ResCheckEnergy Code:
2009 IECC
Location:
Omaha, Nebraska
Construction Type:
Single-family
Project Type:
New Construction
Conditioned Floor Area:
1,620 ft2
Glazing Area
19%
Climate Zone:
5 (6300 HDD)
Permit Date:
Permit Number:
Construction Site:
Owner/Agent: Designer/Contractor:
Omaha, NE
New Construction Architectural Plans
Compliance: 1.9% Better Than Code Maximum UA: 318 Your UA: 312
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
AIm
Ceiling area of home forming top of insulation envelope: Flat Ceiling or Scissor 1,620 38.0 0.0 O.u3u 49
Truss
Wall area of home forming sides of insulation envelope: Solid Concrete or 1,523 19.0 0.0 0.059 71
Masonry: Interior Insulation
Window area of home using energy efficient units: Vinyl/Fiberglass 244 0.290 71
Frame:Double Pane with Low -E
Energy efficient door unit: Solid
21
0.200
4
Energy efficient door unit: Glass
42
0.300
13
20 minute fire door: Solid
21
0.200
4
Basement wall area of home forming bottom of insulation envelope: Solid 1,474 0.0 6.0 0.068 100
Concrete or Masonry
Wall height: 9.0'
Depth below grade: 9.0'
Insulation depth: 9.0'
Compliance Statement, The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.7.0 and to comply with the mandatory requirements listed in the RESche�k Inspection Checklist.
lobe Leonard 5/5/2020
Name - Title Signature 0 Date
Project Title: Report date: 05/05/20
Data filename: C:\Users\New\Google Drive\Rescheckinfo Google Drive\OmahaNE.rck Page 1 of 7
REScheck Software i
C�J( Inspection Checklist
Energy Code: 2009 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans verified Field verified
f& Pre-inspection/Flan I?eview ] `/slue I value Complies? Comments/Assumptions
& Req.I13
_
__
❑Complies
103.2
Construction drawings and
❑Does Not
[PR111
documentation demonstrate
energy code compliance for the
❑Not Observable
building envelope.
❑Not Applicable
103.2,
Construction drawings and
;❑Complies
❑Does Not
403.7
documentation demonstrate
[PR311
energy code compliance for
❑Not Observable
lighting and mechanical systems.
❑Not Applicable
systems serving multiple
dwelling units must demonstrate
compliance with the commercial
code.
403.6
Heating and cooling equipment is !
_
Heating: Heating;
❑Complies
[PR2J2
sized per ACCA Manual S based
Btu/hr Btu/hr
❑Does Not
on loads per ACCA Manual J or
Cooling: Cooling:
❑Not Observable
-
other approved methods.
Btu/hr Btu/hr
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Report date: 05/05/20
Data filename: C:\Users\New\Google Drive\Rescheckinfo Google Drive\OmahaNE.rck Page 2 of 7
�� Foundation, Inspection �
Plans Verified
value
Meld verifled
value
Complies?
C,,,ments/Assumptions
Req.ID
402.1.1
Conditioned basement wall R-
R-
❑Complies see the Envelope Assemblies
table for values.
[F04]1
insulation R-value. Where interior
❑Does Not
j insulation is used, verification
;❑Not Observable
may need to occur during
❑Not Applicable
Insulation Inspection. Not
required in warm-humid locations
in Climate Zone 3.
303.2
Conditioned basement wall
❑Complies
[F05]'
insulation installed per
❑Does Not
s
manufacturer's instructions.
,❑Not Observable
❑Not Applicable
402.2.7
Conditioned basement wall ft
ft
❑Complies ;see the Envelope Assemblies
❑Does table for values.
[F0613
insulation depth of burial or
Not
distance from top of wall.
❑Not Observable
❑Not Applicable
303.2.1
;A protective covering is installed
❑Complies
[FO 11]2
`to protect exposed exterior
`❑Does Not
insulation and extends a
,❑Not Observable ,
-
:minimum of 6 in. below grade.
❑Not Applicable
403.8
Snow- and ice-melting system
❑Complies
[FO12]2
controls installed,
i❑Does Not
❑Not Observable
'❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2, Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Report date: 05/05/20
Data filename: C:\Users\New\Google Drive\Rescheckinfo Google Drive\OmahaNE.rck Page 3 of 7
Section
#
Fraa-ming / Rough -in Inspection
I
Flans Verified Field 'Verified Complies? C®ararraents/Assuanptia3rls
Value Value
Req'ID
402.1.1,
Door U -factor.
U- U-
❑Complies See the Envelope Assemblies
table for values.
402.3.4
❑Does Not
(FR1]1
❑Not Observable
❑Not Applicable
402.1.1,
Glazing U factor (area weighted
U U
❑Complies See the Envelope Assemblies
Not table for values.
402.3.1,
average).❑Does
402.3.3,
❑Not Observable
402.5
❑Not Applicable
[FR2]1
303.1.3
U -factors of fenestration products
:❑Complies
(FR4]1
are determined in accordance
;❑Does Not
with the NFRC test procedure or
!❑Not Observable
-
taken from the default table.
❑Not Applicable
402.4.4
Fenestration that is not site built
❑Complies
[FR20]1
is listed and labeled as meeting
'❑Does Not
;AAMA/WDMA/CSA 101/I.S.2/A440
❑Not Observable '.
or has infiltration rates per NFRC❑Not
Applicable
400 that do not exceed code
limits.
402.4.5
IC -rated recessed lighting fixtures
:❑Complies
❑Does Not
[FR16]2
sealed at housing/interior finish
and labeled to indicate _<2.0 cfm
❑Not Observable
leakage at 75 Pa.❑Not
Applicable
403.2.1
Supply ducts in attics are
R- R -❑Complies
❑Does Not
[FR12]1
insulated to >_R-8. All other ducts
R- R-
in unconditioned spaces or
❑Not Observable
outside the building envelope are
❑Not Applicable
insulated to >_R-6.
403.2.2
All joints and seams of air ducts,
❑Complies
❑Does Not
[FR13]1
air handlers, filter boxes, and
building cavities used as return
!❑Not Observable
ducts are sealed.
❑Not Applicable
403.2.3:
' Building cavities are not used for
'❑Complies
[FR15]3
;supply ducts.
❑Does Not
,❑Not Observable
'
❑Not Applicable.
403.3
HVAC piping conveying fluids
R- R-
❑Complies
[FR17]2
above 105 9F or chilled fluids
❑Does Not
below 55 9F are insulated to >_R
❑Not Observable
3.
❑Not Applicable
403.4
Circulating service hot water
R- R-
❑Complies
❑Does Not
(FR18]2
pipes are insulated to R-2.
,❑Not Observable ;
❑Not Applicable
403.5
Automatic or gravity dampers are
❑Complies
❑Does Not
[FR19]2
installed on all outdoor air
intakes and exhausts.
;❑Not Observable
[]Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2'+ Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Report date: 05/05/20
Data filename: C:\Users\New\Google Drive\Rescheckinfo Google Drive\OmahaNE.rck Page 4 of 7
Secti®nerified
Insulation inspection
plans rifi�:d
Field v
I
Complies?
C®rnrments/Assurerptirsns
vavelue
value
Re 113
303.1
All installed insulation is labeled
❑Complies
[IN13]2
or the installed R -values
E]Does Not
provided.
pNot Observable
E]Not Applicable
402.1.1,
Wall insulation R -value. If this is a:,
R-
R-
'.ElComplies See the Envelope Assemblies
402.2.4,
mass wall with at least 1A of the
Wood
❑ Wood
Oboes Not table for values.
402.2.5
wall insulation on the wall
EJ Mass
❑ Mass
;Not Observable
[IN3]1
exterior, the exterior insulation
E]Steel
E]Steel
E]Not Applicable
requirement applies.
303.2
Wall insulation is installed per
`
ElComplies
[IN4]1
manufacturer's instructions.
ElDoes Not
EINot Observable
ONot Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Report date: 05/05/20
Data filename: C:\Users\New\Google Drive\Rescheckinfo Google Drive\OmahaNE.rck Page 5 of 7
Sectiern
�#
I Final Inspection Provisions �
Y4
Maras Verified
Field Verified
I Compiles.
Cornrnents/Assumptions
Value
Value
& Req.ID
402.1.1,
Ceiling insulation R -value. Where
R- R-
❑Complies see the Envelope Assemblies
table for values.
❑Does
402.2.1,
> R-30 is required, R-30 can be
E] Wood ❑ Wood
Not
402.2.2
used if insulation is not
E] Steel ❑ Steel
❑Not Observable
[Fill'
compressed at eaves, R-30 may
❑Not Applicable
be used for 500 ftz or 20%
(whichever is less) where
sufficient space is not available.
303.1.1.1,
Ceiling insulation installed per
lElComplies
303.2
manufacturer's instructions.
'❑Does Not
[FI2]'
Blown insulation marked every
;❑Not Observable
300 ftz.
❑Not Applicable
402.2.3
Attic access hatch and door
R- R-
❑Complies
[FI3]'
insulation ?R -value of the
❑Does Not
adjacent assembly.
❑Not Observable
❑Not Applicable
402.4.2,
Building envelope tightness
ACH 50 = ACH 50 =
❑Complies
402.4.2.1
verified by blower door test result
❑Does Not
[FI17]'
of <7 ACH at 50 Pa. This
❑Not Observable
requirement may instead be met
❑Not Applicable
via visual inspection, in which
case verification may need to
occur during Insulation
Inspection.
403.2.2
Post construction duct tightness
% cfm cfm
❑Complies
[FI4]'
test result of :58 cfm to outdoors,
❑Does Not
or :512 cfm across systems. Or,
❑Not Observable
rough -in test result of :56 cfm
❑Not Applicable
across systems or <_4 cfm
without air handler. Rough -in test
verification may need to occur
during Framing Inspection.
403.1.1
Programmable thermostats
❑Complies
[Flg]2
installed on forced air furnaces.
❑Does Not
❑Not Observable
❑Not Applicable
403.1.2
Heat pump thermostat installed
❑Complies
[FI 10]2
on heat pumps.
❑Does Not
❑Not Observable
'❑Not Applicable
403.4
Circulating service hot water
❑Complies
[FIJI]2
systems have automatic or
❑Does Not
accessible manual controls.
❑Not Observable
�'❑Complies
❑Not Applicable
404.1
50% of lamps in permanent
[FI6]'
fixtures are high efficacy lamps.
❑Does Not
❑Not Observable
j❑Not Applicable
401.3
Compliance certificate posted.❑Complies
[F17]2
❑Does Not
1❑Not Observable
❑Not Applicable
303.3
Manufacturer manuals for
❑Complies
[FI18]3
, mechanical and water heating
❑Does Not
;equipment have been provided.
❑Not Observable .
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Report date: 05/05/20
Data filename: C:\Users\New\Google Drive\Rescheckinfo Google Drive\OmahaNE.rck Page 6 of 7
1 High Impact (Tier 1) 2 i' Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Report date: 05/05/20
Data filename: C:\Users\New\Google Drive\Rescheckinfo Google Drive\OmahaNE.rck Page 7 of 7