Gas Piping TestI HEREBY ATTEST THAT THE FOLLOWING
c
TEST REQUIREMENT ON THE 2 PSIG GAS
PIPING SYSTEM AT:
STREET
t
s
CITY STATE
HAS BEEN MET OR EXCEEDED:
"PRIOR TO THE INSTALLATION OF ANY FUEL
LINE OR APPLIANCE REGULATORS, CAP AND
SEAL THE PIPING SYSTEM(S), AND TEST WITH
AIR AT A PRESSURE OF 10 PSIG FOR AT LEAST
30 MINUTES. AFTER COMPLETION ON THE AIR
TEST, INSTALL THE NECESSARY REGULATORS
AND SOAP TEST ALL CONNECTIONS FOR
LEAKAGE."
CONTRACTOR'= y
I
INSTALLER
DATE
I`
r
n„
L
Black Hills Energy
Improvingkfewithenergy
FORM 48-0151 (10/08)
I HEREBY ATTEST THAT THE FOLLOWING'
TEST REQUIREMENT ON THE 2 PSIG GAS
PIPING SYSTEM AT:
b
REET
CITY STATE
HAS BEEN MET OR EXCEEDED:
"PRIOR TO THE INSTALLATION OF ANY FUEL
LINE OR APPLIANCE REGULATORS, CAP AND
SEAL THE PIPING SYSTEM(S), AND TEST WITH
AIR AT A PRESSURE OF 10 PSIG FOR AT LEAST
30 MINUTES. AFTER COMPLETION ON THE AIR
TEST, INSTALL THE NECESSARY REGULATORS
AND SOAP TEST ALL CONNECTIONS FOR
LEAKAGE."
CONTRACTOR
INSTALLER
DATEBlack Q pp
n„
Hillsery
Immprrovinglife with energy
FORM 48-0151(8/14)