Loading...
BP4836~~ BUILDING PERMIT APPLI Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 Application Date: Issue Date ~--i? ~~ CATION N~ 4836 Permit #~ 31~~:3 Permit Fee: $ ~ D .DC> JOB ADD SS LEGAL 1 ' DESCR. LOT N0. BLK. TRACT ^ SEE ATTACHED SHEET 2, 0 NER ~ MAILADDRESS ~ ZIP PHONE ONTRACTOR/1 3. 'VVl ~C~ MAILAD RESS PHONE LICENSE NO. USE OF BUIL ING 4. 5. Class of Work: ^ NEW ^ ADDITION ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~ u` ~ G~-~~' 7. Sq. Footage of Structure (chiding Basement an arage): 8, Change of Use From: ~ C ~. Change of Use To: g, Valuation of Work: $ a G ~, , ~ 10. Floodplain: FI°cdway Yes No ^ Fringe Yes^ No ^ Dev. Permil Elev. Cert. BFE 11. Current Zoning: ~ Wl 12. State Fire Marshall Required: Yes ~' No^ 13. Special Use Permit Required: Yes ^ ~ No ^ 14. Variance Required: Yes ^ No ~] 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes ^ No ^ Waiver Approved _ APPLICATION ACCEPTED BY I PLANS CHECKED BY I APPRgV~ OR ISSUANCE BY NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of this application form signed bythe Building Inspector and stamped 'APPROVED'. I herebyagree to perform the proposed work in accordance with the specifications setforth above and in accordance with the codesJordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not ~pleted it 'n 2 years f date of issue. >< ~- r , ~~ SIGNATURE OF 0 NERt NT ACTOR OR AUTHORIZED AGENT DATE Site Plan Attached ^ Complete Plans Attached Approximate Completion Date 5 -~~" ~' Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Building Footings Drywall (before finish) Framing 'S Final ~~~~ ElectriCa~ , Rough-in ~Ic • ~`~'' °~~~~ ~ 3 Fixf"tireJs 4 ~ Final .~ ~=~t~~~ ~ 7 w ~~ Permanent Service Temporary Service Mechanical Rough-in ~ ABC _ Final ;~ Plumbing Ground Work ' l SIGNATURE OF OWNER (IF OWNER BUILDER) DATE I Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approv d ~~~ ~ ~~~ _....------ -.. .._ /vim/ °r~, aa~ tmo 53521 _.. _=1l81I a I1.'QII No~~ Project Title Laeelion ~~ ou'fpAT11=NT SPECIALIg'(5 CLIIJIC E9A5~MENY I`;~MaC~t;L-9C41~MQ'(IC PLAN MEMO~IIAI- COMMUNITY WoSPITAL ~LAlri , I,JE~t~ASKA Henntne~on, ourhsm 6 Nfchsrd~on, Inc. D I O "~ ~ I sY fJUl3A5 02000-09 DD I BUILDING PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street _ - Blair, Nebraska 68008 ~.:_~° _ _ 483 (402) 426-4191 Permit Application Date: ~ ~ ~ ~(Z Issue Date: ~'~ ~ ~ ~~~z° Permit Fee: $ JOB ADDRESS ~ ~ - Z 2 r1 c~ LEGAL 1 LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET ' DESCFt. 2. OWNER _ ~~ C-~,~~~ ,lC. MAI ADDRESS ~~ - t ~ ZIP PHONE 3. CONTRACTOR ~ `~ I „ ~N1AI ~ DRESS _(~ /~ ~ ~~ `ONE LICENSE N0. USE OF BUILDING 4. 5. Class of Work: ^ NEW ^ ADDITION ^ ALTERATION REPAIR ^ MOVE ^ REMOVE 6. Describe Work: _; , , ~ 0~ ~C~I ~C:~ ~' • ~~r r, 7. Sq. FOOtage Of StrUCture (Including Basement and Garage): $, Change of Use From: Change of Use To: g, Valuation of Work: $ 10. Floodplaln; Floodway Yes^ Frin e Y ^ No ^ Dev. Permit N ^ Elev. Cert. g es o BFE 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes ^ No ^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes^ No ^ Waiver Approved _ PLANS CHECKED BY I APPROVED FOB.ISSUANCE BY NOTICE Separate permits a required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copyof this application form signed bythe Building Inspectorand stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes~ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not~ompleted within 2 years of die of issue. SIGNA OF OWNER)CONTRACTO~W AUTHORIZED AGENT DATE Site Plan Attached ^ Complete Plans Attached ^ Approximate Completion Date ~~" ~~-- Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service _ Septic Remote Building Footings Drywall (before finish) Framing Final Electrical / Rough-in (_~ ~.~r~ Fixtures Final ~~- ~-~ Permanent Service Temporary Service Mechanical Rough-in ABC Final Plumbing Ground Work SIGNATURE OF OWNER (IF OWNER BUILDER) DATE ~ Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approved By.~-+-V POUNDS PRTG: Blelr, NE ne.. ~o~e~ ` CITY INSPECTION SLIPS Inspection has been requested for / ~ Location of Building By fame of Company On ' Type of nspection At ~ ~~~ D to ime Results of the Inspection are: ~ C~ Cit epresentative " ~~ ~ CITY INSPECTION SLIPS Inspection has been requested for z `'-'- Location o Building By ,~ Name of Co any On _ (Type of Inspection) At ~9 ~, n. ao~ _ Date Time Results of the inspection are: ~.~`" ~~ ~ ~~L.~~ ,g,,_ ~.,c~t ,. <,. ,~ ~,,, C ty Representative