BP7723Building Report Detail
Permit #: 7723 Issued: 05/23/1997 Type: Signs
Completed: 02/13/1998 Valuation: $8,000.00
Owner: No Frills
Address: 238 S. 8th Street
Blair, NE 68008
Phone:
Section: Township: Range:
Subdivision: Lot:
Sign-11' x 28' pole sign. Illuminated -Placed on existing structure
Inspections Date By
02/13/1998 DEM Final Inspection of Project
Remarks
Contractors
Blair Sign 8~ Design
General Contractor
Permit Fee: $15.00
Issue Fee:
Deposit Amt.:
Receipt #:
Block:
Pass
Permit # Issued
' BOIL
Permit Fee: ~ 5 '~~
Issuance Fee:
Deposit Receipt #:
DING PERMIT APPLICATIO
Jurisdiction of City of Blair, Nebraska
218 South 16th Street
Blair, Nebraska 68008
(402) 426-4191 • Fax (402) 426-4195 Permit
7723
Application Date: ~ ` f --~ " ~ ~ Issue Date: ~ ` Z 3 -
JOB ADDRESS
Z3 ~ s . ~`~
LEGAL
1. DESCR. LOT NO. BLK. TRACT
^ SEE ATTACHED SHEET
2 OWNER h I/` ~ / ~ ~ m ~ AIL AD
1 v V ~~ ~ ESS ZIP PHONE
3. CONTRACT R~./ ~!. ~ ~.1.1r~~ ~ZDR, IS C ~~V
l G
V(,Lf-ZIP ~ 1 (~/11~~E [S/tlG~~
NEW O ADDITION
4. Class of Work: O REMODEL
5. Describe Work: s~' ~ ~ 1 ~ )( ~ ~ ~ ~~~ SSG ~ D Finished Basement O Unfinished Basement
1(l Gc.m ~ n a.~ - ~cc.C~- r S~ %~ ~~~
6. Total Sq. Footage (InoludiRg Basement and Garage): Total Finished Area:
7. Valuation of Work: $ ~Q ~U . C~C~
Floodway O Yes O No
8. Floodplain: Fringe O Yes O No Dev. Permit
BFE
Elev. Cert.
A~
9. Current Zoning:
10. State Fire Marshall Required: O Yes O No
11. Special Use Permit Required: O Yes O No
12. Variance Required: O Yes O No
13. Minimum Setbacks: Front Side Rear
14. Sidewalk Required: O Yes O No Waiver Approved
NOTICE
Separate permits are required for electrical, plumbing, heating, ventilating and air
conditioning, and septic systems. By my signature below, I acknowledge that payment
of the building permit application fee does not constitute issuance of this building
permit. I further agree that construction covered by this permit application shall not be
commenced until I have received a copy of this application form signed by the Building
Inspector.
I hereby agree to perform the proposed work in accordance with the specifications set
forth above and in accordance with the codes/ordinances of the City of Blair and the
Stat a aska.lunderstandlhatthisperr~Itis fworkisnotcommencedwithin
18 days or not complete,~l within 2 yeafFs ~ ate o issue.
DATE
Comment: ~j~~!~l ~~~ ~ /f~~-,~~~~
O Site Plan Attached ~ O~Compl~te Plans Attached
Approximate Completion Date ~e..~J~S
Inspections Required and Fees
Utilities
Sewer
Septic
Buildin
Footings
Framing ~~
Electrical
Rough-in
Final
Temporary Service
Mechanical
Rough-in
Final
Plumbin _
Ground Work
Rough-in _
Final
WHEN PROPERLY VALID E) THIS IS YOUR PERMIT
Water Service
Remote
Stop Box Card
Drywall -
(beforefinish)
N ~'~
-i~-~8
Permanent Service
A\C
POUNDS PRTG: Blair, NE Rev. 8196
BUILDING INSPECTION- REPORT
CITY OF BLAIR ^ WASHIIVGTON COUNTY ^ OTHER J
r" !7 t ~ ~ ~.7 i .
.,OCATION OF INSPECTION: ~~ ~ ~ ~ (~ ' ~ -
t~
NAME OF OWNER: , ~~~ `3~' ~~ s ~ t ~ CONTRACTOR: _~~~-!-.~ ~ ~~ I ~' ~~ ~L, I ~
DATE INSPECTION REQUESTED: PERMIT NO: 1 i ~
r
I TIME INSPECTION REQUESTED:.
C' TYPE OF INSPECTION REQUESTED: ~~` ~ t (^
C BUILDING: `~`~-~ `.~ •~"~~~
l~ I
f~- ^ FOOTING ^ FRAMING ^ DRYWALL - ^ FINAL
I' UTILITIES:
f. ^ SEWER TAP ^,SEWER ^ SEPTIC ^ WATER TAP
^ REMOTE
~ ^ WATER SERVICE
j
j ELECTRICAL:
.~
~ ^ ROUGH IN' ^ FIXTURES __^ FINAL ^ MOTORS '
l
PERMANENT SERVICE ^ TEMPORARY SERVICE
MECHAMCAL: \,Y -
4
^ ROUGH-IN : ^ A/C ^ ~,~
f - ~ I
PLUMBING: ~
-- -
^GROUNDWORK ^ ROUGH-IN ^ FINAL
' RESULTS OF THE WSPECTION: ~ ASSED (s~xo~rES~ ^ FAILED (s~rro~s~- 1
NOTES/REMARKS: ,
,~ ~
' ( DATE OF WSPECTION MADE ~~ ~
_ CALLED OPPD\ TO CONNECT SERVICE:
WANT OFFICE STAFF TO CALL OPPD\
- - -Z.-_~____-__-_-_________-_-_.__-_.-__~-._
^ YES ^ NO ~
YES ^ NO BLR 1
•
.. ..
~~~ ~ ~ ~ ~
~ i~~ 1'59 QP1 ~ ~ ~ i`h 3~
1 'V k
~e ~~ ~ ~~ ~
~~ ~ k s
m ~'+ Sn J 7'
~ 1
oQ ~ ~ s
o. ~_i ~ ~..,i ° ~~
W" d O C Y ~1 - ~ aa~'~ ~ ~' to .~g ~' l ~" ry O
~~ ~ F - ~
O O O W W ^ • ~s ,w-~iri ~ ~ ~' `
~ a~ ~ ~
~yy ~ ~ 3 u., l ~. 4
r
0 '~
~ , , o
'. r __.. ~
r
H