Loading...
BP8286The City of Blair Building Permit Detail Permit #: 8286 Issued: 11/20/1998 Type: Roofing permits -All types Completed: 12/28/1998 Valuation: $2,750.00 Owner: Dana College Address: 1922 Butler Street Blair, NE 68008 Phone: 426-7380 Section: Township: Range: Subdivision: Lot: tear off and reroof with asphalt shingles Inspections Date By 12/28/1998 DEM Final Inspection of Project Remarks Contractors McKinnis Roofing & Sheet Metal General Contractor Permit Fee: $15.00 Issue Fee: Deposit Amt.: Receipt #: Block: Pass Permit # Issued BUIL®ING PERMIT APPLICATION i Jurisdiction of City of Blair, Nebraska Permit Fee: I S h S Issuance Fee: Deposit Receipt #: Application Date: l 1 J ~`1 P Issue Date: ~ I ` ~ V ` ~~ JOB ADDRESS ~ j { - ~ l~. ~' 1 LEGAL 1. DESCR. LOT N0. BLK. TRACT ^ SEE ATTACHED SHEET 2.0 R MAIL ADDRESS ~ \ SIP ~ ~ ~P~ONE~ c CO R CTQ~~q MAIL ADDRE ZIP PHONE j t, 4. Class of Work: EW O A ITION O REMODEL 5. Describe Work: _ ~ p ~ ~ ~ ~ ~ ~ O Finished Basement O Unfinished Basement 6. Total Sq. Footage (IRCluliirlg BasemBRt aRd Garagey: Total Finished Area: 7. Valuation of Work: $ (~ , Floodway O Yes O No Floodplain: 8 Dev. Permit Elev. Cert. . Fringe O Yes O No BFE 9. Current Zoning: 10. State Fire Marshall Required: O Yes O No 11. Special Use Permit Required: O Yes O No 12. Variance Required: O Yes O No 13. Minimum Setbacks: Front 14. Sidewalk Required: O Yes Side Rear O No Waiver Approved , NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic systems. By mysignature below, I acknowledge thatpayment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received acopy of this application form signed bythe Building Inspector. hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the S ebraska.l nderstandthatthispermitisvoidifworkisnotcommencedwithin 80 days r i trot c plated withi 2 years o ate of issue. -~o-~t~ SIGNATURE OFOWNER/CONTRACTOR DATE O Site Plan Attached ~ ~O C~ompl~e ns Attached Approximate Completion Date Inspections Required and Fees Utilities Sewer Septic Buildin Footings Framing Electrical Rough-in Final Temporary Service Mechanical Rough-in _ Final - Plumbing - Ground Work Rough-in Water Service Remote Stop Box Card Drywall (before finish) Final Fixtures Permanent Service A\C Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT 218 outh 16t treet Blair, Nebraska 68008 8 2 8 6 (402) 426-4191 • Fax (402) 426-4195 Permit POUNDS PRTG: Blair, NE Rev. 9/96 `BUILDING INSPECTION REPORT ~,] CITY OF BLAIIZ > ^ WASHIIVGTON COUNTY ^ OTHER LOCATION OF INSPECTION: ! G~ ~ ~ ~ LPL, I ~ ~ ~'~ y, NAME OF OWNER: ,~.i l C~ _,() I ~~ ~- CONTRACTOR: 1 I I ~ '-I I'~ I'1 ~ DATE INSPECTION REQUESTED: Z- ~~s "~ ~ pERMIT N0: " , ~'~ TIME INSPECTION REQUESTED: _ ~ ~~-'~ TYPE OF INSPECTION REQUESTED: BUILDING: ~~~ ^ FOOTWG ^ FRAMING ^ DRYWALL `~] FINAL UTILITIES: ^ SEWER TAP ^ SEWER ^ SEPTIC ^ WATER TAP ^ REMOTE ^ WATER SER VICE ELECTRICAL: - ^ ROUGH IN ^ FIXTURES ^ FINAL ^ MOTORS ^ PERMANENT SERVICE ^ TEMPORARY SERVICE MECHANICAL: ^ ROUGH-IN ^ A/C- ^ FINAL _. PLUMBING: • ^ GROUNDWORK ^ ROUGH-IN ^ FINAL RESULTS OF THE WSPECTIpN: PASSED (sEENoTES~ ^ FAILED ~s~xoTES~ . " NOTES/REMARKS: DATE OF INSPECTION CALLED OPPD\ 'T0 CONNECT SERVICE: ^ YES ^ NO WANT OFFICE STAFF TO CALL OPPD\ __ , - _ ..__ _ ._ - ^ .YES ^NO' ~ BLR'1 . i ;% ~~