Loading...
BP7075r: i BUILDING PERMITAPPLI Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 CATION Permit 7075 Application Date: 0 ~ ~ ~ - ~ ~ Issue Date: S "l ~1 ' ~ ~ Permit Fee: $ ~~ •~~ JOBADDRESS I d S C~ i r 1 LEGAL LOT N0. BLK. TRACT ^ SEE ATTACHED SHEET DESCR. WNER ~ 2 (~ MAILADDRESS ZIP ~ PHONE 2 ~S2~P7 . ~ ~ CONTRACT R MAILADDRESS PHONE LICENSE NO. 3. ~~ ~ < r ~O, ~ ~~ USE OF BUILDING 4. 5. Class of Work: NEW ^ ADDITION ^ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~ ~ c ~ /~ d ~ U -~ r ], Sq. FOOtage Of StrUCture (Including Basement and Garage): $, Change of Use From: Change of Use To: g, Valuation of Work: $ ~ ~ ~ ~ ~ (~ Floodplain: Flooaway Yes^ No ^ 10 Dev. Permit Elev Cert . Fringe Yes^ No ^ . . BFE 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes ^ No ^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes^ No ^ Waiver Approved _ APPLICATION ACCEPTED BY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I acknowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspectorand stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days, is not completed within 2 years of the date of issuance, or if work is abandoned for six (6) months or longer, whichever is earliest. OF OWNER/CONTRACTOR OR AUTHORIZED AGENT DATE Site Plan Attached ^ omplete Plans Attached ^ Approximate Completion Date "1 - ~ L~ ~~/ ~m Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Building Footings Drywall (before finish) r~ l ~U'~~~'%(/ Fi Framing na Electrical Rough-in Permanent Service Final Temporary Service Mechanical Rough-in ABC Final Plumbing Ground Work I SIGNATURE OF OWNF~1{ (IF OWNER BUILDER) DATE I Rough-In Flnal WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approved By: +~ c OUNDS PRT6 -Blelr, NE ~ Rev. OBIB~ 9