Loading...
ResCheckGenerated by REScheck-Web Software Compliance Certificate Project Callahan Energy Code: 2009 IECC Location: Blair, Nebraska Construction Type: Single-family Project Type: New Construction Orientation: Bldg. faces 0 deg. from North Conditioned Floor Area: 3,865 ft2 Glazing Area 15% Climate Zone: 5 (6506 HDD) Permit Date: Permit Number: 7 Construction Site: Owner/Agent: Hidden Fawn Acres Sub Lot #1 Mallory Callahan Blair, NE 68008 4 Designer/Contractor: Jay Nielsen J Nielsen Construction LLC 1730 State Street Blair, NE 68008 nielsenhomesblair@gmail.com Compliance: 18.2% Better Than Code Maximum UA: 537 Your UA: 439 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home. nvelUe-Assem bi9es Ceiling: Flat Ceiling or Scissor Truss Ceiling 1: Flat Ceiling or Scissor Truss Wall: Wood Frame, 16" o.c. Orientation: Front Door: Solid Door (under 50% glazing) Orientation: Front Window: Wood Frame Orientation: Front Window 1: Wood Frame Orientation: Front Window 2: Wood Frame Orientation: Front Wall 1: Wood Frame, 16" o.c. Orientation: Right side Window 3: Wood Frame Orientation: Right side Window: Wood Frame Orientation: Right side Window 1: Wood Frame Orientation: Right side Project Title: Callahan Data filename: 950 0.0 50.0 0.019 18 1,086 0.0 50.0 0.019 21 549 23.0 0.0 0.055 24 39 0.190 7 16 0.280 4 36 0.290 10 16 0.290 5 345 23.0 0.0 0.055 16 12 0.290 3 27 0.290 8 24 0.290 7 549 23.0 0.0 0.055 23 Report date: 09/28/20 Page 1 of 9 Window 2: Wood Frame 16 Fr Jk I Orientation: Back Wall 3: Wood Frame, 16" o.c. 380 23.0 0.0 0.055 21 Orientation: Right side C 3. .- 0.0 15.0 0.044 23 Window 2: Wood Frame 16 0.290 5 Orientation: Back Wall 3: Wood Frame, 16" o.c. 380 23.0 0.0 0.055 21 Orientation: Right side Basement: Solid Concrete or Masonry 520 0.0 15.0 0.044 23 Orientation: Front Wall height: 9.0' Depth below grade: 8.0' insulation depth: 9.0' Basement: Solid Concrete or Masonry 380 0.0 15.0 0.044 17 Orientation: Left side Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Basement: Solid Concrete or Masonry 520 0.0 15.0 0.044 23 Orientation: Back Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Basement: Solid Concrete or Masonry 380 0.0 15.0 0.053 18 Orientation: Right side Wall height: 9.0' Depth below grade: 5.0' Insulation depth: 9.0' Window: Wood Frame 20 0.290 6 Orientation: Right side Window 1: Wood Frame 20 0.290 6 Orientation: Right side Compliance Statement. The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building h signed to e the 2 09 IECC requirements in RE chec�kVSion�,ESlche/ck-Web and to comply with the mandat quirem fisted int check In ection Checklist. �( � ,�C�V Name - Title _ Signage Project Title: 2455 Grant Circle Report date: 09/28/20 Data filename: Page 2 of 8 Door: Glass Door (over 50% glazing) Orientation: Back Window 3: Wood Frame Orientation: Back Window: Wood Frame Orientation: Back Window 1: Wood Frame Orientation: Back Window 2: Wood Frame Orientation: Back Wall 3: Wood Frame, 16" o.c. Orientation: Left side Window 4: Wood Frame Orientation: Left side Window: Wood Frame Orientation: Left side Wall 4: Wood Frame, 16" o.c. Orientation: Front Window 5: Wood Frame Orientation: Front Window: Wood Frame Orientation: Front Window 1: Wood Frame Orientation: Front Wall 5: Wood Frame, 16" o.c. Orientation: Right side Window 6: Wood Frame Orientation: Right side Window: Wood Frame Orientation: Right side Window 1: Wood Frame Orientation: Right side Wall 6: Wood Frame, 16" o.c. Orientation: Back Wall 7: Wood Frame, 16" o.c. Orientation: Left side Window 7: Wood Frame Orientation: Left side Window: Wood Frame Orientation: Left side Basement: Solid Concrete or Masonry Orientation: Front Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Basement: Solid Concrete or Masonry Orientation: Right side Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Basement: Solid Concrete or Masonry Orientation: Back Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Basement: Solid Concrete or Masonry Orientation: Left side Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Project Title: Callahan Data filename: 18 0.290 5 36 0.280 10 36 0.280 10 8 0.280 2 40 0.290 12 345 23.0 0.0 0.055 17 13 0.280 4 24 0.280 7 549 23.0 0.0 0.055 26 29 0.290 8 29 0.290 8 11 0.280 3 345 23.0 0.0 0.055 15 29 0.290 8 29 0.290 8 6 0.280 2 549 23.0 0.0 0.055 30 345 23.0 0.0 0.055 16 24 0.290 7 24 0.290 7 549 0.0 15.0 0.044 24 345 0.0 15.0 0.044 15 549 0.0 15.0 0.044 24 345 0.0 15.0 0.044 13 Report date: 09/28/20 Page 2 of 9 Window: Wood Frame 22 0.290 b Orientation: Left side Window l: Wood Frame 22 0.290 Orientation: Left side Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has beer+~plesigned tp meet,,the 2009 IECC requirements in RESc eck Version : RE check -Web and to comply with the mandatory reg irerrie li ed ' e heck Inspection Checklist. 9 Name - Title Signatures Date Project Title: Callahan Report date: 09/28/20 Data filename: Page 3 of 9 REScheck Software Version Inspection Checklist Energy Code: 2009 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Sec ion Pre-Inspection/Plan Review Plans Verified Value Meld Verified Value Complies? Comments/Assumptions & Req.IR 103.2 Construction drawings and '❑Complies [PR111 (documentation demonstrate ; j❑Does Not energy code compliance for the !building !❑Nt Observable envelope. ❑Not Applicable 103.2, ;Construction drawings and i '❑Complies 403.7 documentation demonstrate UDoes Not [PR311 !energy code compliance for p !❑ ' Not Observable ;lighting and mechanical systems. i ❑Not Applicable !Systems serving multiple I I dwelling units must demonstrate compliance with the commercial code. 403.§ Heating and cooling equipment is: Heating: ; Heating: ;❑Complies [PR212 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not on loads per ACCA Manual J or ling: ;other Coolin Observable approved methods. Btu/hr Btu/hr ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 1 3'1 Low Impact (Tier 3) Project Title: Callahan Report date: 09/28/20 Data filename: Page 4 of 9 Section i Foundation Inspection plans Verified Value; Field Verified Value Complies? Comments/Assumptions & Req.I® 402.1.1 ; Conditioned basement wall ; R- ; R -❑Complies ;See the Envelope Assemblies [FO4]1 insulation R -value. Where interior: ❑Does Not ;table for values. ` F insulation is used, verification may need to occur during ;❑Not Observable I If Insulation Inspection. Not ; ;❑Not Applicable !required in warm -humid locations in Climate Zone 3. 303.2,Conditioned basement wall ;❑Complies [F05]1 ; insulation installed per I ❑Does Not !manufacturer's instructions. ❑Not Observable ❑Not Applicable 402.2.7 Conditioned basement wall ; ft ft ,❑Complies ;See the Envelope Assemblies [FO6]1 insulation depth of burial or ; ; ❑Does Not ;table for values. t � distance from top of wall. , ❑Not Observable ❑Not Applicable 303.2.1 iA protective covering is installed ❑Complies [FO11]2 to protect exposed exterior ! E❑Does Not insulation and extends a' !❑Not Observable ; minimum of 6 in. below grade. UNot Applicable 403.8 j Snow- and ice -melting system UComplies [FO12]2 ;controls installed. i ❑Does Not ; 1❑Not Observable ;❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Callahan Report date: 09/28/20 Data filename: Page 5 of 9 Section Framing;/ Rough -in Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.l® 402.1,1, ; Door U -factor. ; U- ; U- ;❑Complies ;See the Envelope Assemblies 402.3.4 ,❑Does Not ;table for values. [FR1]1❑Not Observable ; j ❑Not Applicable 402.1.1, ;Glazing U -factor (area -weighted U- U- ;❑Complies ;See the Envelope Assemblies table for values. 402,3.1, .average). ; I❑Does Not 402,3.3, � � � ;❑Not Observable 402.5 402.5❑Not Applicable 9 303.1.3 ; U -factors of fenestration products ; ❑Complies [FR4]1 are determined in accordance ❑Does Not Q11 with the NFRC test procedure or ?❑Not Observable ! taken from the default table. { '❑Not Applicable 402.4.4 ; Fenestration that is not site built ❑Complies [FR20]1 Hs listed and labeled as meeting I ❑Does Not !AAMA/WDMA/CSA 101/l.5.2/A440 ❑Not Observable or has infiltration rates per NFRC ; ❑Not Applicable 400 that do not exceed code . (limits. i ' 402.4.5 j IC -rated recessed lighting fixtures 1 ❑Complies [FR16]2 1 sealed at housing/interior finish ! ❑Does Not Viand labeled to indicate <_2.0 cfm 1❑Not Observable ;leakage at 75 Pa. 1 ❑Not Applicable 403.2,1 ;Supply ducts in attics are ; R- R- ;❑Complies ; [FR12]1 Hnsulated to >_R-8. All other ducts R- R- ;❑Does Not in unconditioned spaces or :❑Not Observable outside the building envelope are ; ❑Not Applicable ;insulated to >_R-6. 403.2.2 ;All joints and seams of air ducts, handlers, filter boxes, and I InComplies ❑Does Not [FR13]1 air !building cavities used as return ;ducts are sealed. i ; !❑Not Observable i❑Not Applicable 403,2.3 Building cavities are not used for ❑Complies [FR15]3 !supply ducts. ❑Does Not + i ,❑Not Observable s❑Not Applicable 403.3 HVAC piping conveying fluids R- R- 1❑Complies [FR17]2 above 105 °F or chilled fluids :❑Does Not below 55 °F are insulated to >_R j❑Not Observable 3'❑Not Applicable 403.4 Circulating service hot water R- R- ;❑Complies [FR18]2 pipes are insulated to R-2, '❑Does Not ❑Not Observable ; { ❑Not Applicable 4015 ;Automatic or gravity dampers are; (❑Complies [FR19]2 'installed on all outdoor air l❑Does Not j intakes and exhausts, ;❑Not Observable j ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13'1 Low Impact (Tier 3) Project Title: Callahan Report date: 09/28/20 Data filename: Page 6 of 9 Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Callahan Report date: 09/28/20 Data filename: Page 7 of 9 303.1 [IN13]2 ;All installed insulation is labeled ; I or the installed R -values f provided. P }❑Complies ; ❑Does Not i❑Not Observable ❑Not Applicable 402.1.1, 402.2.4, i Wall insulation R -value. If this is a R- mass wall with at least 1/z of the I ❑ Wood R- ; ❑ Wood ;❑Complies ;See the Envelope Assemblies ;Oboes Not table for values. 402.2.5 [IN3]1 wall insulation on the wall ; ❑ Mass ;exterior, the exterior insulation ❑ Mass ❑Not Observable ;requirement applies. E]Steel ElSteel �❑Not Applicable ; 303.2 ;Wall insulation is installed per '-]Complies [IN4)1 manufacturer's instructions. S❑Does Not F ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Callahan Report date: 09/28/20 Data filename: Page 7 of 9 Section Final Inspection Provisions Plans Verified Value-- Field Verified Value ���Comments/Assumptions & Reel.l® 402.1.1, ;Ceiling insulation R -value. Where R- R -❑Complies ;See the Envelope Assemblies 402.2.1, > R-30 is required, R-30 can be ❑ Wood ❑ Wood � table for values. ❑Does Not 402.2.2used [Fill';compressed if insulation is not ; ❑ Steel at eaves. R-30 may ❑ Steel �❑Not Observable 1 be used for 500 ft2 or 20% ; ;❑Not Applicable (whichever is less) where 1 sufficient space is not available. ; 303.1.1.1, ;Ceiling insulation installed per ; ❑Complies 303.2 ; manufacturer's instructions. ❑Does Not [1712]1 Blown insulation marked every ❑Not Observable - 300 ft2. ❑Not Applicable 402.2.3 ;Attic access hatch and door R- R- ;❑Complies [F1311 :insulation >R -value of the ❑]Does Not s adjacent assembly. ;❑Not Observable ❑Not Applicable 402.4.2, i Building envelope tightness ACH 50 = ACH 50 = I❑Complies 402.4.2.1 verified by blower door test result ❑Does Not j [F117]1 of <7 ACH at 50 Pa. This requirement may instead be met ; j ; ❑Not Observable ;via visual inspection, in which ; :[]Not Applicable :case verification may need to ;occur during Insulation ; Inspection. ; 403.2.2 ; Post construction duct tightness cfm cfm ;❑Comp lies [FI4]1 "test result of :58 cfm to outdoors, ❑Does Not for <_12 cfm across systems. Or, ❑Not Observable rough -in test result of 56 cfm ; ;❑Not Applicable I across systems or s4 cfm ; without air handler. Rough -in test ;verification may need to occur ; ;during Framing Inspection. 403.1.1 1 Programmable thermostats ; ❑Com lies P [FI 9]2 '1 installed on forced air furnaces. ❑Does Not SO { ❑Not Observable j❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI 10]2 ton heat pumps. 1EIDoes Not j 101 ❑Not Observable ❑Not Applicable 1 403.4 ;Circulating service hot water ;❑Complies [FI1132 'systems have automatic or ; '❑Does Not )accessible manual controls. ❑Not Observable 3❑Not Applicable 404.1 50% of lamps in permanent ❑Complies [FI6]1 Mixtures are high efficacy lamps. {❑Does Not a ❑Not Observable ❑Not Applicable 4013 ;Compliance certificate posted. ❑Complies [FI712 ❑Does Not j ❑Not Observable ; I❑Not Applicable 303.3 Manufacturer manuals for ❑Com lies p [F118]3 )mechanical and water heating ! ❑Does Not ;equipment have been provided. i �❑Not Observable r ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 "1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Callahan Report date: 09/28/20 Data filename: Page 8 of 9 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Callahan Report date: 09/28/20 Data filename: Page 9 of 9