Loading...
Gas Piping TestI HEREBY ATTEST THAT THE FOLLOWING TEST REQUIREMENT ON THE 2 PSIG GAS PIPING SYSTEM AT: STREET CITY STATE HAS BEEN MET OR EXCEEDED: "PRIOR TO THE INSTALLATION OF ANY FUEL LINE OR APPLIANCE REGULATORS, CAP AND SEAL THE PIPING SYSTEM(S), AND TEST WITH AIR AT A PRESSURE OF 10 PSIG FOR AT LEAST 30 MINUTES. AFTER COMPLETION ON THE AIR TEST, INSTALL THE NECESSARY REGULATORS AND SOAP TEST ALL CONNECTIONS FOR LEAKAGE." CONTRACTOR INSTALLER t - DATE FORM 48-0151 (10/08)