Loading...
BP5857BUILDING PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 5857 (402) 426-4191 Permit Application Date: 5_ C,( - 9 q Issue Date: J5— [C) 3 [ Permit Fee: $ 1,5 ,00 JOB ADDRESS i I o � LEGAL 1 ' DESCR. LOT NO. BLK. TRACT ❑ SEE ATTACHED SHEET 2.OWNER �Lr MAILDRESS DRES ZIP 5 �3 �J � � � PHONE [� 3. CONTRACTOR MAILADDRESS PHONE LICENSE NO. 4. USE OF BUILDING 5. Class of Work: NEW ❑ ADDITION ❑ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 6. Describe Work: (__Q_I Wood L1, 2 � ! J,�au, Li ink- 7. Sq. Footage of Structure (Including Basement and Garage): 8. Change of Use From: Change of Use To: 9, Valuation of Work: $� 10. Floodplain: Floodway Yes ❑ No ❑ Fringe Yes No ❑ Dev. Permit BFE Elev. Cert. 11. Current Zoning: R M 1i 12. State Fire Marshall Required: Yes ❑ NoEf— 13. Special Use Permit Required: Yes ❑ No [T_ 14. Variance Required: Yes E] No0- 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes ❑ No []'fiver Approved BY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY I NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the oodes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or ls4t'Ompleted within 2 vearsvod date of issue. OFMNERICONTRACTOR OFrAUTHORIZED AGENT DATE Site Plan Attached ❑ Complete Plans Attached ❑ Approximate Completion Date Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Septic Footings Framing Rough -in Final Temporary Service Rough -in Final Ground Work SIGNATURE OF OWNER (IF OWNER BUILDER) DATE I Rough -in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Water Service Remote Building rywa� (befo inish) Final rical Fixtures — Permanent Service Mechanical AkC Plumbing Comment: Appro e By D -^ ��• � LNC C CITY OF BLAIR Application for Building Permit PLOT PLAN Address Date Legal Description: Lot Block Addition Please show all measurements of existing and contemplated structures, also show distances between structures, etc., and property lines. Is this a corner lot? l? e\ Q v a cate North 5O` _ —Center Line—of — _ — ��/ Street— _ �) %�/ Applicant