Loading...
BP6599BUILDING PERMIT APPLICATION ~~~~~ Jurlsdfctlon of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 6 5 9 9 (402) 426-4191 Permit ~ oa Application Date: ~ ] ~ Issue Date: Permit Fee: $ ~ r' JOB ADDRESS ~~ ~~ - LEGAL 1. DESCR. LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET 2 OWNER ~ L1~Y MAILADDRESS ZIP PHONE 3. CO CTOR ~,or n Id~r,~ MAILA DRES PHONE ~~ I L.~ z 3 ° 27 ~ LICENSENO. hlI ~au~c.~;~ ~P.o. - ~ n~.c~c~ Slo~o-p~~ USE OF BUILDING 4. 5. Class of Work: EW ^ ADDITION ^ ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~..U ~ I ]. Sq. FOOtage Of StrUCtUre (Including Basement and Garage): ~ ~( ~Q I` U 8, Change of Use From: Change of Use To: g, Valuation of Work: $ )o ~~~ 1O FIOOdplaln: Floodway Yes^ No Fringe Yes^ No Dev.Permit Elev. Cen. BFE 11. Current Zoning: ~ ~ 12. State Fire Marshall Required: Yes ^ Nom 13. Special Use Permit Required: Yes ^ No [~" 14. Variance Required: Yes^ Nod 15. Minimum Setbacks: Front Side ~ Rear ~' 16. Sidewalk Required: Yes^ No,~ Waiver Approved APPLICATION ACCEPTED BY I PLANS CHECKED BY I APPROVEp FOR ISSUANCE BY " v NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes~ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within 2 years of date of issue. SIGNATURE OF OWNERJCONTRACTOR OR AUTHARIZED AGENT DATE SIGNATURE OF OWNER (IF OWNER BUILDER) DATE I _ ~i C 1ci i Site Plan Attached ^ ~r om ~ ete Plans Attac ed Approximate Completion Date Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Septic Water Service Remote Building Footings c-2 t ~l ~~ Drywall (before finish) 1 Framing Final ~ Electrical f ~Or~ Rough-in Fixtures Final Permanent Service Temporary Service Rough-in F' I Mechanical y~bncG - ABC Ina Plumbing IV D~tY~ Ground Work Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approved By: ~" ~^ OUNDS PRTG: Blelr. NE Rev. 1001 's` _ ro 1. _~~ -•=1G r• rte - i r '?'~ ' t r r -v J ~ d m -~~ ' ; ~ ' . ~ ,: ~ ~' ~ r ,yam ~ ~ ~ ~ ° o ~ ~' •• ~' ~ `'~ ~~ ^ a~ o r- d q_ 't r a ad O y