~ AIL AD 1 v V ~~ ~ ESS ZIP PHONE 3. CONTRACT R~./ ~!. ~ ~.1.1r~~ ~ZDR, IS C ~~V l G V(,Lf-ZIP ~ 1 (~/11~~E [S/tlG~~ NEW O ADDITION 4. Class of Work: O REMODEL 5. Describe Work: s~' ~ ~ 1 ~ )( ~ ~ ~ ~~~ SSG ~ D Finished Basement O Unfinished Basement 1(l Gc.m ~ n a.~ - ~cc.C~- r S~ %~ ~~~ 6. Total Sq. Footage (InoludiRg Basement and Garage): Total Finished Area: 7. Valuation of Work: $ ~Q ~U . C~C~ Floodway O Yes O No 8. Floodplain: Fringe O Yes O No Dev. Permit BFE Elev. Cert. A~ 9. Current Zoning: 10. State Fire Marshall Required: O Yes O No 11. Special Use Permit Required: O Yes O No 12. Variance Required: O Yes O No 13. Minimum Setbacks: Front Side Rear 14. Sidewalk Required: O Yes O No Waiver Approved NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the Stat a aska.lunderstandlhatthisperr~Itis fworkisnotcommencedwithin 18 days or not complete,~l within 2 yeafFs ~ ate o issue. DATE Comment: ~j~~!~l ~~~ ~ /f~~-,~~~~ O Site Plan Attached ~ O~Compl~te Plans Attached Approximate Completion Date ~e..~J~S Inspections Required and Fees Utilities Sewer Septic Buildin Footings Framing ~~ Electrical Rough-in Final Temporary Service Mechanical Rough-in Final Plumbin _ Ground Work Rough-in _ Final WHEN PROPERLY VALID E) THIS IS YOUR PERMIT Water Service Remote Stop Box Card Drywall - (beforefinish) N ~'~ -i~-~8 Permanent Service A\C POUNDS PRTG: Blair, NE Rev. 8196 BUILDING INSPECTION- REPORT CITY OF BLAIR ^ WASHIIVGTON COUNTY ^ OTHER J r" !7 t ~ ~ ~.7 i . .,OCATION OF INSPECTION: ~~ ~ ~ ~ (~ ' ~ - t~ NAME OF OWNER: , ~~~ `3~' ~~ s ~ t ~ CONTRACTOR: _~~~-!-.~ ~ ~~ I ~' ~~ ~L, I ~ DATE INSPECTION REQUESTED: PERMIT NO: 1 i ~ r I TIME INSPECTION REQUESTED:. C' TYPE OF INSPECTION REQUESTED: ~~` ~ t (^ C BUILDING: `~`~-~ `.~ •~"~~~ l~ I f~- ^ FOOTING ^ FRAMING ^ DRYWALL - ^ FINAL I' UTILITIES: f. ^ SEWER TAP ^,SEWER ^ SEPTIC ^ WATER TAP ^ REMOTE ~ ^ WATER SERVICE j j ELECTRICAL: .~ ~ ^ ROUGH IN' ^ FIXTURES __^ FINAL ^ MOTORS ' l PERMANENT SERVICE ^ TEMPORARY SERVICE MECHAMCAL: \,Y - 4 ^ ROUGH-IN : ^ A/C ^ ~,~ f - ~ I PLUMBING: ~ -- - ^GROUNDWORK ^ ROUGH-IN ^ FINAL ' RESULTS OF THE WSPECTION: ~ ASSED (s~xo~rES~ ^ FAILED (s~rro~s~- 1 NOTES/REMARKS: , ,~ ~ ' ( DATE OF WSPECTION MADE ~~ ~ _ CALLED OPPD\ TO CONNECT SERVICE: WANT OFFICE STAFF TO CALL OPPD\ - - -Z.-_~____-__-_-_________-_-_.__-_.-__~-._ ^ YES ^ NO ~ YES ^ NO BLR 1 • .. .. ~~~ ~ ~ ~ ~ ~ i~~ 1'59 QP1 ~ ~ ~ i`h 3~ 1 'V k ~e ~~ ~ ~~ ~ ~~ ~ k s m ~'+ Sn J 7' ~ 1 oQ ~ ~ s o. ~_i ~ ~..,i ° ~~ W" d O C Y ~1 - ~ aa~'~ ~ ~' to .~g ~' l ~" ry O ~~ ~ F - ~ O O O W W ^ • ~s ,w-~iri ~ ~ ~' ` ~ a~ ~ ~ ~yy ~ ~ 3 u., l ~. 4 r 0 '~ ~ , , o '. r __.. ~ r H