Loading...
BP5214BUILDING PERMITAPPLI Jurisdiction of City of Blair, Nebraska - 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 Permit NA - - 5z~a Application Date: ~- `7 ~~- ~ Issue Date: ,~-- ~ ~~~ Permit Fee: $ JOB ADDRESS /_ " - ~ LEGAL 1 ' DESCR. LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET 2. OWNER Cc, /~~ ~~ MAILADDRESS ZIP ~ PHONE r3 CONTRACTOR ~~ ~ ~ ~ .- - ~~ IL ADDRESS ~~ ~ ~ ~~~~~ - ~ ~~~~ LI NS N0. ~ ~%/-~ ~~~~Z 4. USE OF BUILDING 5. Class of Work: ^ NEW ^ ADDITION ALTERATION REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~, _ , ~~ 7. Sq. FOOtage Of StrUCture (Including Basement and Garage): 8, Change of Use From: Change of Use To: g, Valuation of Work: $ ~ ~~, Permit 10. Floodplain: F~ rya ey B Yes[] No ~ FE Elev. Cert. ~ 1. current Zoning: 12. State Fire Marshall Required: Yes ^ Nod] 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes^ No^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Requirt~d: Yes^ No ^ Waiver Approved _ TION ACCEPTED BY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems, ~y my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy ofthls application form signed bythe Building Inspectorand stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes~ordinances of the City of Blair and the State of Nebraska. I understa d ~t this per it''s v id if e k is not commenced within 180 days or Is notes pleted i ~ years o d t of iss e ti~ IGNATU E OF OWNER~CONTRACTOR OR AUTHORI GENT DATE SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Site Plan Attached ^ Complete Plans Attached ^ Approximate Completion Date ~ -- y ~~ Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Septic Water Service Remote Building Footings Drywall (before finish) ~,~~ sF Framing Final ~~~~~°~ Electrical Rough-in Fixtures Final Permanent Service Temporary Service Rough-in Final _ Plumbing Ground Work Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT CAT10~1V Mechanical - ABC Comment: Approv ...,.- 'OUNDS PRTO: Blelr, NE