Loading...
BP6520Application Date: BUILDING PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 Permit Issue Date: C'" IH— Permit Fee: $ 6520 JOB ADDRESS 7_54� ll�J /.=-5( Inspections Required and Fees LEGAL 1 ' DESCR. DESCR.1 LOT NO. BLK• Sewer TRACT ❑SEE ATTACHED SHEET 2. OWNER ADDRESS ZIP PHONE 3. COT CTR MAILADDRE /PPNE LICENSENO. Cj(//,", 4. USE OF BUILDING (before finish) Framing 5. Class of Work: ❑ NEW ❑ ADDITION ❑ALTERATION ❑ REPAIR ❑ MOVE ® REMOVE 6. Describe Work: r i Final 7. Sq. Footage of Structure (Including Basement and Garage): Temporary Service 8. Change of Use From: Change of Use To: Rough -in 9, Valuation of Work: $ , SISb Q , o Final 10. Floodplain: Floodway Yes ❑ No [3Dev. Fringe Yes ❑ No 11BFE Permit EIev.Cert. Ground Work 11. Current Zoning: 12. State Fire Marshall Required: Yes ❑ Non 13. Special Use Permit Required: Yes ❑ No ❑ 14. Variance Required: Yes ❑ No ❑ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes ❑ No ❑ Waiver Approved _ ACCEPTEp BY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not comnle3ed within,2rmmof date Df issue. OF OWNER/CONTRACTOR OR AUTHORIZED AGENT DATE Site Plan Attached ❑ Complepirstt�che� Approximate Completion Date Y� Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Building Footings Drywall (before finish) Framing Final Electrical Rough -in Fixtures Final Permanent Service Temporary Service Mechanical Rough -in A\C Final Plumbing Ground Work SIGNATURE OF OWNER (IF OWNER BUILDER) DATE I Rough -in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approved o— OUNDS PRTG: Blair, NE Rev. 109 r