Loading...
Gas Piping TestIHEREBYATIL61 IHA1 JHLruLLuM"V ' - MENT ON THE 2 PSIG GAS PIPING SYSTEM AT: STREET CITY STATED HAS BEEN MET OR EXCEEDED: "PRIOR TO THE INSTALLATION OF ANY FUEL LINE OR APPLIANCE REGULATORS, CAP P AND AT L TTESTHE PIPING SYSTEM(S), AND PRESSURE OF 10 PSIG FOR AT R TEST,EAST INS ALL THE 0 MINUTES. AFTER COMPLETION ON THE A NECESSARY REGULATORS AND SOAP TEST ALL CONNECTIONS FOR LEAKAGE" � CONTRACTOR INSTALLER° DATE �I i iw stack Hills EnergY I avingl f with merg FORM 48-0151 (10/08) 1