Loading...
BP4972BUILDING PERMITAPPLICATIO~I Jurisdiction of City of Blair, Nebraska 218 South 16th Street _ _ Blair, Nebraska 68008 ~~ 4972 (402) 426-4191 Permit ~' ,. Application Date: ~:~ Issue Date: ~/~~~~-~~ Permit Fee: $ ~ O~ JOBADDRES J ~ T' / C LEGAL 1 ' DESCR. LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET 2. - L ESS ~ R J \ ONE 3. CONTRALTO MAIL ADDRESS NE ICENSENO. / USE OF BUILDING 4. 5. Class of Work: ^ NEW ADDITION ^ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~8 ~r , ~ ,~ ,~ /~G A 2 ]. Sq. FOOtage Of StrUCture (Including Basement and Garage): 8, Change of Use From: Change of Use To: g, Valuation of Work: $ ~ ~ 10. FIOOdplaln: Floodway Yes ^ Fringe Yes^ No ^ Dev. Permit No ^ BFE Elev. Cert. 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes^ No^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes ^ No ^ Waiver Approved _ AP ;~ f6t~~ TAD BY I PLANS CHECKED BY I APPROV~ R ICE BY NOTICE S parate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application.shall not be commenced until I have received acopy of this application form signed bythe Building Inspector and stamped ~~ 'APPROVED'. I hereby agree t e~orm the proposed work in accordance with the specifications setforth above and ' aca~yante with the codes~ordinances of the City of Blair and the State of Nebras . I t;nd~fstand that this pe~i s v id if work is not commenced within 180 days or is co ,p eted within 2 ye 9f~date issue, r SI~PGATURE OF OWNER)CONTRACTOR OB.AITrrIi~RIZED~4GENT ~ ' NATE Site Plan Attached ^ ~Eo plete Plans Att ch Approximate Completion Date I Inspections Required d Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Buil 'ng Footings ~ rywall (before finish) ~j~ n Framing Final ~P~~~ ~ -r~`i Electrical Rough-i Fixtures Final Permanent Service Tempor ry Service Mechanical Rough-in ABC Final Ground Work Plumbing SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approve By: /~~ /W/J/ 'OUNDS PRTG: Blelr, NE ~ Rev. 10~&