Loading...
BP5718BUILDING PERMITAPPLI Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 Permit 5718 ) Irr so Application Date: ~ ~~ 1~9~f' Issue Date: Permit Fee: $ ~ JOB ADDRESS .I ~ ~ \ ~ ~ _ ~ j 1 ' DESCR. LO~L ~~ ~ BLK. TRACT I ~ f ~ ~ _ I ~ ^ SEE ATTACHED SHEET 2. OWNER ~ ~~ MA DRESS ZIP ~~~ ~ ~~O PHONE 3 CONTRAC R MAILADDRESS P NE II rr LICENSE NO. 4. USE OF BUILDING 5. Class of Work: ^ NEW ^ ADDITION ^ ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~, ~~ ~~ 7. Sq. Footage of Structure (Ind~aing Besemenl and Garage): 8. Change of Use From: Change of Use To: g, Valuation of Work: $ ~ ~~~~ 11J Floodplain: Floodway Yes ^ No ^ Dev. Permit Fringe Yes^ No ^ BFE Elev. Cert. 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes^ No^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes ^ No ^ Waiver Approved _ APPLICATION ACCEPTED 8Y I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY ' NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permitapplication fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in acxordance with the codesJordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within 2 years of date of issue. - SIGNATURE OF OWNERfCONTRACTOR OR AUTHORIZED AGENT DATE SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Site Plan Attached ^ Complete Plans Attached ^ Approximate Completion Date ~~~I ~' Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Building Footings Drywall (before finish) ~/ ~ ~~9 Framing Final ! Electrical Rough-in Fixtures Final Permanent Service Temporary Service CATION Mechanical Rough-in ABC _ Final Plumbing Ground Work Rough-in Final , WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Appro By ~~ 1(1111Jf.C DGT(i _Glslr NC Gnv 1lIIO