Loading...
BP5509BUILDING PERMIT APPLI Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 Permit 5509 Application Date: ~ ~~~'~ ~ Issue Date: ~~~~ ~ _~/J ~~ Permit Fee: $ ~ '~ ~J JOB ADDRESS ~ I X r U ~ ~ ~ ~~U~~ I `UGL.~ LEGAL 1 ' DESCR. LOT N0. BLK. TRACT ^ SEE ATTACHED SHEET 2 OWNER ~,, ^) MAILADDRESS Zlp PHONE CONTRACTOR 3. ~ /Ssa~ /a~ ~. i-~~-c MAILADDRESS r ~/C ,~ PHONE . ~~/~~ ~1 S~- ~l,~~a~r~c LICENSE NO. /~~ C ~iz~ ~7~ -~~,~ 4. USE OF BUILDING 5. Class of Work: ^ NEW ^ ADDITION ^ ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~/ ,~ ~. ~ ~~~ ,~~ ~~ 7. Sq. Footage of Structure pnGuaing Besemem ana Garage): 8. Change of Use From: Change of Use To: g, Valuation of Work: $ 10. Floodplain: Floodway Yes ^ No ^ Fringe Yes^ No ^ Dev. Permit BFE Elev. Cert. 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes ^ No ^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes ^ No ^ Waiver Approved _ Site Plan Attached ^ Complete Plans Attached ^ Approximate Completion Date Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Z- ~S-Ry- o c-a.~~.A. `FoY` Building ~ ~ ~~ ~~ APPLICATION ACCEPTED BY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY Gl/~_ ' NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received acopy of this application form signed bythe Building Inspectorand stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes~ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or i not eted jthin 2 years of date of issue. J ~ ~ ~ - C~~-ice IGNATURE OF OWNER)~,ll RA TOR OR AUTHORIZED AGENT DATE ~/ SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Footings Drywall (before finish) Framing Final Electrical Rough-in Fixtures Final Permanent Service Temporary Service Mechanical Rough-in ABC Final ~<• ~~ ~ Plumbing Ground Work Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT CATION /c9. c~c~ Comment: Approve y~~^-~-'-- ^ ~ u~~ iune ooTr_ _ni-., ue `,'%>~J` Rwv_ 1(110