Loading...
BP5111BUILDING PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 ~}Q 5111 (402) 426-4191 Permit Application Date: ~ (J'ZC.~ ~(~ Issue Date: ~() r2G "G~ Permit Fee: $ /~t~U JOB ADDRESS 1 LEGAL 1 ' DESCR. LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET ZIP PHONE 2, OWNER ~a C~ ~~~- MAILADDRESS .~ 3, CONTRACTOR~ ~ ~ ~ ~~~ ~ ,~1A~L~ QR~ SS ~Q~ 4 ~ I ~x/ ~' 2- HONG Ems' / r? ( " ~ ~2 aE NO. (-(~~ /`L, ~„C/N~"~/ USE OF BUILDING 4. 5. Class of Work: ^ NEW ^ ADDITION ALTERATION ^ REPAIR ^ MOVE []REMOVE 6. Describe Work: ~ ~ /'1(/jj(~J ], Sq. FOOtage Of StrUCture (Including Basement and Garage): 8, Change of Use From: Change of Use To: g, Valuation of Work: $ a ~d ~ 10. Floodplaln: Floodway Yes ^ No ^ Dev. Permil Elev. Cert. Fringe Yes^ No ^ BFE 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ 13. Special Use Permit Required: Yes ^ 14. Variance Required: Yes ^ No ^ Site Plan Attached ^ Complete Plans Attached ^ No ^ Approximate Completion Date ~~-~" 7 Inspections Required and Fees No ^ Utilities Sewer Tap Water Tap Sewer Water Service 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes^ No ^ Waiver Approved _ BY I PLANS CHECKED 8Y I APPROVED FOR ISSUANCE BY NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received acopy of this application form signed bythe Building Inspector and stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes~ordinances of the City of Blair and the State of Nebraska. I understand tha is ermit is void if work is not commenced within 180 days of is not.complete~0u'tG~~~of date of issue. / i E OF AGENT Septic Remote Building Footings Drywall (before finish) Framing Final 2- ~ 4 ~ Electrical Rough-in Fixtures Final Permanent Service Temporary Service Mechanical Rough-in ABC Final Ground Work Plumbing SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approved ~