Loading...
BP7084BUILDING PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 Permit Application Date: - Issue Date: Permit Fee: $ ~~ JOB ADDRESS ~ ~ ~ ~ 1 ~ CC r ~~CC ~ l.. . ~~ ICJ LEGAL 1 LOT NO. BLK. TRACT ^ SEEATTACHEDSHEET ' DESCR. 2 0 NER ~ ~ ~ ~ MAIL AD I RESS ~ ~ ZIQP ~ 2 / PHONE O Vl C Ln 3 C NTRA T R ~r( MAIL DDRESS ~^ ~ S PHONE LICENSE N0. ~ i/~ni_ T-O~n~ v i ~~2 I' ~Z ~,~ 4. USE OF BUILDING 5, Class of Work: NEW ^ ADDITION ^ ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~ ~ _ c~ ,~, r ~ r ~ 7. Sq. Footage of Structure (IRduaing Basement and Garage): $, Change of Use From: Change of Use To: g, Valuation of Work: $ '33Q~ e Cj~ Floodway Yes^ No ^ 10 Floodplain: Dev.Permit Cert EIev . Fringa Yes^ No ^ BFE . . 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes ^ No ^ . 15. Minimum Setbacks: Front Side Rear_ 16. Sidewalk Required: Yes^ No ^ Waiver Approved APPLICATION ACCEPTED BY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I acknowledge chat payment of the building permit application fee does not constitute issuance of this building permit, I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days, is not completed within 2 years of the date of issuance, or if work is abandoned for six (8) months or longer, whichever is earliest. DATE Site Plan Attached ^ Complete Plans:Attached ^ Approximate Completion Date " ~ ~~ -~/ Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Building Footings Drywall (before finish) 7~ ~ ~ 7 Framing Final Electrical Rough-in Permanent Service Final Temporary Service Mechanical Rough-in ABC _ Final ~-" Ground Work Plumbing r SIG ATURE OF OWNER (IF OW BUILDER) DATE Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approved By: (/~'`-- 'OUNDS PRTG: BIeIr, NE Rev. Oela!