Loading...
BP5584BUILDING PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 Permit 5584 l 0 " Application Date: L Issue Date: () _ / � Permit Fee: $ JOB ADDRESS -�-) -9 q �- �6�_ Site Plan Attached ❑ Complete PI ns A hed ❑ Approximate Completion Date / -3l � LEGAL 1 ' DESCR. LOT NO. BLK. TRACT SEE ATTACHED SHEET 2. Mnryn ) C MAILADDRESS f ZIP V l 533IZW - HONE J 3. CONTR R MAILADDRESS PHONE LICENSE NO. 4. USE OF BUILDING Water Tap 5. Class of Work: ❑ NEW ❑ ADdTION ❑ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 6. Describe Work: %. Sq. Footage of Structure (Including Basement and Garage): Water Service 8. Change of Use From: Change of Use To: Septic 9, Valuation of Work: $ Sidewalk Required: Yes ❑No Waiver Approved 10 Floodplain: Floodway Yes ❑ No L'— Dev. Permit Fringe Yes❑ No 0� BFE Elev. Cert. 11. Current Zoning: Site Plan Attached ❑ Complete PI ns A hed ❑ Approximate Completion Date / -3l � 12. State Fire Marshall Required: Yes El No[? Inspections Required and Fees 13. Special Use Permit Required: Yes ❑ No utilities Sewer Tap Water Tap 14. Variance Required: Yes[:] No❑ Sewer Water Service 15. Minimum Setbacks: Front Side Rear Septic Remote Sidewalk Required: Yes ❑No Waiver Approved (Z16. Building H _ / Z q 4-- Footings Drywall 6-1116 j T N ACCEPTED BY PLANS CHECKED BY APPROVED FOR ISSUANCE BY (before finish) Framing Final A-�-5 NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the Electrical building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I Rough -in Fixtures have received a copy of this application form signed bythe Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth Final Permanent Service above and in accordance with the oodes/ordinances of the City of Blair and the State of Temporary Service Nebraska. I understand that this permit is void if work is not commenced within 180 days oris not tete within 2 y rs of date of iss �r1211 ' Mechanical Rough -in Final AIC SIGNATURE OF OWNERfCON RACTOR OR AUTHORIZED NT DATE Plumbing Ground Work Rough -in Final SIGNATURE OF OWNER (IF OWNER BUILDER) DATE WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approv d$y SOUNDS PRTG: Blair. NE Rev. 10/9 CITY OF BLAIR Application for Building Permit DT nm nr.nrl Address 1� 9 / X � ? 7, A-) a— Date O ZZ2 4 Legal Description: Lot Block Addition Please show all measurements of existing and contemplated structures, also show distances between structures, etc., and property lines. Is this a corner lot? C� Indicat�North Center Line of 7X Street Applicant