Loading...
Compressive Strength of Grout Cube-Auger Cast Pile5 12/23/2019 Mail - Building Department - Outlook Permit#PRCN20170383 closeout. Jay Butterbaugh <Jay_Butterbaugh@cargiII.com> Mon 12/23/2019 1:57 PM To: Building Department <building@blairnebraska.org> Cc: Jay Butterbaugh <Jay_Butterbaugh@cargill.com> 1 9 attachments (549 KB) Compressive Strength of Grout Cube_006_.pdf; Compressive Strength of Grout Cube_007_.pdf; Compressive Strength of Grout Cube_008_.pdf; Compressive Strength of Grout Cube_009_.pdf; Compressive Strength of Grout Cube _001_.pdf; Compressive Strength of Grout Cube_002_.pdf; Compressive Strength of Grout Cube_003_.pdf; Compressive Strength of Grout Cube_004_.pdf; Compressive Strength of Grout Cube_005_.pdf; Please find the special inspection reports for grout cube breaks. Following this email will concrete break reports. Thank you. Jay Butterbaugh Construction Supervisor Office 1-402-533-4114 Cell 1-402-651-4650 https://outlook.office.com/mail/inbox/id/AAQkAGE20TU2NjRmLTkzZTktNGJINiO5ZD]jLTJjMjFjOGE1 NjM1 NAAQAH9%2B68LPIUpjnOMuRlw6910%3D/... 1/1 Compressive Strength of Grout Report #: GCF-000007 Report Date: 1/29/2018 Cube Sample: 37337 ASSOCIATES Test Method: Sarpy 11627 Virginia Plaza Suite 103 La Vista, NE 68128 Phone: 402-827-7220 Fax: 402-827-7223 Client: Cargill Inc 650 Industrial Park Dr Blair, NE 68008 Project: 017-3801 Cargill Project Octopus Observation Blair NE Blair, NE Sample Details Set #: 6 Technician: Anderson, Jason Batched: 09:30 CST Specimen Size: 2"x 2" x 2" Cast By: Anderson, Jason Sampled: 09:30 CST Specimens In Set: 6 Date Cast: 12/13/17 Cast: 09:45 CST Contractor: Cargill Sampled From: Truck Chute Location Placement Location: Footing - Auger Cast Pile Location Details: Auger Cast Pile l Sample Location / Notes: Auger cast pile #1 Batch Log Specifications Method of Batching: Pre Mixed Cement Qty: 10.00 Strength: 3000 (psi) Cement Source: Quickrete Cement Type: Grout Batch Consistency: Flowable Field Measurements Weather: Sunny Consistency: Spread Air Content: Air Temperature (F): 41 Grout Temp (F): Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Max Load Strength Break Capping Number Age Days Date Cure Days Area (in') (Ibs) (psi) Remark Method 6-1 7 12/20/17 7/0 4.00 16,560 4,140 Al - 6-2 28 01/10/18 7/21 4.00 25,090 6,270 B1 - 6-3 28 01/10/18 7/21 4.00 21,600 5,400 B1 - 6-4 1 56 1 02/07/18 1 7/49 6-5 56 H 02/07/18 7/49 6-6 56 H 02/07/18 7/49 Test Age Average Strengths (psi): 7 Day - 4140, 28 Day - 5840 Break Remarks < Capping Methods Al: Test result meets or exceeds 75% of the 28 day specified strength. -: Not Applicable B1: Test result meets or exceeds the 28 day specified strength. Jason Anderson Project Manager Page 1 of 1 Sarpy 11627 Virginia Plaza Suite 103 La Vista, NE 68128 Phone: 402-827-7220 Fax: 402-827-7223 Client: Cargill Inc 650 Industrial Park Dr Blair, NE 68008 Project: 017-3801 Cargill Project Octopus Observation Blair NE Blair, NE Sample Details Set #: 6 Technician: Anderson, Jason Batched: 09:30 CST Specimen Size: 2"x 2" x 2" Cast By: Anderson, Jason Sampled: 09:30 CST Specimens In Set: 6 Date Cast: 12/13/17 Cast: 09:45 CST Contractor: Cargill Sampled From: Truck Chute Location Placement Location: Footing - Auger Cast Pile Location Details: Auger Cast Pile l Sample Location / Notes: Auger cast pile #1 Batch Log Specifications Method of Batching: Pre Mixed Cement Qty: 10.00 Strength: 3000 (psi) Cement Source: Quickrete Cement Type: Grout Batch Consistency: Flowable Field Measurements Weather: Sunny Consistency: Spread Air Content: Air Temperature (F): 41 Grout Temp (F): Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Max Load Strength Break Capping Number Age Days Date Cure Days Area (in') (Ibs) (psi) Remark Method 6-1 7 12/20/17 7/0 4.00 16,560 4,140 Al - 6-2 28 01/10/18 7/21 4.00 25,090 6,270 B1 - 6-3 28 01/10/18 7/21 4.00 21,600 5,400 B1 - 6-4 1 56 1 02/07/18 1 7/49 6-5 56 H 02/07/18 7/49 6-6 56 H 02/07/18 7/49 Test Age Average Strengths (psi): 7 Day - 4140, 28 Day - 5840 Break Remarks < Capping Methods Al: Test result meets or exceeds 75% of the 28 day specified strength. -: Not Applicable B1: Test result meets or exceeds the 28 day specified strength. Jason Anderson Project Manager Page 1 of 1 Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Max Load Strength Break Capping Number Age Days Date Cure Days Area (in') (Ibs) (psi) Remark Method 6-1 7 12/20/17 7/0 4.00 16,560 4,140 Al - 6-2 28 01/10/18 7/21 4.00 25,090 6,270 B1 - 6-3 28 01/10/18 7/21 4.00 21,600 5,400 B1 - 6-4 1 56 1 02/07/18 1 7/49 6-5 56 H 02/07/18 7/49 6-6 56 H 02/07/18 7/49 Test Age Average Strengths (psi): 7 Day - 4140, 28 Day - 5840 Break Remarks < Capping Methods Al: Test result meets or exceeds 75% of the 28 day specified strength. -: Not Applicable B1: Test result meets or exceeds the 28 day specified strength. Jason Anderson Project Manager Page 1 of 1 Jason Anderson Project Manager Page 1 of 1 ASSOCIATES Sarpy 11627 Virginia Plaza Suite 103 La Vista, NE 68128 Phone: 402-827-7220 Fax: 402-827-7223 Compressive Strength of Grout Report #: GCF-000002 p g Report Date: 1/29/2018 Cube Sample: 37354 Test Method: Client: Project: Cargill Inc 017-3801 650 Industrial Park Dr Cargill Project Octopus Observation Blair NE Blair, NE 68008 Blair, NE Lab Test Results Sample Details Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Set #: 7 Technician: Hanselman, Dale Batched: 09:08 CST Specimen Size: 2"x 2" x 2" Cast By: Hanselman, Dale Sampled: 10:15 CST Specimens In Set: 3 Date Cast: 12/20/17 Cast: 10:30 CST Truck / Ticket #: 3424 152987781 Sampled From: Truck Chute Truck Empty: 11:00 CST Contractor: Berkel & Company Placement Method: Pump Placement Time: 112 (min) Contractors Location Placement Location: Footing - Auger Cast Pile Location Details: HIS Evaporation Building Pile E 46 Sample Location / Notes: HIS Evaporation Building Pile E 46 Batch Log ; Specifications Supplier: Gerhold Concrete Mix Design: Berke] Auger Filing Mix Strength: 4000 (psi) Plant: 529 Batch Consistency. Fluid Field Measurements Weather: Sunny Flow Cone (sec): 31.0 (C939) Air Content: Air Temperature (F): 38 Grout Temp (F): 52 (C1064) Load Volume: 8 (yd3) Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Number Age Days Date Cure Days Area (int) Max Load (Ibs) Strength (psi) Break Capping Remark Method 7-1 7 12/27/17 6/1 4.00 13,530 3,380 Al - 7-2 28 01/17/18 6/22 4.00 22,750 5,690 Bl - 7-3 28 01/17/18 6/22 4.00 23,820 5,960 B1 - Test Age Average Strengths (psi): 7 Day - 3380, 28 Day - 5820 Break Remarks ' Capping Methods Al: Test result meets or exceeds 75% of the 28 day specified strength. B1: Test result meets or exceeds the 28 day specified strength. -: Not Applicable <�;o Z-___ Jason Anderson Project Manager Page 1 of 1 G Report #: GCF-000001 Compressive Strength of Grout Report Date: 1/29/2018 C -Y OLSSON Cube Sample: 37425 ASSOCIATES Test Method: Technician: Sarpy Client: Project: 11627 Virginia Plaza Cargill Inc 017-3801 Suite 103 650 Industrial Park Dr Cargill Project Octopus Observation Blair NE La Vista, NE 68128 Blair, NE 68008 Date Cast: Phone: 402-827-7220 Cast: Blair, NE Fax: 402-827-7223 3427 / 52987817 Sampled From: Lab Test Results Sample Details Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Set #: 8 Technician: Hanselman, Dale Batched: 10:01 CST Specimen Size: 2"x 2" x 2" Cast By: Hanselman, Dale Sampled: 11:40 CST Specimens In Set: 3 Date Cast: 12/21/17 Cast: 11:50 CST Truck / Ticket #: 3427 / 52987817 Sampled From: Truck Chute Truck Empty: 12:00 CST Contractor: Berkel & Company Placement Method: Pump Placement Time: 119 min Location Placement Location: Footing - Auger Cast Pile Location Details: Utility Building Pile U 06 Sample Location / Notes: Pile U06 Batch Log Specifications Supplier: Gerhoid Concrete Mix Design: Berke] Auger Filing Mix Strength: 4000 (psi) Plant: 529 Batch Consistency: Flowable Field Measurements Weather: Rain Flow Cone (sec): 30.0 (C939) Air Content: Air Temperature (F): 32 Grout Temp (F): 51 (C1064) Load Volume: 8 (yd') Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Number Age Days Date Cure Days Area (in') Max Load (Ibs) Strength (psi) Break Capping Remark Method 8-1 7 12/28/17 1/6 4.00 10,740 2,690 A2 - 8-2 7 12/28/17 1/6 4.00 9,760 2,440 A2 G 8-3 28 01/18/18 1127 4.00 17,800 4,450 131 - Test Age Average Strengths (psi): 7 Day - 2560, 28 Day - 4450 Break Remarks Capping Methods A2: Test result is less than 75% of the 28 day specified strength. 131: Test result meets or exceeds the 28 dayspecified strength. -: Not Applicable G: Gypsum Cas ASTM C617 Jason Anderson Project Manager Page 1 of 1 Lab Test Results Report#: GC 011 Compressive ressive Stren thofGrout � Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Report Date: 2/19/2018 Set M Cube Sample: 37469 Hanseiman, Dale Batched: 09:10 CST ASSOCIATES Test Method: Cast By: Sarpy Client: Project: 11627 Virginia Plaza Cargill Inc 017-3801 Suite 103 650 Industrial Park Dr Cargill Project Octopus Observation Blair NE La Vista, NE 68128 Blair, NE 68008 Sampled From: Phone: 402-827-7220 Truck Empty: Blair, NE Fax: 402-827-7223 Berkel & Company Placement Method: Lab Test Results Sample Details Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Set M 9 Technician: Hanseiman, Dale Batched: 09:10 CST Specimen Size: 2"x 2" x 2" Cast By: Hanseiman, Dale Sampled: 09:40 CST Specimens In Set: 3 Date Cast: 12/22/17 Cast: 09:50 CST Truck / Ticket # 3589 / 52987836 Sampled From: Truck Chute Truck Empty: 10:40 CST Contractor: Berkel & Company Placement Method: Pump Placement Time: 90 min Location Placement Location: Footing - Auger Cast Pile Location Details: Utility Building Pile U 27 Sample Location / Notes: Utility Building Pile U 27 Batch Log Specifications Supplier: Gerhold Concrete Mix Design: Berkel Auger Filing Mix Strength: 4000 (psi) Plant: 529 Batch Consistency: Flowable Field Measurements Weather: Sunny Flow Cone (sec): 31.0 (C939) Air Content: Air Temperature (F): 19 Grout Temp (F): 52 (C1064) Load Volume: 8 (yd 3) Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Max Load Number Age Days Date Cure Days Area (in') (Ibs) Strength (psi) Break Capping Remark Method 9-1 7 12/29/17 6/1 4.00 2,160 540 A2 9-2 28 01/19/18 6/22 4.00 5,450 1,360 B2 - 9-3 56 02/16/18 6/50 4.00 5,810 1,450 B2 - Test Age Average Strengths (psi): 7 Day - 540, 28 Day -1360, 56 Day -1450 Break Remarks Capping Methods A2: Test result is less than 75% of the 28 day specified strength. B2: Test result does not meet the 28 dayspecified strength. -: Not Applicable ;�— Jason Anderson Project Manager Page 1 of 1 xplOLM'q A, ASSOCIATES Sarpy 11627 Virginia Plaza Suite 103 La Vista, NE 68128 Phone: 402-827-7220 Fax: 402-827-7223 Compressive Cube Test Method: Client: Cargill Inc 650 Industrial Park Dr Blair, NE 68008 Strength of Grout Report #: GF -000006 Report Date: t1/29/2018 Sample: 37119 Project: 017-3801 Cargill Project Octopus Observation Blair NE Blair, NE Lab Test Results Sample Details Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Set #: 1 Technician: Hanselman, Dale Batched: 10:24 CST Specimen Size: 2"x 2" x 2" Cast By: Hanselman, Dale Sampled: 11:20 CST Specimens In Set: 3 Date Cast: 12/14/17 Cast: 11:35 CST Truck / Ticket #: 3327 / 52987635 Sampled From: End of Pump Truck Empty: 11:17 CST Contractor: Berke] & Co. Placement Method: Pump Placement Time: 53 min Location Placement Location: Footing - Auger Cast Pile Location Details: Utility Building Addition Pile - U 26 Sample Location / Notes: Pile - U 26 Batch Log Specifications Supplier: Gerhold Concrete Mix Design: Berke] Auger Filing Mix Strength: 4000 (psi) Plant: 529 Batch Consistency: Flowable Field Measurements Weather: Overcast Flow Cone (sec): 31.0 (C939) Air Content: Air Temperature (F): 39 Grout Temp (F): 63 (C1064) Load Volume: 8 (yd3) Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Number Age Days Date Cure Days Area (in') Max Load (Ibs) Strength (psi) Break Capping Remark Method 1-1 7 12/21/17 4/3 4.00 14,720 3,680 Al 1-2 28 01/11/18 4/24 4.00 18,290 4,570 B1 - 1-3 28 01/11/18 4/24 4.00 16,900 4,230 B1 - Test Age Average Strengths (psi): 7 Day - 3680, 28 Day - 4400 Break Remarks Capping Methods Al: Test result meets or exceeds 75% of the 28 day specified strength. 131: Test result meets or exceeds the 28 dayspecified strength. -: Not Applicable Jason Anderson Project Manager Page 1 of 1 -� & Report#: GC 008 Compressiver Cube Report Date: 1/29/2018 Sample: 37148 Set M 2 Technician: ASSOCIATES Test Method: 12:46 CST Sarpy Client: Project: 11627 Virginia Plaza Cargill Inc 017-3801 Suite 103 650 Industrial Park Dr Cargill Project Octopus Observation Blair NE La Vista, NE 68128 Blair, NE 68008 13:40 CST Phone: 402-827-7220 3424 / 52987608 Blair, NE Fax: 402-827-7223 Truck Empty: 14:00 CST Lab Test Results Sample Details Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Set M 2 Technician: Johnson, Evan Batched: 12:46 CST Specimen Size. 2"x 2" x 2" Cast By: Johnson, Evan Sampled: 13:35 CST Specimens In Set: 3 Date Cast: 12/13/17 Cast: 13:40 CST Truck / Ticket M 3424 / 52987608 Sampled From: Truck Chute Truck Empty: 14:00 CST Contractor: Berke] Placement Method: Pump Placement Time: 74 min Location - Placement Location: Footing - Auger Cast Displacement Pile Location Details: Pile #U09 Sample Location / Notes: Pile#U09 Batch Log Specifications Supplier: Ready Mixed Concrete Mix Design: BERKEL AUGER Strength: 4000 (psi) Company - Lyman PILING MIX Flow Cone: 13 - 25 (sec) Richey Plant: 529 Batch Consistency: Flowable Field Measurements Weather: Flow Cone (sec): 30.0 (C939) Air Content: Air Temperature (F): 50 Grout Temp (F): 65 (C1064) Load Volume: 8 (yd 3) Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Number Age Days Date Cure Days Area (int) Max Load (lbs) Strength (psi) Break Capping Remark Method 2-1 7 12/20/17 2/5 4.00 15,500 3,880 Al - 2-2 28 01/10/18 2126 4.00 23,490 5,870 131 - 2-3 28 01/10/18 2/26 4.00 27,520 6,880 131 - Test Age Average Strengths (psi): 7 Day - 3880, 28 Day - 6380 Break Remarks < Capping Methods Al: Test result meets or exceeds 75% of the 28 day specified strength. B1: Test result meets or exceeds the 28 day specified strength. -: Not Applicable Jason Anderson Project Manager Page 1 of 1 �A,� Compressive Strength of Grout Report#: GC p g Report Date: 1/29/2/29/2005 018 Cube Sample: 37153 A S S O C I A T E S Test Method: Sarpy 11627 Virginia Plaza Suite 103 La Vista, NE 68128 Phone: 402-827-7220 Fax: 402-827-7223 Client: Cargill Inc 650 Industrial Park Dr Blair, NE 68008 Project: 017-3801 Cargill Project Octopus Observation Blair NE Blair, NE Lab Test Results Sample Details Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Set M 3 Technician: Johnson, Evan Batched: 11:35 CST Specimen Size: 2"x 2" x 2" Cast By: Johnson, Evan Sampled: 12:30 CST Specimens In Set: 3 Date Cast: 12/15/17 Cast: 12:35 CST Truck / Ticket #: 3543 / 52987673 Sampled From: Truck Chute Truck Empty: 13:30 CST Contractor: Berkel & Co Contracting Placement Method: Pump Placement Time: 115 min General Remarks Location Placement Location: Footing - Auger Cast Displacement Pile Location Details: Pile #E61 Sample Location 1 Notes: Pile 4E61 Batch Log Specifications Supplier: Ready Mixed Concrete Mix Design: BERKEL AUGER Strength: 4000 (psi) Company - Lyman PILING MIX Flow Cone: 13 - 25 (sec) Richey Plant: 529 Batch Consistency: Flowable Field Measurements Weather: Sunny Flow Cone (sec): 14.6 (C939) Air Content: Air Temperature (F): 50 Grout Temp (F): 65 (01064) Load Volume: 8 (yd3) Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Number Age Days Date Cure Days Area (int) Max Load (Ibs) Strength (psi) Break Capping Remark Method 3-1 7 12/22/17 413 4.00 17,550 4,390 Al - 3-2 28 01/12/18 4/24 4.00 27,890 6,970 B1 3-3 28 01/12/18 4/24 4.00 23,820 5,960 B1 Test Age Average Strengths (psi): 7 Day - 4390, 28 Day - 6460 Break Remarks Capping Methods Al: Test result meets or exceeds 75% of the 28 day specified strength. B1: Test result meets or exceeds the 28 day specified strength. -: Not Applicable General Remarks Contractor added 1 pack of intrusion aid and 50 gallons of water. /f Jason Anderson Project Manager Page 1 of 1 Com ressive Strength g th of Grout Report#: GC /29/2004 p Report Date: 1 /2 912 018 \-OLSSON Cube Sample: 37218 ASSOCIATES Test Method: Sarpy 11627 Virginia Plaza Suite 103 La Vista, NE 68128 Phone: 402-827-7220 Fax: 402-827-7223 Client: Cargill Inc 650 Industrial Park Dr Blair, NE 68008 Project, 017-3801 Cargill Project Octopus Observation Blair NE Blair, NE Lab Test Results Sample Details Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Set M 4 Technician: Hanselman, Dale Batched: 10:10 CST Specimen Size: 2"x 2" x 2" Cast By: Hanselman, Dale Sampled: 11:30 CST Specimens In Set: 3 Date Cast: 12/18/17 Cast: 11:45 CST Truck / Ticket #: 3327 152987708 Sampled From: Truck Chute Truck Empty: 11:00 CST Contractor: Berke] & Company Placement Method: Pump Placement Time: 50 (min) Comtractors Location Placement Location: Footing - Auger Cast Pile Location Details: Pile E 42 Sample Location / Notes: Pile E 42 Batch Log Specifications Batch Consistency: Flowable Strength: 4000 (psi) Field Measurements Weather: Sunny Flow Cone (sec): 30.0 (C939) Air Content: Air Temperature (F): 45 Grout Temp (F): 53 (C1064) Load Volume: 8 (yd') Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Number Age Days Date Cure Days Area (in') Max Load (Ibs) Strength (psi) Break Capping Remark Method 4-1 7 12/25/17 2/5 4.00 9,300 2,330 A2 - 4-2 28 01/15/18 2126 4.00 22,500 5,630 B1 - 4-3 28 01/15/18 2/26 4.00 19,990 5,000 B1 - Test Age Average Strengths (psi): 7 Day - 2330, 28 Day - 5310 Break Remarks Capping Methods A2: Test result is less than 75% of the 28 day specified strength. 131: Test result meets or exceeds the 28 day specified strength. : Not Applicable `5�1— Z' Jason Anderson Project Manager Page 1 of 1 Lab Test Results Report #: GCF-000003 Compressive Strength of Grout Report Date: 1/29/2018 Sample Details Cube Sample: 37284 A S S O C I A T E S Test Method: Technician: Sarpy Client: Project: 11627 Virginia Plaza Cargill Inc 017-3801 Suite 103 650 Industrial Park Dr Cargill Project Octopus Observation Blair NE La Vista, NE 68128 Blair, NE 68008 Date Cast: Phone: 402-827-7220 Cast: Blair, NE Fax: 402-827-7223 3589 / 52987745 Sampled From: Lab Test Results Sample Details Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Set #: 5 Technician: Hanselman, Dale Batched: 10:47 CST Specimen Size: 2"x 2" x 2" Cast By: Hanselman, Dale Sampled: 11:15 CST Specimens In Set: 3 Date Cast: 12/19/17 Cast: 11:30 CST Truck / Ticket M 3589 / 52987745 Sampled From: Truck Chute Truck Empty: 12:45 CST Contractor: Berkel & Company Placement Method: Pump Placement Time: 118 (min) Comtractors Location Placement Location: Footing - Auger Cast Pile Location Details: Pile E 28 Sample Location / Notes: Pile E 28 Batch Log Specifications Supplier: Gerhold Concrete Mix Design: Berkel Auger Filing Mix Strength: 4000 (psi) Plant: 529 Batch Consistency: Flowable Field Measurements Weather: Sunny Flow Cone (sec): 30.0 (C939) Air Content: Air Temperature (F): 43 Grout Temp (F): 53 (C1064) Load Volume: 8 (yd') Lab Test Results Testing Lab: Sarpy, 11627 Virginia Plaza, Suite 103, La Vista, NE, 68128 Specimen Test Test Field / Lab Number Age Days Date Cure Days Area (in') Max Load (Ibs) Strength (psi) Break Capping Remark Method 5-1 7 12/26/17 2/5 4.00 12,070 3,020 Al - 5-2 7 12/26/17 2/5 4.00 12,550 3,140 Al - 5-3 28 01/16/18 2/26 4.00 22,220 5,560 B1 - Test Age Average Strengths (psi): 7 Day - 3080, 28 Day - 5560 Break Remarks Capping Methods Al: Test result meets or exceeds 75% of the 28 day specified strength. B1: Test result meets or exceeds the 28 day specified strength. -: Not Applicable Jason Anderson Project Manager Page 1 of 1