Loading...
BP4869BUILDING PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 Permit_ Application Date: '-, - ~ - 1 ~.- Issue Date: `~- ~ `~ ~~ ~ Permit Fee: $ ~ JOB ADDRESS ~y-1(~ a~~~ ~Y• LEGAL 1 , DESCR. LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET 2 OWNER ~~ h r I b ~ ~ MAILADD ~SS ~~ ~ ~ ZIP ~ ~ PHONE C 3, CONTRACTOR 1 I C r10 ~ 1 ~ r~ ~ s MAILADDRESS PHONE ~I C7 Z ~1~1 YV\ ~ v1 S LICENSE NO. o`. ~ ! C Z USE OF BUILDING 4. O +~~, 5. Class of Work: ^ NEW ^ ADDITION ^ALTERATION ~®.REPAIR ^ MOVE ^ REMOVE 6. Describe Work: ~ Y-~ ~ ~ R ~ ( ~ ~ o a ,r o n ~~ 7, Sq. FOOtage Of StfUCture (Including Basement and Garage): 8, Change of Use From: Change of Use To: g, Valuation of Work: $ ~ ~ ~ ~ ~ 00 10. Floodplain: Flooawey Yes ^ No ^ Fringe Yes^ No ^ Dev. Permit BFE Elev. Cert. 11. Current Zoning: 12. State Fire Marshall Required: Yes ^ No^ 13. Special Use Permit Required: Yes ^ No ^ 14. Variance Required: Yes^ No^ 15. Minimum Setbacks: Front Side Rear 16. Sidewalk Required: Yes ^ No ^ Waiver Approved _ APPLICATION ACCEPTED eY I PLANS CHECKED BY I APPROVED FOR ISSUANCE BY NOTICE Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a wpy of this application form signed bythe Building Inspectorand stamped 'APPROVED'. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes~ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within 2 years of date of issue. OR AUTHORIZED AGENT DATE Site Plan Attached ^ Complete Plans Attached ^ Approximate Completion Date L~_ I S -q Z Inspections Required and Fees Utilities Sewer Tap Water Tap Sewer Water Service Septic Remote Building ~- ~~ 1 Footings Drywall (before finish Framing Final G 2 Electrical Rough-in Fixtures Final Permanent Service Temporary Service Mechanical Rough-in ABC Final ~.~~~~~ /~ ~~ez g round Work Plumbing SI~TURE 0 OWNER (IF OWNE BUILDER) DATE Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: ##3`~~3 4 ~® 4869 POUNDS PRTG: Bleb, NE ~ Rev. 1091