ResCheckGenerated by REScheck-Web Software
Compliance Certificate
Project Callahan
Energy Code:
2009 IECC
Location:
Blair, Nebraska
Construction Type:
Single-family
Project Type:
New Construction
Orientation:
Bldg. faces 0 deg. from North
Conditioned Floor Area:
3,865 ft2
Glazing Area
15%
Climate Zone:
5 (6506 HDD)
Permit Date:
Permit Number:
7
Construction Site:
Owner/Agent:
Hidden Fawn Acres Sub Lot #1 Mallory Callahan
Blair, NE 68008
4
Designer/Contractor:
Jay Nielsen
J Nielsen Construction LLC
1730 State Street
Blair, NE 68008
nielsenhomesblair@gmail.com
Compliance: 18.2% Better Than Code Maximum UA: 537 Your UA: 439
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
nvelUe-Assem bi9es
Ceiling: Flat Ceiling or Scissor Truss
Ceiling 1: Flat Ceiling or Scissor Truss
Wall: Wood Frame, 16" o.c.
Orientation: Front
Door: Solid Door (under 50% glazing)
Orientation: Front
Window: Wood Frame
Orientation: Front
Window 1: Wood Frame
Orientation: Front
Window 2: Wood Frame
Orientation: Front
Wall 1: Wood Frame, 16" o.c.
Orientation: Right side
Window 3: Wood Frame
Orientation: Right side
Window: Wood Frame
Orientation: Right side
Window 1: Wood Frame
Orientation: Right side
Project Title: Callahan
Data filename:
950
0.0
50.0
0.019
18
1,086
0.0
50.0
0.019
21
549
23.0
0.0
0.055
24
39
0.190
7
16
0.280
4
36
0.290
10
16
0.290
5
345
23.0
0.0
0.055
16
12
0.290
3
27
0.290
8
24
0.290
7
549
23.0
0.0
0.055
23
Report date: 09/28/20
Page 1 of 9
Window 2: Wood Frame
16
Fr Jk
I
Orientation: Back
Wall 3: Wood Frame, 16" o.c.
380
23.0 0.0 0.055 21
Orientation: Right side
C 3.
.-
0.0 15.0 0.044 23
Window 2: Wood Frame
16
0.290 5
Orientation: Back
Wall 3: Wood Frame, 16" o.c.
380
23.0 0.0 0.055 21
Orientation: Right side
Basement: Solid Concrete or Masonry
520
0.0 15.0 0.044 23
Orientation: Front
Wall height: 9.0'
Depth below grade: 8.0'
insulation depth: 9.0'
Basement: Solid Concrete or Masonry
380
0.0 15.0 0.044 17
Orientation: Left side
Wall height: 9.0'
Depth below grade: 8.0'
Insulation depth: 9.0'
Basement: Solid Concrete or Masonry
520
0.0 15.0 0.044 23
Orientation: Back
Wall height: 9.0'
Depth below grade: 8.0'
Insulation depth: 9.0'
Basement: Solid Concrete or Masonry
380
0.0 15.0 0.053 18
Orientation: Right side
Wall height: 9.0'
Depth below grade: 5.0'
Insulation depth: 9.0'
Window: Wood Frame
20
0.290 6
Orientation: Right side
Window 1: Wood Frame
20
0.290 6
Orientation: Right side
Compliance Statement. The proposed building design described here is consistent with the building
plans, specifications, and other
calculations submitted with the permit application. The proposed building h
signed to
e the 2 09 IECC requirements in
RE chec�kVSion�,ESlche/ck-Web and to comply with the mandat quirem
fisted int
check In ection Checklist.
�(
�
,�C�V
Name - Title _ Signage
Project Title: 2455 Grant Circle Report date: 09/28/20
Data filename: Page 2 of 8
Door: Glass Door (over 50% glazing)
Orientation: Back
Window 3: Wood Frame
Orientation: Back
Window: Wood Frame
Orientation: Back
Window 1: Wood Frame
Orientation: Back
Window 2: Wood Frame
Orientation: Back
Wall 3: Wood Frame, 16" o.c.
Orientation: Left side
Window 4: Wood Frame
Orientation: Left side
Window: Wood Frame
Orientation: Left side
Wall 4: Wood Frame, 16" o.c.
Orientation: Front
Window 5: Wood Frame
Orientation: Front
Window: Wood Frame
Orientation: Front
Window 1: Wood Frame
Orientation: Front
Wall 5: Wood Frame, 16" o.c.
Orientation: Right side
Window 6: Wood Frame
Orientation: Right side
Window: Wood Frame
Orientation: Right side
Window 1: Wood Frame
Orientation: Right side
Wall 6: Wood Frame, 16" o.c.
Orientation: Back
Wall 7: Wood Frame, 16" o.c.
Orientation: Left side
Window 7: Wood Frame
Orientation: Left side
Window: Wood Frame
Orientation: Left side
Basement: Solid Concrete or Masonry
Orientation: Front
Wall height: 9.0'
Depth below grade: 8.0'
Insulation depth: 9.0'
Basement: Solid Concrete or Masonry
Orientation: Right side
Wall height: 9.0'
Depth below grade: 8.0'
Insulation depth: 9.0'
Basement: Solid Concrete or Masonry
Orientation: Back
Wall height: 9.0'
Depth below grade: 8.0'
Insulation depth: 9.0'
Basement: Solid Concrete or Masonry
Orientation: Left side
Wall height: 9.0'
Depth below grade: 8.0'
Insulation depth: 9.0'
Project Title: Callahan
Data filename:
18
0.290
5
36
0.280
10
36
0.280
10
8
0.280
2
40
0.290
12
345
23.0
0.0
0.055
17
13
0.280
4
24
0.280
7
549
23.0
0.0
0.055
26
29
0.290
8
29
0.290
8
11
0.280
3
345
23.0
0.0
0.055
15
29
0.290
8
29
0.290
8
6
0.280
2
549
23.0
0.0
0.055
30
345
23.0
0.0
0.055
16
24
0.290
7
24
0.290
7
549
0.0
15.0
0.044
24
345 0.0 15.0 0.044 15
549 0.0 15.0 0.044 24
345 0.0 15.0 0.044 13
Report date: 09/28/20
Page 2 of 9
Window: Wood Frame 22 0.290 b
Orientation: Left side
Window l: Wood Frame 22 0.290
Orientation: Left side
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has beer+~plesigned tp meet,,the 2009 IECC requirements in
RESc eck Version : RE check -Web and to comply with the mandatory reg irerrie li ed ' e heck Inspection Checklist.
9
Name - Title Signatures Date
Project Title: Callahan Report date: 09/28/20
Data filename: Page 3 of 9
REScheck Software Version
Inspection Checklist
Energy Code: 2009 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Sec ion
Pre-Inspection/Plan Review
Plans Verified
Value
Meld Verified
Value
Complies?
Comments/Assumptions
& Req.IR
103.2
Construction drawings and
'❑Complies
[PR111
(documentation demonstrate ;
j❑Does Not
energy code compliance for the
!building
!❑Nt Observable
envelope.
❑Not Applicable
103.2,
;Construction drawings and i
'❑Complies
403.7
documentation demonstrate
UDoes Not
[PR311
!energy code compliance for
p
!❑
'
Not Observable
;lighting and mechanical systems.
i
❑Not Applicable
!Systems serving multiple
I
I dwelling units must demonstrate
compliance with the commercial
code.
403.§
Heating and cooling equipment is: Heating:
; Heating:
;❑Complies
[PR212
sized per ACCA Manual S based Btu/hr
Btu/hr
❑Does Not
on loads per ACCA Manual J or ling:
;other
Coolin
Observable
approved methods. Btu/hr
Btu/hr
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 1 3'1 Low Impact (Tier 3)
Project Title: Callahan Report date: 09/28/20
Data filename: Page 4 of 9
Section
i
Foundation Inspection
plans Verified
Value;
Field Verified
Value
Complies?
Comments/Assumptions
& Req.I®
402.1.1
; Conditioned basement wall ; R-
; R -❑Complies ;See the Envelope Assemblies
[FO4]1
insulation R -value. Where interior:
❑Does Not ;table for values.
` F
insulation is used, verification
may need to occur during
;❑Not Observable
I
If Insulation Inspection. Not
; ;❑Not Applicable
!required in warm -humid locations
in Climate Zone 3.
303.2,Conditioned
basement wall
;❑Complies
[F05]1
; insulation installed per I
❑Does Not
!manufacturer's instructions.
❑Not Observable
❑Not Applicable
402.2.7
Conditioned basement wall ; ft
ft ,❑Complies ;See the Envelope Assemblies
[FO6]1
insulation depth of burial or ;
; ❑Does Not ;table for values.
t
� distance from top of wall. ,
❑Not Observable
❑Not Applicable
303.2.1
iA protective covering is installed
❑Complies
[FO11]2
to protect exposed exterior !
E❑Does Not
insulation and extends a'
!❑Not Observable ;
minimum of 6 in. below grade.
UNot Applicable
403.8
j Snow- and ice -melting system
UComplies
[FO12]2
;controls installed. i
❑Does Not ;
1❑Not Observable
;❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Callahan Report date: 09/28/20
Data filename: Page 5 of 9
Section
Framing;/ Rough -in Inspection
Plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
& Req.l®
402.1,1,
; Door U -factor.
; U- ; U-
;❑Complies ;See the Envelope Assemblies
402.3.4
,❑Does Not ;table for values.
[FR1]1❑Not
Observable ;
j
❑Not Applicable
402.1.1,
;Glazing U -factor (area -weighted
U- U-
;❑Complies ;See the Envelope Assemblies
table for values.
402,3.1,
.average).
;
I❑Does Not
402,3.3,
�
� �
;❑Not Observable
402.5
402.5❑Not
Applicable
9
303.1.3
; U -factors of fenestration products ;
❑Complies
[FR4]1
are determined in accordance
❑Does Not
Q11
with the NFRC test procedure or
?❑Not Observable
! taken from the default table.
{
'❑Not Applicable
402.4.4
; Fenestration that is not site built
❑Complies
[FR20]1
Hs listed and labeled as meeting
I
❑Does Not
!AAMA/WDMA/CSA 101/l.5.2/A440
❑Not Observable
or has infiltration rates per NFRC
;
❑Not Applicable
400 that do not exceed code
.
(limits.
i '
402.4.5
j IC -rated recessed lighting fixtures 1
❑Complies
[FR16]2
1 sealed at housing/interior finish
!
❑Does Not
Viand labeled to indicate <_2.0 cfm
1❑Not Observable
;leakage at 75 Pa.
1
❑Not Applicable
403.2,1
;Supply ducts in attics are
; R- R-
;❑Complies ;
[FR12]1
Hnsulated to >_R-8. All other ducts
R- R-
;❑Does Not
in unconditioned spaces or
:❑Not Observable
outside the building envelope are
;
❑Not Applicable
;insulated to >_R-6.
403.2.2
;All joints and seams of air ducts,
handlers, filter boxes, and
I
InComplies
❑Does Not
[FR13]1
air
!building cavities used as return
;ducts are sealed.
i ;
!❑Not Observable
i❑Not Applicable
403,2.3
Building cavities are not used for
❑Complies
[FR15]3
!supply ducts.
❑Does Not
+
i
,❑Not Observable
s❑Not Applicable
403.3
HVAC piping conveying fluids
R- R-
1❑Complies
[FR17]2
above 105 °F or chilled fluids
:❑Does Not
below 55 °F are insulated to >_R
j❑Not Observable
3'❑Not
Applicable
403.4
Circulating service hot water
R- R-
;❑Complies
[FR18]2
pipes are insulated to R-2,
'❑Does Not
❑Not Observable ;
{
❑Not Applicable
4015
;Automatic or gravity dampers are;
(❑Complies
[FR19]2
'installed on all outdoor air
l❑Does Not j
intakes and exhausts,
;❑Not Observable j
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13'1 Low Impact (Tier 3)
Project Title: Callahan Report date: 09/28/20
Data filename: Page 6 of 9
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Callahan Report date: 09/28/20
Data filename: Page 7 of 9
303.1
[IN13]2
;All installed insulation is labeled ;
I or the installed R -values f
provided. P
}❑Complies ;
❑Does Not
i❑Not Observable
❑Not Applicable
402.1.1,
402.2.4,
i Wall insulation R -value. If this is a R-
mass wall with at least 1/z of the I ❑ Wood
R-
; ❑ Wood
;❑Complies ;See the Envelope Assemblies
;Oboes Not table for values.
402.2.5
[IN3]1
wall insulation on the wall ; ❑ Mass
;exterior, the exterior insulation
❑ Mass
❑Not Observable
;requirement applies. E]Steel
ElSteel
�❑Not Applicable
;
303.2
;Wall insulation is installed per
'-]Complies
[IN4)1
manufacturer's instructions.
S❑Does Not
F
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Callahan Report date: 09/28/20
Data filename: Page 7 of 9
Section
Final Inspection Provisions
Plans Verified
Value--
Field Verified
Value
���Comments/Assumptions
& Reel.l®
402.1.1, ;Ceiling
insulation R -value. Where R-
R -❑Complies
;See the Envelope Assemblies
402.2.1,
> R-30 is required, R-30 can be ❑ Wood
❑ Wood
� table for values.
❑Does Not
402.2.2used
[Fill';compressed
if insulation is not ; ❑ Steel
at eaves. R-30 may
❑ Steel
�❑Not Observable
1 be used for 500 ft2 or 20% ;
;❑Not
Applicable
(whichever is less) where 1
sufficient space is not available.
;
303.1.1.1,
;Ceiling insulation installed per ;
❑Complies
303.2
; manufacturer's instructions.
❑Does Not
[1712]1
Blown insulation marked every
❑Not Observable
-
300 ft2.
❑Not Applicable
402.2.3
;Attic access hatch and door R-
R-
;❑Complies
[F1311
:insulation >R -value of the
❑]Does Not
s
adjacent assembly.
;❑Not Observable
❑Not Applicable
402.4.2,
i Building envelope tightness ACH 50 =
ACH 50 =
I❑Complies
402.4.2.1
verified by blower door test result
❑Does Not j
[F117]1
of <7 ACH at 50 Pa. This
requirement may instead be met ;
j ;
❑Not Observable
;via visual inspection, in which ;
:[]Not Applicable
:case verification may need to
;occur during Insulation ;
Inspection. ;
403.2.2
; Post construction duct tightness cfm
cfm
;❑Comp lies
[FI4]1
"test result of :58 cfm to outdoors,
❑Does Not
for <_12 cfm across systems. Or,
❑Not Observable
rough -in test result of 56 cfm
;
;❑Not Applicable
I across systems or s4 cfm
;
without air handler. Rough -in test
;verification may need to occur
;
;during Framing Inspection.
403.1.1
1 Programmable thermostats ;
❑Com lies
P
[FI 9]2
'1 installed on forced air furnaces.
❑Does Not
SO
{
❑Not Observable
j❑Not Applicable
403.1.2
Heat pump thermostat installed
❑Complies
[FI 10]2
ton heat pumps.
1EIDoes Not j
101
❑Not Observable
❑Not Applicable 1
403.4
;Circulating service hot water
;❑Complies
[FI1132
'systems have automatic or ;
'❑Does Not
)accessible manual controls.
❑Not Observable
3❑Not Applicable
404.1
50% of lamps in permanent
❑Complies
[FI6]1
Mixtures are high efficacy lamps.
{❑Does Not
a
❑Not Observable
❑Not Applicable
4013
;Compliance certificate posted.
❑Complies
[FI712
❑Does Not j
❑Not Observable ;
I❑Not Applicable
303.3
Manufacturer manuals for
❑Com lies
p
[F118]3
)mechanical and water heating !
❑Does Not
;equipment have been provided. i
�❑Not Observable
r
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 "1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Callahan Report date: 09/28/20
Data filename: Page 8 of 9
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Callahan Report date: 09/28/20
Data filename: Page 9 of 9