Signature PagesNI UMI. -
BUILDING PERMIT DEPOSIT AGREEMENT
A$500.00 fundable deposit is being collected for any new commercial, new
r . , and any additions, remodels and accessory building valued $10,000 or
greater at the time of your building permit application.
A $200.00 refundable deposit is being collected for any residential remodel,
addition or accessory building valued under $10,000.
A $50.00 refundable deposit is being collected for all misc. permits.
The City reserves the right to not refund this deposit if any of the following
conditions occur during the construction period:
iI
eft of water service by the plumber, owner or general contractor.
permits have not been obtained.
required inspections have not been obtained.
cupancy occurs prior to a final inspection.
e project is completed without a final inspection being done.
6) W-9 is not filled out for return of deposit
7) Storm Water Management Plan inspection not obtained. (If Required)
If any or all of these situations occur during construction, you may forfeit your
deposit.
I hereby agree to the above conditions and understand that should any or all
of the above situations occur, the building permit deposit SHALL be forfeited or
discounted upon the discretion of the City of Blair, Building and Inspections
Department.
Date
Contractor/Owner
City of Blair
F a
A RAT
u� S 16TH ST
_________
_____---------------
10
____ �munt
Permit# --10 6 7
��T�~IN'RO�����
CHECK #1,519 OO
63
QKW Resiod
C�anop l,519.00
.60
---------------------------
_-________-
FD �!7/2 15:16 ----------
_ rcpr� 46329
236 PART 4 IN Energy Conservation
1040 1 A 1 CHANGE TYNE: Clarification
Sealing i CHANGE SUMMARY: Attic access openings and rim joist junctions
have been added to the list of specific locations requiring sealing to
Thermal Envelope prevent air infiltration.
2009 CODE: N1102.4.1 Building Thermal Envelope. The build-
ing thermal envelope shall be durably sealed to limit infiltration. The
sealing methods between dissimilar materials shall allow for differen-
tial expansion and contraction. The following shall be caulked, Bas-
keted, weatherstripped or otherwise sealed with an air barrier mate-
rial, suitable film or solid material.
1. All joints, seams and penetrations.
2. Site -built windows, doors, and skylights.
3. Openings between window and door assemblies and their re-
spective jambs and framing.
4. Utility penetrations.
Certify that the building is 5. Dropped ceilings or chases adjacent to the thermal envelope.
sealed as per code (2009 IRC) 6. Knee walls.
7. Walls and ceilings separating the garage from conditioned spaces.
8. Behind tubs and showers on exterior walls.
9. Common walls between dwelling units.
10. Attic access openings.
11. Rim joist junction.
Contractor Name: 4912. Other sources of infiltration.
Melvin Sudbeck Homes
Site Address: 2833 Krejci Blvd
Windows
Electrical
outlets
Basement
window
Date:
Signature:
Ceiling
Rim joist
corners junctions
require
—Doors sealing
Duct Sill
seal
Typical sources of air leakage
Rim
joist