Loading...
BP6352BUILDING PERMIT APPLICATION ~-'~1ey Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 6 3 5 2 (402) 426-4191 Permit T QG Application Date: ~ ~ ~~ Issue Date: -~ ~ ~ ~~ ~ ~ ~ ~ Permit Fee: $ o~~~ JOB ADDRESS LEGAL 1 LOT NO. ~~ BLK. TRAC / .. ^ SEE ATTACHED SHEET ' DESCR. `J OW ER AI ADD_RE~yS~ ZIP PHONE ~ ~ 2. 3, CONTRAC MAILAD S ~~ PHONE ~ n ~ E EN . USE OF BUILDING 4. _ 5. Class of Work: ^ NEW ^ ADDITION ^ ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~ ~ 7, Sq. FOOtage Of StrUCture (Including Basement and Garage): ~~~ $, Change of Use From: Change of Use To: g, Valuation of Work: $ l ) ~ ~~ ~~ C d ~ laln: Floodway Yes^ No ~~ 10 FIOOd Dev. Permit Elev. Cert. p . Fringe Yes^ No Qs BFE 11. Current Zoning: ~~ 1~l 12. State Fire Marshall Required: Yes ^ No[-~ 13. Special Use Permit Required: Yes ^ No ~- 14. Variance Required: Yes^ No[~ 15. Minimum Setbacks: Front Side ,~_ Rear 16. Sidewalk Required: Yes No ^ Waiver Approved ACCEPTED BY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed bythe Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes~ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 1 SO days or~ot ~ ~et~within 2 year of~te of i ~e. SIGNATURE OF OWNERiCONTRACTOR OR AUTHORIZED AGENT DATE SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Site Plan Attached ^ Complete PI ns A ached LJ Approximate Completion Date ~~~~~~~ Inspections Required and Fees -co-<<~ ~. _~ Utilities Sewer Tap ~'l5 C.hk-~-- Water Tap ~'I~-`~~ Sewer ~`~ ~ `'~ Water Service /~~ =- s=~~ vs .5/ j Septic Remote Building Footings ~- ~- ~ ~~~~ Drywall ~'~~'~ `~ (before finish) Framing `~ Final /~' ~ S~~f ~ Electrical Rough-in ~~~{vn~~l(~5" Fixtures Final ~ ~1'1~ti~.~-- Permanent Service ~~~~ ~ 9~ Temporary Service Mechanical s. Rough-in ~~~E;y'/~ ~2~'c~- ABC ji'~z~`1~ l~<C~,~ Final ~~ ~-' Plumbing Ground Work ~`'i "tip' ~ ~ Rough-in ~~'~~ ~ ° Final ~/~~ WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approved B 5 ~ ~ ~ ~ e BUILDING PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 6 3 6 5 (402) 426-4191 Permit Application Date: ~.~-~- a Issue Date: ~ • 27~ S Permit Fee: $ ~ Z ~~ JOB ADDRESS I ~ \ ~ r~ r \~ I ^ r ~ ~~ YIN' V ~ V Ll/ t~ LEGAL 1 ' DESCR. LOT NO, BLK. TRACT ^ SEE ATTACHED SHEET 2 OWNER ~ r~ ~ I n ~~ MAILADDRESS ZIP PHONE `° l' ~I ~ ~~ ~(C i I O ~ RESS ~' I ^ / 1 ' ~x PH~ ~ ~~~ ~ ~ LICEySE NO~~ ~ 3. CONTRACTOR h l t('nt/1t I/ l~ '/F°n 0(i USE OF BUILDING 4. 5. Class of Work: NEW ^ ADDITION ^ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: I~f~USC. ~/~C,~ri ~ ]. Sq. FOOtage Of StrUCtUre (Including Basement and Garage): 8. Change of Use From: Change of Use To: g, Valuation of Work: $ 10. Floodplain: Floodway Yes ^ No ^ Dev. Permit Elev. Cert. Fringe Yes^ No ^ BFE 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes ^ No ^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes^ No ^ Waiver Approved _ BY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY ' / NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications setforth above and in accordance with the codes~ordinances of the City of Blair and the State of Nebraska. I derstand that this permit is void if work is not commenced within 180 days or is not co pleted withi 2 ears of da e_of_issue. /^ S GNATURE OF OWNERfC ACTOR OR AUTHORIZED AGENT DATE Site Plan Attached ^ Complete Plans Attached ^ Approximate Completion Date Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Building Footings Drywall (before finish) Framing Final Electrical ~ ~~? Rough-in Fixtures Final G ° C~ Permanent Service Temporary Service Mechanical Rough-in ABC Final Plumbing Ground Work SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS UR PERMIT Comment: Approved By: /j POUNDS PRTG: Blelr, NE ~~ Rev. 10/91 ~~ PPLICATION . BUILDING PERMIT A braska ° Jurisdiction of City of Blair, Ne 218 south 16th street 6 4 3 9 Blair, Nebraska 68008 permit (402) 426-4191 a_ Permit Fee: $ ~. ~ ~ J ~ ~ Issue Date: ~ ~ ~ ~ ~(,~ Application Date: JOB ADDRESS ~ O ~ O ~ ! 1 `~_~1`'`~Q`' ~(((„~~ TRACT [I SEE ATTACHED SHEET BLK. LEGAL LOT NO. PHONE 1 • DESCR. ZIP ' MAILADDRESS 2. OWNER ~ ~~ LICENSE NO. PHONE MAIL ADDRESS ~ ~ ~ ~ I b /~ r~ , ~~ j _ Z~ 3. CONTRALTO ~ ~~ " `'t cJ- G 4. USE OF BUILDING REMOVE ^ ADDITION ^ ALTERATION ^ REPAIR ^ MOVE ^ 5. Class of Work: ^ NEW 6. Describe Work: 7, Sq. FOOtage Of StfUCtUre (Including Basement and Garage): Change of Use To: $, Change of Use From: g, Valuation of Work: $ Floodway Yes^ No ^ 10. FIOOdplaln: Fringe Yes^ No ^ 11. Current Zoning: No^ 12. State Fire Marshall Required: Yes ^ 13. Special Use Permit Required: Yes ^ No ^ Dev. Permil RFE Elev. Cerl. 14. Variance Required: Yes ^ No ^ -Side Rear _ 15. Minimum Setbacks: Front 16. Sidewalk Required: Yes^ No ^ Waiver Approved APPLICATION ACCEPTED 8Y PLANS CHECKED 8Y APPROVED FOR ISSUANCE BY ~~_ NOTICE Separate permits are required for elsotn~l~elbelow,gl~achnowledgelthat payment of the tinning, and septic systems. By my g building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications setfort above and in accordance with the codes~ordinances of the City of Blair and the State of Nebraska. I understand that this permit is v id if work is not commenced within 180 days or is of com within 2 years of da f issue. DATE SIGNATURE OF OWNERiCONTRACTOR OR AUTHORIZED AGENT Site Plan Attached ^ Complete Plans Attached ^ Approximate Completion Date Inspections Required and Fees ~ UtilitiWaterTap ~~' Sewer Tap 7~ o0 Sewer ~ D,~ Water Service ~ ~ Septic Remote Building Footings Drywall (before finish) Framing Final Electrical Rough-in Fixtures Final Permanent Service Temporary Service Mechanical Rough-in ABC Final plumbing Ground Work ~ °% Rough-in /a ~s Final DATE SIGNATURE OF OWNER (IF OWNER BUILDER) WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMI Approved B~~ Comment: v Rev. 10~B ~ ~~ ~" ~ ~ Z ~ ~,~ : ~,~. 'z ~ r. ~••~ ~ rte"' ^ ^ ~ti,. ^ ~~,,~ ,.d O r (7 ~ ., ~ o x ~o .-3 ~ 0 0 "~ o o ~' o ~ c~ x n x a rn .-~ o ~ ~ ~ ~ ~ r '~- ~ d b ~ ~ o ~ ~ ~ ~ r ~ z z ~ ~ ~ ~ ~... -~ ~ z -~ --, to n c~ ,-~ .-~ ~~F o ~- ~ :-~ n ra r~ p ~ .~ ( a a ~ ~ .~L`~ o ~ c~ ~ d d , h u Lid ' ~ f. ~ `1 0 0 'cron ~-3 Z o 1r'~'. ~' ~ ° ~' f~ ~ • •~ 1 ~ r." rC ~? ,~ ~= ::, ~ ~ ~'' ~ rb ~ ^ ~.~i ,, i„3 1., 0 0 ra r. ~ h C9 ~ 0...-,. ~ Cb" ~ C~r7 ~ ~ trr7 v~ .. ~ d ~ ~'~ ~ i a ~~ ~ ~ ~ ^7 x ~ ~ ~ ~ ~ ~ b ~ ~ ~ a t~ ~ ~ ~ Z `C 6~ O ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ y~ d ~ ~ i ~ ~ ~ ~ b ~ ~ ~ ~ V. D C7 x l~,_ ~ ... _ 0 4 C~rx~~~ ~ 1 ~ ro ~ ~ C 0` •' ~ -n ~' ~ o '?d F .. ,~ e 0 ' ~ v; F .e ~ ~ ~N`" ~ ~ o ~~ . F o ~ ~~ ~ \ ~ ~ , ~; 0 0 . ~; . -, b a ° ~ O d • O ~ ~ ~, .. ,~ ° Z b ~' C tC '~. ~.' p p ~ i~ b ~ ~ ~ ~ ~ , r a ~~ ~~ ~ ~. z ~~ ~ n ~ ~ o ~ ~ ~ ~ ~.~ ° a ~ ~ ~ ~ ~ ~ z ~ ° ~ r-~ •~ ~ ~ ~ z ~~ ~ `^ ~. o a .- N~ y ~.... - - - , r o d ° ~ ° z ~ ~ ~ ~ ~ o. ~ c ~ b b o z ~ ..~ ry y O C7 70 ~ ^ ~7 (~ Q ~ ~, b ~ C QY y . ^~,.~ ~; m ~ ~ K,o . ~' n ry+ ~`"'~°' Off', ~ ~ .~ . ^ ~ , ~ ~b ~. .~ ~ ! ~ `° ~ ~ ;:. / S7 ' ± ~ N ~ 1r ~ - ,o ,, f p ``~. 4~^ JO . , o~ O. 'q promise Safley gales, Inc. 936 20th Avenue Circle Blair, KE 68008 City of Blair 218 South 1 bth Blair, Nebraska 68008 402-426-4191 Fax - 402-426-4195 July 19, 1995 Dear Harland, t has been brought to our attention., that Mr. Joe Block I 9, 1995 for his new contacted our office for water service on Toy date, you have not residence at 1010 20th Avenue CircleeCtion nor has your anyone contacted mechanical permitfforlth~~residenOe. obtained a nclosed you will find a copy of a letter which was -sent t.o E 1, 1994, explaining the purpose of and finalizing a all contractors prior to January the deposit -and requirements for- obtaining truction. • n ermit. one reason for the de emodel d con lack of finals bui l di g p that were being requested on new and r July 28• ou must contact our office by Friday, Therefore, Y to set up this .final inspection and have all permit fees pai 1995., or your deposit could be forfeited. m l with this and other We-hope, in the future, you will co p Y wilding permit requirements, and mites Y a final inspection prior ou obtain. We sincerely b on ALL building per to occupancy reciate your cooperation in this matter and hope to hear rom app you soon., Thank you. Sincerely. Rodney A• Storm City Administrator AP P LICATIOiV BUILDING PERMIT , ebraska Jurisdiction of Cfty of Blair, N 218 South 16th Street 6 612 Blair, Nebraska 68008 permit (402) 426-4191 ~_ '~I - c( SJ Permit Fee: $ Z r . Z `- L~ ~ Issue Date: Application Date: JOB ADDRESS I f>I I,~ `~ Oy-{'~ A,,p ~~r ~ l~j 1. V L BLK. , \ V~- TRACT ^ SEE ATTACHED SHEET LEGAL LOT NO. 1 • DESCR. ZIP PHONE. MAIL ADDRESS 2.OWNER ~~ls- ,/~ I~ ,. I~ t~ (~i PHONE LICENSE NO. 3 CONTRACTOR MAIL ADDRESS ~~[ ~ 5ci l~ ~roLf1 K vllcx:~ ~ 2 ~ l~c~ ~ l `7 S W« n ~ ~~~~ 4, USE OF BUILDING ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 5. Class of Work: ~ NEW ^ ADDITION ^ 6. Describe Work: I I V ~ ~ C ~ ~( ], Sq. FOOtage Of StrUCtUre (Including Basement and Garage): Change of Use To: $, Change of Use From: g, Valuation of Work: $ Floodway Yes^ No ^ 10. Floodplain: Fringe Yes^ No ^ Dev. Permit Elev. Cert. 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes ^ No ^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes^ No ^ Waiver Approved _ AC EPTED BY PLANS CHECKED BY APPROVED FOR ISSUANCE BY ,~C~~ ,~ NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit applicatlon fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed by the Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes~ordinances of the Ciry of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within 2 years of date of iss Site Plan Attached ^ Complete Plans Attached ^ Approximate Completion Date Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Building Footings Drywall (before finish) Framing Final Electrical Rough-in Fixtures Final Permanent Service Temporary Service Mechanical ~u- CX ~ ~ ^ f' Rough-in ~> , C)C~ ABC o-, , , ~~-~~=~N~` DATE Final ~ ~ ~ ~ Plumbin - rR~~ _ 9 ~""~ ~`~" ~'^`~" Ground Work Rough-in Final SIGNATURE OF OWNER (IF OWNER BUILDER) DATE WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approved By: Rev